Heze Investment Group Juye cogen power station (菏投巨野背压机组热电联产项目) is a power station under construction in Dongguantun Town, Juye, Heze, Shandong, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Heze Investment Group Juye cogen power station Dongguantun Town, Juye, Heze, Shandong, China 35.285194, 115.957204 (approximate)
Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP
Unit 1 Construction coal: unknown 50 CFB yes
Unit 2 Construction coal: unknown 50 CFB yes

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Heze Investment Development Group Juye Cogeneration Co Ltd Heze Investment Development Group Juye Cogeneration Co Ltd
Unit 2 Heze Investment Development Group Juye Cogeneration Co Ltd Heze Investment Development Group Juye Cogeneration Co Ltd

Project-level coal details

  • Permit(s): 鲁发改项审〔2024〕297号

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The first notice of environmental impact assessment (EIA) was announced in December 2023[1] and the EIA report received approval in February 2025[2]. The project was granted permission to build in September 2024[3] and commenced construction with the pouring of the first concrete on June 27, 2025[4].

Articles and Resources

References

  1. 巨野县人民政府办公室 (2023-12-25). "菏投热电(巨野)有限公司菏投集团2×5万千瓦背压机组热电联产项目 环境影响评价公众参与第一次公示". www.juye.gov.cn. Retrieved 2025-09-18.{{cite web}}: CS1 maint: url-status (link)
  2. "菏投集团2×5万千瓦背压机组热电联产项目环评获批". 北极星火力发电网. 2025-02-25. Retrieved 2025-09-18.{{cite web}}: CS1 maint: url-status (link)
  3. "菏投集团2×50MW热电联产项目核准批复". 电力项目圈. 2024-9-9. Retrieved 2025-09-18. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  4. "菏投2×5万千瓦背压机组热电联产项目主厂房第一方混凝土顺利浇筑". 火电之声. 2025-7-7. Retrieved 2025-09-18. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)