30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

Herrera (Grupotec) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Herrera (Grupotec) solar farm (Planta solar fotovoltaica Herrera Solar (Grupotec)) is a solar photovoltaic (PV) farm in pre-construction in Páramo de Boedo, Palencia, Castilla y León, Spain.

Project Details

Table 1: Phase-level project details for Herrera (Grupotec) solar farm

Phase name Status Nameplate capacity Technology Owner Operator
1 Pre-construction[1] 51 MWp/dc[1] PV[1] Grupotec SPV 19 SL [100%][2] Grupotec SPV 19[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Herrera (Grupotec) solar farm

Phase Name Location Coordinates (WGS 84)
1 Páramo de Boedo, Palencia, Castilla y León, Spain[2] 42.5909, -4.3471 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-10319 https://www.energiaestrategica.com/fervor-solar-en-espana-solo-los-proyectos-presentados-este-ano-duplicarian-a-toda-potencia-la-instalada/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-10319. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-10319. {{cite web}}: Missing or empty |title= (help)