Background

The company plans to retreat from the city to Wu'an Industrial Park at the end of 2023, eliminate existing equipment, and build a 1430m3 blast furnace and a 120-ton Basic Oxygen Furnace.[2]


Plant Details

Table 1: General Plant Details

Plant status Start date Closed date Workforce size
operating[1] 2003[1] 2023[3] 2322[4]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Owner Owner company PermID
Hebei Puyang Industrial Group Co., Ltd. [33.2%]; LONGXIANG HOLDINGS LIMITED [17.9%]; Other [49%][4] GEM0000530 [33.2%]; GEM0000419 [17.9%]; GEM0000000 [49%] Hebei Xin Wu'an Steel Group Wen'an Iron and Steel Co., Ltd.[4] GEM0000087

Table 3: Process and Products

Steel product category Steel products ISO 14001 ISO 50001 Main production equipment Detailed production equipment
finished rolled[5] hot-rolled steel strip, hot-rolled round bar, hot-rolled round wire rod[5] yes[1] yes[1] blast furnace (BF) and basic oxygen furnace (BOF)[6] 2 BOF (2x60-tonne)[7]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum):

Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
2200 TTPA[8] 2200 TTPA

Table 5: Crude Iron Production Capacities (thousand tonnes per annum):

Blast furnace capacity Nominal iron capacity (total)
3400 TTPA[8] 3400 TTPA


Blast Furnace Details

Table 6: Blast Furnace Details:

Unit name Status Stop date Current size Current capacity
4 operating[3] October 2023[3] 510 m³[9] 570 TTPA[3]
5 operating[3] October 2023[3] 510 m³[9] 570 TTPA[3]
1 operating[3] October 2023[3] 1080 m³[9] 910 TTPA[3]
unknown retired[10] 420 m³[9] 500 TTPA[11]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker and Global Blast Furnace Tracker on the Global Energy Monitor website.

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20220112174449/http://www.grandsinosteel.com/jituanjieshao/. Archived from the original on 2022-01-12. {{cite web}}: Missing or empty |title= (help)
  2. 河北普阳钢铁有限公司河北新武安钢铁集团文安钢铁有限公司整合重组升级改造项目产能减量置换方案公告,河北省工业和信息化厅,December 23, 2021
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 http://gxt.hebei.gov.cn/hbgyhxxht/xwzx32/tzgg83/895044/index.html. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://www.qcc.com/firm/a6ddce2326f425a1acac36edf6a0b1a7.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20220120020634/http://www.grandsinosteel.com/chanpinjieshao/. Archived from the original on 2022-01-20. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 2022-02-07. {{cite web}}: Missing or empty |title= (help)
  7. (PDF) https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml;http://www.wuan.gov.cn/wasxxgk/bmxx/zfxt/shbfj/202105/P020210525583892556371.pdf. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20211205184318/http://grandsinosteel.com/. Archived from the original on 2021-12-05. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml;http://gxt.hebei.gov.cn/hbgyhxxht/xwzx32/tzgg83/895044/index.html. {{cite web}}: Missing or empty |title= (help)
  10. (PDF) http://www.wuan.gov.cn/wasxxgk/bmxx/zfxt/shbfj/202105/P020210525583892556371.pdf. {{cite web}}: Missing or empty |title= (help)
  11. (PDF) https://www.gov.cn/zhengce/zhengceku/2021-05/07/5605092/files/4362a77483354513be0fc81be53a4a64.pdf. {{cite web}}: Missing or empty |title= (help)