Hebei Cangdong power station (国家能源集团河北沧东发电厂) is an operating power station of at least 3180-megawatts (MW) in Xincun Town, Lingang, Cangzhou, Hebei, China with multiple units, some of which are not currently operating. It is also known as 神华国华沧东发电厂; Huanghua Cangzhou power station, 国能河北沧东电厂三期2x660兆瓦机组扩建工程.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Hebei Cangdong power station Xincun Town, Lingang, Cangzhou, Hebei, China 38.31, 117.8786111 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 38.31, 117.8786111

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Phase I Unit 1 Operating coal: bituminous[2] 600 subcritical yes 2005 False
Phase I Unit 2 Operating coal: bituminous[2] 600 subcritical yes 2006 False
Phase II Unit 3 Operating coal: bituminous[2] 660 supercritical 2009 False
Phase II Unit 4 Operating coal: bituminous[2] 660 supercritical 2009 False
Phase III Unit 5 Operating[3][4] coal: bituminous[2][1] 660[1] ultra-supercritical[1] 2026[4] False
Phase III Unit 6 Construction[3] coal: bituminous[2][1] 660[1] ultra-supercritical[1] 2025 (planned) False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Hebei Guohua Cangdong Power Plant [100%] China Shenhua Energy Co Ltd [51.0%]; Hebei Construction Investment Energy Investment Co Ltd [40.0%]; Cangzhou Construction Investment Group Co Ltd [4.5%]; Hebei Hengfeng Power Generation Co Ltd Trade Union Committee [2.9%]; Guanxu Investment [1.6%]
Phase I Unit 2 Hebei Guohua Cangdong Power Plant [100%] China Shenhua Energy Co Ltd [51.0%]; Hebei Construction Investment Energy Investment Co Ltd [40.0%]; Cangzhou Construction Investment Group Co Ltd [4.5%]; Hebei Hengfeng Power Generation Co Ltd Trade Union Committee [2.9%]; Guanxu Investment [1.6%]
Phase II Unit 3 Hebei Guohua Cangdong Power Plant [100%] China Shenhua Energy Co Ltd [51.0%]; Hebei Construction Investment Energy Investment Co Ltd [40.0%]; Cangzhou Construction Investment Group Co Ltd [4.5%]; Hebei Hengfeng Power Generation Co Ltd Trade Union Committee [2.9%]; Guanxu Investment [1.6%]
Phase II Unit 4 Hebei Guohua Cangdong Power Plant [100%] China Shenhua Energy Co Ltd [51.0%]; Hebei Construction Investment Energy Investment Co Ltd [40.0%]; Cangzhou Construction Investment Group Co Ltd [4.5%]; Hebei Hengfeng Power Generation Co Ltd Trade Union Committee [2.9%]; Guanxu Investment [1.6%]
Phase III Unit 5 Hebei Guohua Cangdong Power Plant [100%] China Shenhua Energy Co Ltd [51.0%]; Hebei Construction Investment Energy Investment Co Ltd [40.0%]; Cangzhou Construction Investment Group Co Ltd [4.5%]; Hebei Hengfeng Power Generation Co Ltd Trade Union Committee [2.9%]; Guanxu Investment [1.6%]
Phase III Unit 6 Hebei Guohua Cangdong Power Plant [100%] China Shenhua Energy Co Ltd [51.0%]; Hebei Construction Investment Energy Investment Co Ltd [40.0%]; Cangzhou Construction Investment Group Co Ltd [4.5%]; Hebei Hengfeng Power Generation Co Ltd Trade Union Committee [2.9%]; Guanxu Investment [1.6%]

Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

Hebei Cangdong power station (formerly referred to as the Huanghua Cangzhou power station) is a four-unit coal-fired power plant with a total capacity of 2,520 MW. The plant was completed between 2005 and 2009, and was originally owned by Shenhua.[5][6]

It is located within Huanghua Port area, which is also owned by Shenhua Guoup. Huanghua Port is the No.1 coal port in China. Its coal throughout reached 270 million tons in 2017. The power station was built on the artificial land and is using desalted sea water. The power plant features its "no fresh water consumption, no land occupation, and no coal source transportation".[7]

Expansion

On December 29, 2022, an additional 2 x 660 MW units were permitted.[8][9][10]

This 2×660MW expansion project received approval in December 2022[11] and progressed through design and equipment procurement in 2023[12].

In 2024, construction activities accelerated with the start of the foundation work[13] and the first concrete pour for the chimney in August[14].

Construction continued through 2025[15], and Unit 5 was successfully commissioned in June 2026[16].

Unit 6 construction progressed alongside Unit 5, with installation work continuing throughout 2025-2026.

Ownership

On August 28, 2017, China's State-owned Assets Supervision and Administration Commission of the State Council (SASAC) announced that China Guodian Corporation and Shenhua Group will be jointly restructured. Shenhua Group will become China National Energy Investment Group and will absorb China Guodian Corporation. It will be the largest power company in the world by installed capacity, as well as the world's largest coal producer.[17][18] The merger was completed on November 28, 2017.[19]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://news.bjx.com.cn/html/20231207/1348447.shtml. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://mp.weixin.qq.com/s/7juhKwbvKoR5caRO8Agq6g. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://news.bjx.com.cn/html/20260629/1502043.shtml. {{cite web}}: Missing or empty |title= (help)
  5. Huanghua (Cangdong) Coal Power Plant China, Global Energy Observatory, accessed Sept. 2015.
  6. "中国神华旗下黄骅电力4号机组投产"Sohu-中国证券报, 2009-12-03
  7. "河北国华沧东电厂"Baidu Baike
  8. "河北公司国能沧东电厂国能河北沧东电厂三期2×660MW机组扩建工程环境影响评价咨询服务单一来源项目采购," November 4, 2022
  9. "国家能源集团河北沧东电厂三期2×660兆瓦机组扩建工程获得核准," BJX, 2023-01-03
  10. Permit date retrieved at hbzwfw (accessed January 2023)
  11. "国能河北沧东电厂三期2×660MW机组扩建工程核准". 北极星电力网. 2023-01-03. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  12. "中国能建中标国能河北沧东电厂三期2×660兆瓦机组扩建工程勘察设计". 北极星电力网. 2023-09-06. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  13. "河北公司沧东电厂三期扩建工程#5、#6锅炉房基桩施工灌注桩顺利开钻". 北极星电力网. 2024-05-06. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  14. "国能沧东电厂三期2×660MW机组烟囱工程顺利浇筑第一罐混凝土". WeChat. 2024-08-28. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  15. "国家能源集团2024年第四季度第一批四大管道集中采购(1标段)公开招标中标结果公告". 北极星电力网. 2025-03-05. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  16. "国能河北沧东电厂三期2×660兆瓦机组扩建工程5号机组完成168小时满负荷试运行". WeChat. 2026-06-23. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  17. "Factbox: Shenhua and Guodian - China's latest state marriage". Reuters. 29 August 2017. Retrieved 30 August 2017.
  18. "China Is Creating the World's Largest Power Company". Bloomberg News. 28 August 2017. Retrieved 29 August 2017.
  19. "China’s Newly-Established National Energy Investment Group Sets World Records in Its Sector, With Assets of Over CNY1.8 Trillion," Yicai Global, 11-28-2017