Heartland Divide wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Heartland Divide wind farm is an operating wind farm in Audubon County, Iowa, United States.
Project Details
Table 1: Phase-level project details for Heartland Divide wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2018[1] | 104 MW[2] | Onshore[2] | NextEra Energy Inc [100%][3] | NextEra Energy[4] |
2 | Operating[5] | 2022[5] | 200 MW[6] | Onshore[5] | NextEra Energy Inc [100%][6] | NextEra Energy[7] |
Location
Table 2: Phase-level location details for Heartland Divide wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Audubon County, Iowa, United States[2] | 41.7588, -94.7951 (exact)[2] |
2 | Audubon County, Iowa, United States[2] | 41.7588, -94.7951 (exact)[2] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - ↑ (PDF) https://web.archive.org/web/20240131010139/https://www.nexteraenergyresources.com/content/dam/neer/us/en/pdf/portfolio_by_fuel.pdf. Archived from the original (PDF) on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131013720/https://www.cipco.net/nextera-energy-resources-cipco-break-ground-heartland-divide-wind-energy-center. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 6.0 6.1 https://web.archive.org/web/20240125180231/https://www.nexteraenergyresources.com/heartland-divide-II-wind/project-overview.html. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210923162005/http://validate.perfdrive.com/310485275b654f1ae6dca367c051a755/captcha?ssa=5abda988-92a5-9329-bb89-b70984998888&ssb=6l0d34dkh6fh4gahcf4ez6f54&ssc=lensa.com%2Fwind-technician-iii-heartland-divide-ii-audubon-ia-jobs%2Faudubon%2Fjd%2Faff9068b39f26451edb3c5bda8a0b0c5&ssd=584558190995541&sse=g@gkmd@ndjgbdij&ssf=2694b86457c8e5d5dc49a150389f7779ce32f658&ssg=1706822f-3f61-c884-61f9-e455dea34921&ssh=f75e2897-b32b-85ef-029b-b445ef935ddd&ssi=c8d0ffde-b7e9-539a-3d48-1fdd8c3c2bdd&ssj=b27ac0ca-084c-ee51-579e-0258ea518188&ssk=support@shieldsquare.com&ssl=929314164731&ssm=13147110911417457107391631894409&ssn=e9509070608d0bc4cebe0dc62ecfee2f40054855a3bb-b7b1-af5a-9896a1&sso=7989c993-82c8a1fba6912c2cfd117d218da155058646fc3a1c3d863c&ssp=81123362851632475889163245076853202&ssq=36595411400577470830414005976253242707056&ssr=MjA3LjI0MS4yMjUuMTYy&sss=Mozilla/4.0%20(Windows%20NT%205.1)%20AppleWebKit/535.7%20(KHTML,like%20zeco)%20Chrome/33.0.1750.154%20Safari/536.7&sst=Mozilla/5.0%20(Windows%20NT%2010.0;%20Win64;%20x64)%20AppleWebKit/537.36%20(KHTML,%20like%20Gecko)%20Chrome/74.0.3729.169%20Safari/537.36&ssu=Chrome/5.0%20(iPhone;%20U;%20CPU%20iPhone%20OS%203_0%20like%20Mac%20OS%20X;%20en-us)%20AppleWebKit/528.18%20(KHTML,%20like%20Gecko)%20Version/4.0%20Mobile/7A341%20Safari/528.16&ssv=4v941vvp22lsmos&ssw=&ssx=400629318916987&ssy=onpcjaigmholkjlhoonoln@k@fdao@c@coimmgpg&ssz=1e0e7750a594256. Archived from the original on 23 September 2021.
{{cite web}}
: Missing or empty|title=
(help)