Hongqingliang mine

From Global Energy Monitor

Hongqingliang mine (杭锦旗西部能源开发有限公司红庆梁煤矿) is an operating mine located within the Taran Gaole Mining Area of Inner Mongolia, China. Its annual production capacity is designed to be 6 million tonnes(Mt) a year.

Location

The undated satellite photo below shows the coal mine located in Zhaojun Town, Dalad, Ordos, Inner Mongolia

Loading map...

Coal Mine Background

In July 2015, the National Development and Reform Commission (NDRC) has ratified the construction of Hongqingliang mine located in Taran Gaole Mining Area, with a total production capacity of 6Mt/year.[1]

The construction of the principal part of the project started in May 2012 and was completed in June 2018. [2] In the same year, the Hongqinghe mine entered into the phase of experimental operation.[3] It was put into operation in June 2018. [4]


Project Details

  • Sponsor: Hangjinqi West Energy Development Co.
  • Parent Company: Shanxi Zhongbo Real Estate Development Co (40%), Beijing Energy Group(37.38%),Shougang Group(1.12%),China Coal (1.12%), others(20.38%)
  • Location: Zhaojun Town, Dalad, Ordos, Inner Mongolia
  • GPS Coordinates: 39.875788,109.367767
  • Status: Operating
  • Production Capacity: 6 Mt/year
  • Total Resources: 1312.55Mt[5]
  • Minable Reserves: 810.28Mt
  • Coal Type: Bituminous
  • Mine Size: 48.58k㎡
  • Mine Type: Underground
  • Start Year: 2018
  • Source of Financing:


Articles and resources

References

  1. "内蒙古塔然高勒矿区红庆梁煤矿项目通过核准"发改委, 2015/07/07
  2. "内蒙古塔然高勒矿区红庆梁矿井及选煤厂项目水土保持设施验收"北京昊华能源股份有限公司 , 2018/08/28
  3. [http://vip.stock.finance.sina.com.cn/corp/view/vCB_AllBulletinDetail.php?stockid=601101&id=4335152"昊华能源关于红庆梁矿井及选煤厂建设项目进行联合试运转的公告, 2018/04/26
  4. "昊华能源:红庆梁矿转固投产,内蒙产能加速释放"北京昊华能源股份有限公司 , 2018/12/10
  5. "内蒙古塔然高勒矿区红庆梁矿井及选煤厂项目水土保持设施验收"北京昊华能源股份有限公司 , 2018/08/28

Related SourceWatch articles