Hongmei LNG Terminal
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Hongmei LNG Terminal, also known as 东莞九丰LNG接收站 and 洪梅LNG接收站, is an operating LNG import terminal in China.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Hongmei LNG Terminal | Hongmei Town, Dongguan, Guangdong, China[1] | 22.953596, 113.556552 (exact) |
The map below shows the exact location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Hongmei LNG Terminal | import[1] | operating[2] | 1.5 mtpa[1] | 1.5 mtpa | False | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Hongmei LNG Terminal | import[1] | – | – |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Hongmei LNG Terminal | import[1] | operating[2] | – | – | 2008[3] | 2012[2] | – |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Hongmei LNG Terminal | import[1] | operating[2] | JOVO LNG Storage and Transportation Co.,ltd.dongguan [100%][4] | Guangdong Jovo Energy Group Co Ltd [80.0%]; Dongguan Jiufeng Energy Co Ltd [20.0%] | – |
Background
Hongmei LNG Terminal is a 1 million tonnes per year import LNG terminal in Dongguan, Guangdong. It began construction in 2008 and was commissioned in 2012. It's the first private owned LNG terminal in China by Jovo Group.[5][6]
The Terminal contains two 80,000-cubic-meter-storage tanks. The designed receiving capacity is 1.5 mtpa. [7] However, in a Revision of Gas Special Planning in Changping Town, Dongguan (2019-2035), the capacity of Hongmei LNG terminal is 1 mtpa, and the actual receiving capacity is 0.7 mtpa.[8]
九丰 LNG 接收站于 2012 年 6 月开车运行,设计年周转能力 100 万吨(折合气态天然气约 14 亿立方米),目前年周转能力为 70 万吨左右。东莞九丰 LNG 项目项目年销售量为 70×104 吨/年,目前采用汽车槽车运至珠三角及周边的 LNG 卫星站。[8]
In 2025, Hongmei LNG Terminal has officially opened up its full range of services to the public.[9]
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://www.jovo.com.cn/m/News/NewsDetail?nodecode=600400100&id=100000088293674.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 (PDF) https://pdf.dfcfw.com/pdf/H3_AP202108111509373688_1.pdf?1628679060000.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.shangyexinzhi.com/article/1922438.html.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.qcc.com/firm/e1542d67ecd7780d47748118a3c5fec3.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 东莞九丰LNG接收站——LNG接收站介绍 Source: LNG接收站建设与运营先锋号, 05/09/2020
- ↑ "民营上市公司布局好LNG接收站,将投20多亿建造高端LNG运输船2艘". www.sohu.com. 2021-01-03. Retrieved 2021-04-19.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中国石油与九丰集团东莞LNG接收站转运合作,实现多个首次突破--集团动态--九丰集团官网". www.jovo.com.cn. 2019-12-23.
{{cite web}}: CS1 maint: url-status (link) - ↑ 8.0 8.1 "东莞市常平镇燃气专项规划修编(2019-2035 年)" (PDF). www.dg.gov.cn. 2021-12.
{{cite web}}: Check date values in:|date=(help)CS1 maint: url-status (link) - ↑ "China's Jovo in Dongguan LNG move". 2025-02-13. Retrieved 2026-04-09.
{{cite web}}: CS1 maint: url-status (link)
