Hotan power station (新疆和田热电联产项目) is an operating power station of at least 700-megawatts (MW) in Kunlun Lake Community, Gujiang Bage Town, Hotan, Xinjiang, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Hotan power station Kunlun Lake Community, Gujiang Bage Town, Hotan, Xinjiang, China 37.2661537, 79.9923769 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 37.2661537, 79.9923769

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Unit 1 Operating[1] coal: unknown[2] 350 unknown yes 2024 False
Unit 2 Operating coal: unknown[2] 350 unknown yes 2025 False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Xinjiang Energy (Group) Hetian Energy Co Ltd [100%] Xinjiang Energy (Group) Co Ltd [100.0%]
Unit 2 Xinjiang Energy (Group) Hetian Energy Co Ltd [100%] Xinjiang Energy (Group) Co Ltd [100.0%]

Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on Project

Hotan power station is a proposed 2 x 350 MW coal-fired power station in Gujiang Bage Town. It was listed as one of the "Key Projects" for Xinjiang in 2021.[3]

The project was approved in June 2021, and construction began in November 2021.[4]

The project progressed through 2024 with the Unit 1 boiler water pressure test in April[5] and grid connection in September 2024[6]. Unit 1 successfully completed the 168-hour trial run in October 2024[7].

Unit 2 construction progressed, and the unit was expected to be commissioned by late 2024 or early 2025[8].

Articles and Resources

References

  1. ↑ "和田2×35万千瓦热电联产项目1号机组正式投产-北极星火力发电网". news.bjx.com.cn. 2024-10-31. Archived from the original on 2025-06-30. Retrieved 2024-11-01.
  2. ↑ 2.0 2.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  3. ↑ "2021年新疆自治区重点项目清单发布:涉及多个电力项目," 北极星电力网新闻中心, 2021/3/24
  4. ↑ "新疆能源集团和田2x35万千瓦热电联产项目开工," XJHT, 2021-11-29
  5. ↑ "新疆和田2×350MW热电联产项目1号锅炉水压试验一次成功". WeChat. 2024-04-05. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  6. ↑ "和田能源2×35万千瓦热电联产项目1号机组首次并网一次成功". 北极星电力网. 2024-09-25. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  7. ↑ "和田2×35万千瓦热电联产项目1号机组168小时满负荷试运行圆满成功". WeChat. 2024-10-28. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  8. ↑ "和田新疆能源2×35万千瓦热电联产项目1号机组并网发电,预计2号机组将于2024年11月底前建成投产". 新疆维吾尔自治区发展和改革委员会. 2024-10-24. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)