Hebei Taihang Iron and Steel Group Co., Ltd. Gas Power Project

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Hebei Taihang Iron and Steel Group Co., Ltd. Gas Power Project (河北太行钢铁集团有限公司高炉煤气余热发电工程 (Unit 1-1), 河北太行钢铁集团有限公司高炉煤气余热发电工程 (Unit 1-2), 河北太行钢铁集团有限公司高炉煤气余热发电工程 (Unit 1-3), 河北太行钢铁集团有限公司高炉煤气余热发电工程 (Unit 1-4), 河北太行钢铁集团有限公司 1×100MW 亚临界超高温煤气发电工程项目 (Unit 2-1), 河北太行钢铁集团有限公司 1×100MW 亚临界超高温煤气发电工程项目 (Unit 2-2)) is an operating power station of at least 300-megawatts (MW) in Handan, Wu'an County, Hebei, China with multiple units, some of which are not currently operating. It is also known as 河北太行钢铁焦电联产项目余热发电工程 (Units 1-1, 1-2), 河北太行钢铁集团有限公司2X80MW亚临界超高温煤气发电工程工程 (Units 1-1, 1-2), 河北太行钢铁集团有限公司焦电联产项目 (Units 1-3, 1-4).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Hebei Taihang Iron and Steel Group Co., Ltd. Gas Power Project Handan, Wu'an County, Hebei, China 36.607091, 114.076248 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1-1, Unit 1-2, Unit 1-3, Unit 1-4, Unit 2-1, Unit 2-2: 36.607091, 114.076248

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1-1 operating[2] industrial by-product - blast furnace gas[3][4][1] 85[3][4][1] steam turbine[1] 2022[3]
Unit 1-2 operating[2] industrial by-product - blast furnace gas[3][4][1] 85[3][4][1] steam turbine[1] 2022[3]
Unit 1-3 operating[2] industrial by-product - blast furnace gas[5] 65[5] steam turbine[5] 2023[6]
Unit 1-4 operating[2] industrial by-product - blast furnace gas[5] 65[5] steam turbine[5] 2023[4]
Unit 2-1 pre-permit[7][8] industrial by-product - blast furnace gas[9][8] 100[9][8] steam turbine[8]
Unit 2-2 announced[9] industrial by-product - blast furnace gas[9][8] 100[9][8] steam turbine[9]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1-1 Hebei Taihang Iron and Steel Group Co Ltd [100.0%]
Unit 1-2 Hebei Taihang Iron and Steel Group Co Ltd [100.0%]
Unit 1-3 Hebei Taihang Iron and Steel Group Co Ltd [100.0%]
Unit 1-4 Hebei Taihang Iron and Steel Group Co Ltd [100.0%]
Unit 2-1 Hebei Taihang Iron and Steel Group Co Ltd [100.0%]
Unit 2-2 Hebei Taihang Iron and Steel Group Co Ltd [100.0%]

Project-level captive use details

Background

The first phase of Hebei Taihang Iron and Steel Group Co., Ltd. Gas Power Project (河北太行钢铁集团有限公司高炉煤气余热发电工程) for waste heat power generation includes a total of 4 steam turbine generator units. Unit 1-1 and Unit 1-2 completed construction in February 2022. [10]Unit 1-3 and Unit 1-4 completed construction in November 2022.[11] In July 2023, the successful grid connection of Unit 1-4 marked the comprehensive completion and commencement of operation of this project.[12]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://www.dlzb.com/d-g-126569.html. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 http://www.csteelnews.com/xwzx/yjgg/202307/t20230711_76922.html. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://www.taihangsteel.cn/news/44.html. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 https://www.cnfeol.com/gangtie/n_083706380878.aspx. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 https://www.taihangsteel.cn/news/61.html. {{cite web}}: Missing or empty |title= (help)
  6. https://www.taihangsteel.cn/news/62.html. {{cite web}}: Missing or empty |title= (help)
  7. http://www.hpbgb.com/article.php?id=829884. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 http://hdwa.hbzwfw.gov.cn/art/2022/12/26/art_423_154280.html. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 https://web.archive.org/web/20230608052512/http://www.ccepc.com/project_achievements_energy/1367.html. Archived from the original on 08 June 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  10. "河北太行钢铁集团有限公司重组搬迁改造项目一期工程竣工环境保护(阶段性)验收监测报告的验收公示". 2022-02-08. Retrieved 2023-11-09.{{cite web}}: CS1 maint: url-status (link)
  11. "河北太行钢铁集团有限公司 关于"河北太行钢铁集团有限公司焦电联产项目"竣工公示". 2022-11-20. Retrieved 2023-11-09.{{cite web}}: CS1 maint: url-status (link)
  12. "中冶京诚总承包的太行钢铁余热发电工程全面建成投产". 2023-07-11. Retrieved 2023-11-09.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.