Lu'an power station (六安发电厂) is an operating power station of at least 1320-megawatts (MW) in Chengnan Town Pangang Villege, Yu'an, Lu'an, Anhui, China with multiple units, some of which are not currently operating. It is also known as 中煤六安发电厂 (Phase III Unit 5 & 6), 华电国际安徽六安电厂 (Phase I Unit 1 & 2, Phase II Unit 3 & 4).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Lu'an power station Chengnan Town Pangang Villege, Yu'an, Lu'an, Anhui, China 31.656523, 116.491363 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 31.656523, 116.491363

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 retired coal - bituminous 135 subcritical 2006 2017
Phase I Unit 2 retired coal - bituminous 135 subcritical 2006 2017
Phase II Unit 3 operating coal - bituminous 660 ultra-supercritical 2014
Phase II Unit 4 operating coal - bituminous 660 ultra-supercritical 2014
Phase III Unit 5 permitted coal - bituminous 660[1] ultra-supercritical
Phase III Unit 6 permitted coal - bituminous 660 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 Anhui Huadian Lu'an Power Generation Co Ltd [100.0%]
Phase I Unit 2 Anhui Huadian Lu'an Power Generation Co Ltd [100.0%]
Phase II Unit 3 Anhui Huadian Lu'an Power Generation Co Ltd [100.0%]
Phase II Unit 4 Anhui Huadian Lu'an Power Generation Co Ltd [100.0%]
Phase III Unit 5 China Coal Xinji Lu'an Energy Co Ltd [100.0%]
Phase III Unit 6 China Coal Xinji Lu'an Energy Co Ltd [100.0%]

Project-level coal details

  • Permit(s): February 23, 2023, July 21, 2009, December 25, 2013

Background

Huadian Lu'an power station is owned by China Huadian. The first two coal-fired units, totaling 270 MW, were brought online in 2006,[2] and were retired in 2017.[3]

An additional two coal-fired units, units 3-4 totaling 1,320 MW, were planned. Unit 3 received a permit from China's NDRC in July 2009. Four years later, in December 2013, unit 4 received an NDRC permit. The two units were both brought online in 2014.[4][5][6][7][8]

As of 2017, Huadian Lu'an power station is planning to convert units 3 and 4 to CHP power units, to supply heating to the city of Liu'an, particularly the Yu'an Economic Development Zone.[3]

Description of Expansion

China Huadian was planning to build two more units, units 5-6 with a total capacity of 2,000 MW. The new units were scheduled to be completed in 2020. A feasibility study for the project was approved in March 2014.[9]

The proposed units were listed in the 2017 Anhui Province Power Development 13th 5-Year Plan as a back-up project.[10]

As of December 2019, there had been no progress on units 5-6, so they appeared to be shelved or abandoned.

However, in December 13, 2022, the project was up for short public review[11] and permit was granted on 23 February 2023.[12]

Articles and Resources

References

  1. https://web.archive.org/web/20240206235828/https://news.bjx.com.cn/html/20221214/1276439.shtml. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. Huadian Lu'an Powerplant, Enipedia, accessed 2014-11.
  3. 3.0 3.1 "六安公司签订六安市热网项目合作开发框架协议"华电六安公司, 2017/5/3
  4. "安徽华电六安发电有限公司简介"裕安区政府网站, 2015-10-30.
  5. "华电六安公司#3机组顺利通过168小时试运行,", CFB技术网, 2014-05-23.
  6. "华电六安电厂二期工程投产 有效缓解电力供需矛盾,", 凤凰网, 2014-08-02.
  7. "华电集团六安发电公司4号机获得国家能源局“路条”," State Electronic Welding Information Network, 2012-07-12.
  8. 600MW-power unit to be built at Huadian Lu’an Power Plant, Anhui News, 2009-09-01.
  9. "华电六安电厂三期2×1000MW机组扩建工程初步可行性研究报告顺利,", 中国火力发电网, 2014-03-10.
  10. "安徽省电力发展“十三五”规划"安徽省能源局, 2017-5
  11. 2*660MW!中煤六安电厂三期项目核准前公示, BJX, 2022-12-14
  12. "项目代码 2211-340000-04-01-307073". 安徽省投资项目在线审批监管平台. 2023-2-23. Retrieved 2023-8-15. {{cite web}}: Check date values in: |access-date= and |date= (help); horizontal tab character in |title= at position 5 (help)CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.