Huadian Qingdao Gas Thermal power station (华电青岛燃机热电厂, 华电青岛天然气热电联产工程) is an operating power station of at least 1010-megawatts (MW) in Shibei District, Qingdao, Shandong, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huadian Qingdao Gas Thermal power station Shibei District, Qingdao, Shandong, China 36.112336, 120.331687 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1, 2: 36.112336, 120.331687

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1 Operating[2][3] fossil gas: LNG[4][5] 505[2] combined cycle[6] yes[6] 2023[3]
2 Operating[2] fossil gas: LNG[4] 505[2] combined cycle[6] yes[6] 2024[2]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 Huadian Qingdao Power Generation Co Ltd [100%][6][1] Huadian Power International Co Ltd [55.0%]; Qingdao Guoxin Development (Group) Co Ltd [45.0%]
2 Huadian Qingdao Power Generation Co Ltd [100%][6][1] Huadian Power International Co Ltd [55.0%]; Qingdao Guoxin Development (Group) Co Ltd [45.0%]

Background

Huadian Qingdao Gas Thermal power station (华电青岛燃机热电厂) received approval on December 22, 2016, [7]and officially commenced construction in April 2022. In November 2023, Unit 1 completed debugging and began operations, with the entire project scheduled to be completed and put into operation by the end of 2023. The main construction of Unit 2 has been completed, and it is expected to start operation in April 2024.[8]

Articles and Resources

References

  1. 1.0 1.1 1.2 "华电青岛天然气热电联产工程:天然气调压站、档案综合楼、调压站电子设备间-变更20240430". 2024-05-20. Archived from the original on 2024-05-24.
  2. 2.0 2.1 2.2 2.3 2.4 http://nyj.shandong.gov.cn/art/2024/7/16/art_59976_10305014.html. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://qingdao.dzwww.com/qingdaonews/202312/t20231215_13334683.htm. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20220708191614/https://www.sohu.com/a/451992145_743972. Archived from the original on 2022-07-08. {{cite web}}: Missing or empty |title= (help)
  5. http://paper.people.com.cn/zgnyb/html/2017-01/02/content_1740700.htm. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 https://web.archive.org/web/20210604212504/https://news.bjx.com.cn/html/20180702/909568.shtml. Archived from the original on 2021-06-04. {{cite web}}: Missing or empty |title= (help)
  7. "华电青岛公司9F级热电联产项目获批". 2017-01-02. Retrieved 2023-11-16.{{cite web}}: CS1 maint: url-status (link)
  8. "强信心·稳经济·促发展 | 华电青岛天然气热电联产工程年底投产发电". 2023-11-13. Retrieved 2023-11-16.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.