Hezhou power station (华润电力贺州发电厂) is an operating power station of at least 2090-megawatts (MW) in Lianshan Town, Fuchuan, Hezhou, Guangxi, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Hezhou power station | Lianshan Town, Fuchuan, Hezhou, Guangxi, China | 24.73609, 111.34667 (exact) |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 24.73609, 111.34667
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: bituminous[1] | 1045 | ultra-supercritical | 2012 | False |
| Phase I Unit 2 | Operating | coal: bituminous[1] | 1045 | ultra-supercritical | 2012 | False |
| Phase II Unit 3 | Cancelled | coal: bituminous[1] | 1000 | ultra-supercritical | – | False |
| Phase II Unit 4 | Cancelled | coal: bituminous[1] | 1000 | ultra-supercritical | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | China Resources Electric Power (Hezhou) Co Ltd [100%] | China Resources Power (East) [100.0%] |
| Phase I Unit 2 | China Resources Electric Power (Hezhou) Co Ltd [100%] | China Resources Power (East) [100.0%] |
| Phase II Unit 3 | China Resources Electric Power (Hezhou) Co Ltd [100%] | China Resources Power (East) [100.0%] |
| Phase II Unit 4 | China Resources Electric Power (Hezhou) Co Ltd [100%] | China Resources Power (East) [100.0%] |
Project-level coal details
- Coal source(s): domestic/imported
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Hezhou power station is a two-unit coal-fired power plant with a total capacity of 2,090 MW in Guangxi Province. The plant was permitted in 2010 and completed in 2012.[2][3]
J-Power, Mitsui & Co and the Development Bank of Japan jointly invested in a special-purpose investment company called JM Energy to be a 50:50 partner with China Resources Power for the project.[4][5]
Expansion
In March 2020, a 2 x 1,000MW coal-fired expansion at the power station was listed as a preliminary project in the Guangxi "Energy Network Infrastructure Plan 2020-2022" (《广西“能源网”基础设施建设大会战实施方案(2020-2022年)》).[6]
With no known updates in at least two years, the project was presumed to be shelved in 2022.
No news for more than three years. The project was shelved in July 2023 and cancelled in April 2026.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ "广西最大火力发电机组正式“服役”广西新闻网-广西日报, 2012-08-20
- ↑ "Overview of the Hezhou Power Plant Project," Mitsui, accessed November 2014
- ↑ "Coal-Fired Plants in China - Guangxi," Power plants around the world, accessed November 2014.
- ↑ "中国贺州火电厂2号机组投产运行"Mitsui & Co, Nov. 28, 2012
- ↑ "总投资445.6亿元!广西2020-2022年将推进7个煤电项目," Sohu, 2020-03-04