Hohhot Jinshan cogen power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Hohhot Jinshan cogen power station (蒙能呼和浩特金山热电厂) is an operating power station of at least 1920-megawatts (MW) in Taigemu Town Dagaoyang Villege, Tumed Left (Tumote Zuo), Hohhot, Inner Mongolia, China with multiple units, some of which are not currently operating. It is also known as 内蒙古能源集团金山热电厂2×100万千瓦煤电联营扩建项目 (Phase III Unit 5&6), 内蒙古能源集团金山发电厂2×66万千瓦煤电扩建项目 (Unit 7&8).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Hohhot Jinshan cogen power station Taigemu Town Dagaoyang Villege, Tumed Left (Tumote Zuo), Hohhot, Inner Mongolia, China 40.701963, 111.449515 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Phase III Unit 5: 40.701963, 111.449515
  • Phase III Unit 6, Unit 1, Unit 2: 40.7075793, 111.4573306
  • Phase IV Unit 7, Phase IV Unit 8, Phase V Unit 9: 40.703753, 111.450427
  • Unit 3, Unit 4: 40.7072133, 111.4600879

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
Phase III Unit 5 Construction coal: unknown 1000 ultra-supercritical yes 2025 (planned)
Phase III Unit 6 Construction coal: unknown 1000 ultra-supercritical yes 2025 (planned)
Phase IV Unit 7 Construction coal: unknown 660 ultra-supercritical yes 2027 (planned)
Phase IV Unit 8 Construction coal: unknown 660 ultra-supercritical yes 2027 (planned)
Phase V Unit 9 Announced coal: unknown 600 ultra-supercritical yes
Unit 1 Operating coal: unknown 300 subcritical yes 2010
Unit 2 Operating coal: unknown 300 subcritical yes 2010
Unit 3 Operating coal: unknown 660 ultra-supercritical yes 2022
Unit 4 Operating coal: unknown 660 ultra-supercritical yes 2023

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase III Unit 5 Inner Mongolia Energy Power Generation Investment Group Co Ltd Jinshan Thermal Power Plant [100%] Inner Mongolia Energy Power Generation Investment Group Co Ltd [90.0%]; Inner Mongolia State Owned Capital Operation Co Ltd [10.0%]
Phase III Unit 6 Inner Mongolia Energy Power Generation Investment Group Co Ltd Jinshan Thermal Power Plant [100%] Inner Mongolia Energy Power Generation Investment Group Co Ltd [90.0%]; Inner Mongolia State Owned Capital Operation Co Ltd [10.0%]
Phase IV Unit 7 Inner Mongolia Energy Power Generation Investment Group Co Ltd Jinshan Thermal Power Plant [100%] Inner Mongolia Energy Power Generation Investment Group Co Ltd [90.0%]; Inner Mongolia State Owned Capital Operation Co Ltd [10.0%]
Phase IV Unit 8 Inner Mongolia Energy Power Generation Investment Group Co Ltd Jinshan Thermal Power Plant [100%] Inner Mongolia Energy Power Generation Investment Group Co Ltd [90.0%]; Inner Mongolia State Owned Capital Operation Co Ltd [10.0%]
Phase V Unit 9 Inner Mongolia Energy Power Generation Investment Group Co Ltd Jinshan Thermal Power Plant [100%] Inner Mongolia Energy Power Generation Investment Group Co Ltd [90.0%]; Inner Mongolia State Owned Capital Operation Co Ltd [10.0%]
Unit 1 Inner Mongolia Energy Power Generation Investment Group Co Ltd Jinshan Thermal Power Plant [100%] Inner Mongolia Energy Power Generation Investment Group Co Ltd [90.0%]; Inner Mongolia State Owned Capital Operation Co Ltd [10.0%]
Unit 2 Inner Mongolia Energy Power Generation Investment Group Co Ltd Jinshan Thermal Power Plant [100%] Inner Mongolia Energy Power Generation Investment Group Co Ltd [90.0%]; Inner Mongolia State Owned Capital Operation Co Ltd [10.0%]
Unit 3 Inner Mongolia Energy Power Generation Investment Group Co Ltd Jinshan Thermal Power Plant [100%] Inner Mongolia Energy Power Generation Investment Group Co Ltd [90.0%]; Inner Mongolia State Owned Capital Operation Co Ltd [10.0%]
Unit 4 Inner Mongolia Energy Power Generation Investment Group Co Ltd Jinshan Thermal Power Plant [100%] Inner Mongolia Energy Power Generation Investment Group Co Ltd [90.0%]; Inner Mongolia State Owned Capital Operation Co Ltd [10.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

Phase III Units 5 and 6 of Hohhot Jinshan cogen power station were permited to build in January 2023[1]. It was reported that the environmental assessment was approved in July 2023[2], and construction started in March 2023[3]. The project was slated for operation in 2025[3].

The further expansion project of Phase IV Units 7 and 8 was first announced on the Tumed Left Banner government’s official website in March 2024[4]. On 30 June 2024, the Inner Mongolia Autonomous Region Energy Bureau granted the project permission to build[5]. The units were reported under construction from March 2024[6][7].

Bidding calls for Phase V Unit 9 site selection[8], cultural relics exploration consulting[9], and social stability risk assessment[10] studies appeared from March 2025.

Articles and Resources

References

  1. "内蒙古能源集团金山热电厂2×100万千瓦煤电联营扩建项目集控楼装修工程招标公告". 内蒙古公共资源交易中心网站. 2024-10-17. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. "金山热电厂2×100万千瓦煤电联营扩建项目环境影响报告书批复". 北极星火力发电网. 2023-07-06. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  3. 3.0 3.1 融媒土左 (2024-07-18). "关键节点!金山热电厂2×100万千瓦煤电联营扩建项目6号机组锅炉大板梁完成吊装". 土默特左旗人民政府网站. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  4. "金山热电厂2×66千万扩建工程项目公示". 土默特左旗人民政府网站. 2024-03-27. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  5. "内蒙古能源集团金山发电厂2×66万千瓦煤电扩建项目获核准批复". 北极星火力发电网. 2024-07-05. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  6. "总投资67亿元,内蒙古能源集团金山发电厂2x66万千瓦煤电扩建项目开工建设". 呼和浩特市统计局网站. 2025-03-18. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  7. "蒙能4×100万千瓦+4×66万千瓦煤电项目:"项"上发力 "火"热建设". 火电之声 WeChat Official Accounts Platform. 2025-7-4. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  8. "内蒙古能源集团金山第四发电有限公司金山五期1×60万千瓦煤电扩建项目土地预审与选址规划咨询服务询价采购结果公告". 寻标宝. 2025-03-20. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  9. "内蒙古能源集团金山第四发电有限公司内蒙古能源集团金山五期1×60万千瓦煤电扩建项目文物勘探咨询服务项目询价采购". 寻标宝. 2025-05-23. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  10. "内蒙古能源集团金山五期1×60万千瓦煤电扩建项目社会稳定风险评估咨询服务信息公示". 呼和浩特市赛罕区人民政府网站. 2025-5-26. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)