Heshuyuan power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Heshuyuan power station (广东宝丽华梅县荷树园发电厂) is an operating power station of at least 1470-megawatts (MW) in Bingcun Town, Mei County, Meizhou, Guangdong, China with multiple units, some of which are not currently operating. It is also known as 梅县荷树园发电厂 (Phase IV Unit 7 & 8).
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Heshuyuan power station | Bingcun Town, Mei County, Meizhou, Guangdong, China | 24.392372, 116.260905 (exact) |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Phase IV Unit 7, Phase IV Unit 8: 24.392372, 116.260905
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: anthracite | 135 | subcritical | 2005 |
| Phase I Unit 2 | Operating | coal: anthracite | 135 | subcritical | 2005 |
| Phase II Unit 3 | Operating | coal: anthracite | 300 | subcritical | 2008 |
| Phase II Unit 4 | Operating | coal: anthracite | 300 | subcritical | 2008 |
| Phase III Unit 5 | Operating | coal: waste coal | 300 | subcritical | 2012 |
| Phase III Unit 6 | Operating | coal: waste coal | 300 | subcritical | 2012 |
| Phase IV Unit 7 | Announced[1] | coal: unknown[1] | 1000[1] | ultra-supercritical[1] | – |
| Phase IV Unit 8 | Announced[1] | coal: unknown[1] | 1000[1] | ultra-supercritical[1] | – |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | Guangdong Baolihua Electric Power Co Ltd [100%] | Guangdong Baolihua New ENERGY STOCK Co Ltd [100.0%] |
| Phase I Unit 2 | Guangdong Baolihua Electric Power Co Ltd [100%] | Guangdong Baolihua New ENERGY STOCK Co Ltd [100.0%] |
| Phase II Unit 3 | Guangdong Baolihua Electric Power Co Ltd [100%] | Guangdong Baolihua New ENERGY STOCK Co Ltd [100.0%] |
| Phase II Unit 4 | Guangdong Baolihua Electric Power Co Ltd [100%] | Guangdong Baolihua New ENERGY STOCK Co Ltd [100.0%] |
| Phase III Unit 5 | Guangdong Baolihua Electric Power Co Ltd [100%] | Guangdong Baolihua New ENERGY STOCK Co Ltd [100.0%] |
| Phase III Unit 6 | Guangdong Baolihua Electric Power Co Ltd [100%] | Guangdong Baolihua New ENERGY STOCK Co Ltd [100.0%] |
| Phase IV Unit 7 | Guangdong Baolihua Electric Power Co Ltd [100%] | Guangdong Baolihua New ENERGY STOCK Co Ltd [100.0%] |
| Phase IV Unit 8 | Guangdong Baolihua Electric Power Co Ltd [100%] | Guangdong Baolihua New ENERGY STOCK Co Ltd [100.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Guangdong East Sun Alumimumn Industrial Development is owner of the plant, which is fueled by low-quality waste coal. The first two 135MW units began operating in 2005. Two more units of 300MW each were added in 2008, [2]and again in 2012. All units use circulating fluidized bed technology.[3]
Two 1,000 MW units were proposed to be built at the same site[4][5]. The project was listed in the 2023 Guangdong key projects list[6].
The owner is currently actively responding to energy security strategic deployments from governments at all levels by undertaking application work for the Phase IV expansion project (two 1000MW resource comprehensive utilization units).[7]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://mp.weixin.qq.com/s/YUAiDwLswsZcHg-sBXQeUQ.
{{cite web}}: Missing or empty|title=(help) - ↑ "梅县荷树园电厂"Baike
- ↑ "梅县荷树园电厂添翼" 羊城晚报, 2008-06-19
- ↑ "宝新能源6×1000MW煤电机组处于前期工作阶段". 北极星电力网. 2023-02-27.
{{cite web}}: CS1 maint: url-status (link) - ↑ "县荷树园电厂四期(2×1000MW)资源综合利用发电机组工程项目建设社会稳定风险调查公示". 广东省梅州市梅县区人民政府. 2022-10-10.
{{cite web}}: CS1 maint: url-status (link) - ↑ "广东省2023年重点建设项目计划表" (PDF). 广东省发展改革委员会. 2023-03-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "【上市企业】陆丰宝丽华新能源电力有限公司诚邀您的加盟!"北极星火电招聘, 2025-09-20
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.