Hendy wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Hendy wind farm is a wind farm under construction in Powys, Wales, United Kingdom.
Project Details
Table 1: Phase-level project details for Hendy wind farm
Status | Nameplate capacity | Type | Owner |
---|---|---|---|
Construction[1] | 14.4 MW[1] | Onshore[1] | Njord Energy[2] |
Location
Table 2: Phase-level location details for Hendy wind farm
Location | Coordinates (WGS 84) |
---|---|
Powys, Wales, Wales, United Kingdom[1] | 52.2345, -3.2741 (exact)[1] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Renewable Energy Planning Database: quarterly extract". 2024-01. Archived from the original on 2024-03-27. Retrieved 2024-02-27.
{{cite web}}
: Check date values in:|date=
(help) - ↑ "Hendy (United-Kingdom) - Wind farms - Online access - The Wind Power". www.thewindpower.net. Archived from the original on 2024-04-05. Retrieved 2024-03-18.