Henan Yongcheng power station (河南永城发电厂, 中煤·河南永城“两个联营”暨综合能源基地项目) is an operating power station of at least 630-megawatts (MW) in Yongcheng, Shangqiu, Henan, China with multiple units, some of which are not currently operating. It is also known as 中煤商丘(永城)2x1000MW高效超超临界机组 (New Unit 1 & 2), 永煤集团裕东发电厂 (Unit 1 & 2).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Henan Yongcheng power station Yongcheng, Shangqiu, Henan, China 33.95412, 116.415988 (approximate)
Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
New Unit 1 Construction coal: unknown 1000 ultra-supercritical
New Unit 2 Construction coal: unknown 1000 ultra-supercritical
Unit 1 Operating coal: anthracite 315 subcritical 2005
Unit 2 Operating coal: anthracite 315 subcritical 2005

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
New Unit 1 China Coal Power Co Ltd [100%] China National Coal Group [100.0%]
New Unit 2 China Coal Power Co Ltd [100%] China National Coal Group [100.0%]
Unit 1 Shangqiu Yudong Power Generation Co Ltd [100%] Henan Province Energy Chemical Group Co Ltd [100.0%]
Unit 2 Shangqiu Yudong Power Generation Co Ltd [100%] Henan Province Energy Chemical Group Co Ltd [100.0%]

Project-level coal details

  • Permit(s): 豫发改审批〔2022〕588号[1]

Background

Yongcheng power station is a two-unit coal-fired power plant with a total capacity of 630 MW.[2] The plant was completed in 2005, and is owned by Yongcheng Mine Group.[3][4] An additional 2,000 MW of coal capacity is under development.

New Project

A new project was listed in Yongcheng City's 14th Five-Year plan.[5][6]

The project was permitted November 3, 2022.[7] Construction reportedly began December 29, 2022.[8]

The project was so rushed that based on available information, it was hard to tell if it was being built at the same site or if the project was a relocation. There is a possibility the older 2 x 315 MW could be shut down to make room for the new one.[9]

Articles and Resources

References

  1. https://news.bjx.com.cn/html/20221204/1273882.shtml. {{cite web}}: Missing or empty |title= (help)
  2. "裕东电厂--永城市人民政府网站". www.ycs.gov.cn. 2017-03-07.{{cite web}}: CS1 maint: url-status (link)
  3. Yongcheng Powerplant, Enipedia, accessed Sept. 2015.
  4. "河南永城电厂2号30万千瓦机组投产," Sina, Jan 5, 2005
  5. "河南永城:建设中煤永城2×1000MW高效超超临界机组工程项目," BJX, 2022-10-09
  6. "YCS," Archive, accessed October 2023
  7. "中煤永城2×1000MW高效超超临界机组工程获得核准," BJX, 2022-12-04
  8. "中煤·商丘(永城)2×1000MW高效超超临界机组工程开工," BJX, 2023-01-13
  9. See, e.g., "总投资约70亿,中煤永城2×1000MW高效超超临界机组工程项目新进展," Tou Tiao, 2022-08-07