Huadian Qingdao Gas Thermal power station
| Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
| Related categories: |
Huadian Qingdao Gas Thermal power station (华电青岛燃机热电厂, 华电青岛天然气热电联产工程) is an operating power station of at least 1010-megawatts (MW) in Shibei District, Qingdao, Shandong, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Huadian Qingdao Gas Thermal power station | Shibei District, Qingdao, Shandong, China | 36.112336, 120.331687 (exact)[1] |
Unit-level coordinates (WGS 84):
- 1, 2: 36.112336, 120.331687
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Equipment | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| 1 | Operating[2][3] | fossil gas: LNG[4][5] | 505[2] | combined cycle[6] | yes[6] | 2023[3] | Dongfang Electric Corporation: M701F[6] | no |
| 2 | Operating[2] | fossil gas: LNG[4] | 505[2] | combined cycle[6] | yes[6] | 2024[2] | Dongfang Electric Corporation: M701F[6] | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 1 | Huadian Qingdao Power Generation Co Ltd [100%][6][1] | Huadian Power International Co Ltd [55.0%]; Qingdao Guoxin Development (Group) Co Ltd [45.0%] |
| 2 | Huadian Qingdao Power Generation Co Ltd [100%][6][1] | Huadian Power International Co Ltd [55.0%]; Qingdao Guoxin Development (Group) Co Ltd [45.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Huadian Qingdao Gas Thermal power station (华电青岛燃机热电厂) received approval on December 22, 2016, [7]and officially commenced construction in April 2022. In November 2023, Unit 1 completed debugging and began operations, with the entire project scheduled to be completed and put into operation by the end of 2023. The main construction of Unit 2 has been completed, and it is expected to start operation in April 2024.[8]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 "华电青岛天然气热电联产工程:天然气调压站、档案综合楼、调压站电子设备间-变更20240430". 2024-05-20. Archived from the original on 2024-05-24.
- ↑ 2.0 2.1 2.2 2.3 2.4 http://nyj.shandong.gov.cn/art/2024/7/16/art_59976_10305014.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 "青岛向新求变,向绿笃行_青岛新闻_青岛大众网". qingdao.dzwww.com. 2023-12-15. Archived from the original on 2026-04-24. Retrieved 2024-12-09.
- ↑ 4.0 4.1 https://web.archive.org/web/20220708191614/https://www.sohu.com/a/451992145_743972. Archived from the original on 2022-07-08.
{{cite web}}: Missing or empty|title=(help) - ↑ http://paper.people.com.cn/zgnyb/html/2017-01/02/content_1740700.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 https://web.archive.org/web/20210604212504/https://news.bjx.com.cn/html/20180702/909568.shtml. Archived from the original on 2021-06-04.
{{cite web}}: Missing or empty|title=(help) - ↑ "华电青岛公司9F级热电联产项目获批". 2017-01-02. Retrieved 2023-11-16.
{{cite web}}: CS1 maint: url-status (link) - ↑ "强信心·稳经济·促发展 | 华电青岛天然气热电联产工程年底投产发电". 2023-11-13. Retrieved 2023-11-16.
{{cite web}}: CS1 maint: url-status (link)