Henan Yongcheng power station (中煤河南永城“两个联营”暨综合能源基地项目, 中煤永城2×1000兆瓦高效超超临界机组) is an operating power station of at least 630-megawatts (MW) in Yongcheng, Shangqiu, Henan, China with multiple units, some of which are not currently operating. It is also known as 中煤商丘(永城)2x1000MW高效超超临界机组 (New Unit 1 & 2), 永煤集团裕东发电厂 (Unit 1 & 2).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Henan Yongcheng power station Yongcheng, Shangqiu, Henan, China 33.886409, 116.370975 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • New Unit 1, New Unit 2: 33.886409, 116.370975
  • Unit 1, Unit 2: 33.8865342, 116.3639922

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
New Unit 1 Construction coal: unknown[1] 1000 ultra-supercritical – – False
New Unit 2 Construction coal: unknown[1] 1000 ultra-supercritical – – False
Unit 1 Operating coal: anthracite[1] 315 subcritical yes 2005 False
Unit 2 Operating coal: anthracite[1] 315 subcritical yes 2005 False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
New Unit 1 China Coal Power Co Ltd [100%] China National Coal Group [100.0%]
New Unit 2 China Coal Power Co Ltd [100%] China National Coal Group [100.0%]
Unit 1 Shangqiu Yudong Power Generation Co Ltd [100%] Henan Province Energy Chemical Group Co Ltd [100.0%]
Unit 2 Shangqiu Yudong Power Generation Co Ltd [100%] Henan Province Energy Chemical Group Co Ltd [100.0%]

Project-level coal details

  • Coal source(s): domestic
  • Permit(s): 豫发改审批〔2022〕588号[2]

Background

Yongcheng power station is a two-unit coal-fired power plant with a total capacity of 630 MW.[3] The plant was completed in 2005, and is owned by Yongcheng Mine Group.[4][5] An additional 2,000 MW of coal capacity is under development.

New Project

A new project was listed in Yongcheng City's 14th Five-Year plan.[6][7]

The project was permitted November 3, 2022.[8] Construction reportedly began December 29, 2022.[9]

The project was so rushed that based on available information, it was hard to tell if it was being built at the same site or if the project was a relocation. There is a possibility the older 2 x 315 MW could be shut down to make room for the new one.[10]

The 2×1000MW project progressed significantly in 2024-2025, with foundation works completed in December 2024[11] and the first concrete pour for the cooling tower in February 2025[12].

Construction continued through 2025-2026, with the Unit 1 boiler water pressure test completed in June 2026[13].

Unit 2 construction progressed with the generator foundation pour in March 2025[14] and boiler steel structure erection in April 2025[15]. By 2026, Unit 2 had completed the DCS power-on[16] and boiler water pressure test[17].

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  2. ↑ https://news.bjx.com.cn/html/20221204/1273882.shtml. {{cite web}}: Missing or empty |title= (help)
  3. ↑ "裕东电厂--永城市人民政府网站". www.ycs.gov.cn. 2017-03-07.{{cite web}}: CS1 maint: url-status (link)
  4. ↑ Yongcheng Powerplant, Enipedia, accessed Sept. 2015.
  5. ↑ "河南永城电厂2号30万千瓦机组投产," Sina, Jan 5, 2005
  6. ↑ "河南永城:建设中煤永城2×1000MW高效超超临界机组工程项目," BJX, 2022-10-09
  7. ↑ "YCS," Archive, accessed October 2023
  8. ↑ "中煤永城2×1000MW高效超超临界机组工程获得核准," BJX, 2022-12-04
  9. ↑ "中煤·商丘(永城)2×1000MW高效超超临界机组工程开工," BJX, 2023-01-13
  10. ↑ See, e.g., "总投资约70亿,中煤永城2×1000MW高效超超临界机组工程项目新进展," Tou Tiao, 2022-08-07
  11. ↑ "中煤永城2×1000MW高效超超临界机组工程锅炉桩基施工顺利完成". 北极星电力网. 2024-12-06. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ "中煤永城能源公司2×1000MW超超临界机组工程1#冷却塔第7段基础首方混凝土正式开浇". 北极星电力网. 2025-03-03. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "中煤永城2×1000MW高效超超临界机组工程一号锅炉水压试验一次成功". WeChat. 2026-06-11. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "中煤永城2×1000MW超超临界机组工程#2汽轮发电机基座底板浇筑任务圆满完成". WeChat. 2025-03-27. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "中煤永城2×1000MW高效超超临界机组工程2号机组锅炉钢架第一根立柱吊装就位". WeChat. 2025-04-23. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "中煤永城2×1000兆瓦高效超超临界机组工程项目2号机组DCS受电一次成功". WeChat. 2026-05-24. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  17. ↑ "中煤永城2×1000兆瓦高效超超临界机组工程2号机组锅炉水压试验一次成功". WeChat. 2026-07-17. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.