Henan Nengxin cogen new power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Henan Nengxin cogen new power station (河南能信热电公司热电联产异地升级改造工程) is a power station under construction in Henan, China. It is also known as 河南能信热电等容量替代民生热电工程.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Henan Nengxin cogen new power station Henan, China 33.8277814, 113.45226 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 33.8277814, 113.45226

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 construction coal - bituminous 350 supercritical 2025
Unit 2 construction coal - bituminous 350 supercritical 2025

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Henan Nengxin Thermal Power Co Ltd [100.0%]
Unit 2 Henan Nengxin Thermal Power Co Ltd [100.0%]

Background

The power station is related to the Henan Nengxin cogen power station. See related wiki for additional information

Upgrade and Reconstruction project

Additional supercritical power station capacity was proposed starting in 2020.[1] The new units are expected to replace the existing 2 x 210 MW units. Environmental Impact Assessment (EIA) documents noted the current units were heavily polluting and experiencing loss due to low heat demand in the area. So the expanded capacity proposed is planned for another location.[2]

According to a 2022 list of key construction projects, construction on the power plant had begun in January 2022.[3] In September 2022, a foundation laying ceremony was held. The capacity was planned to be completed and put into operation in 2025.[4][5][6]

In March 2023, it was reported that the project had secured funding for capital investment, financing and EPC (engineering, procurement, and construction).[7]

The Henan Nengxin cogen new power station was included in a list of Henan's key construction projects for 2023, noting that construction of the power project was ongoing in March 2023.[8]

In June 2023, the construction period for the plant was listed on a construction news report as 2023-2025.[9] Other reports in mid-2023 stated that concrete was poured into the foundation on 31 May 2023.[10] [11]