Huadian Tengger power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Huadian Tengger power station (内蒙古华电腾格里煤电厂) is a power station under construction in Alxa Left Banner, Alxa, Inner Mongolia, China. It is also known as 内蒙古华电腾格里外送基地项目.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Huadian Tengger power station | Alxa Left Banner, Alxa, Inner Mongolia, China | 40.642098, 106.265457 (approximate)[1] |
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Construction[2][1] | coal: unknown[1] | 1000[1] | ultra-supercritical[3] | 2025 (planned)[3] | False |
| Unit 2 | Construction[2][1] | coal: unknown[1] | 1000[1] | ultra-supercritical[3] | 2026 (planned)[3] | False |
| Unit 3 | Construction[2][1] | coal: unknown[1] | 1000[1] | ultra-supercritical[3] | 2026 (planned)[3] | False |
| Unit 4 | Construction[2][1] | coal: unknown[1] | 1000[1] | ultra-supercritical[3] | 2026 (planned)[3] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Huadian (Inner Mongolia) New Energy Co Ltd [100%][1] | China Huadian Corp Ltd [52.4%]; Huadian Power International Co Ltd [31.0%]; unknown [16.6%] |
| Unit 2 | Huadian (Inner Mongolia) New Energy Co Ltd [100%][1] | China Huadian Corp Ltd [52.4%]; Huadian Power International Co Ltd [31.0%]; unknown [16.6%] |
| Unit 3 | Huadian (Inner Mongolia) New Energy Co Ltd [100%][1] | China Huadian Corp Ltd [52.4%]; Huadian Power International Co Ltd [31.0%]; unknown [16.6%] |
| Unit 4 | Huadian (Inner Mongolia) New Energy Co Ltd [100%][1] | China Huadian Corp Ltd [52.4%]; Huadian Power International Co Ltd [31.0%]; unknown [16.6%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Huadian Tengger 4×1000MW coal power project will be used as a peak-shaving power supply for the Tengger Desert Clean Energy Base to support its electricity exports.[4]
The feasibility study was passed in March 2023.[5] Boiler, steam turbine, and generator procurement bidding was called in May 2023.[6]
In July 2023, Harbin Electric Machinery Co., Ltd. won a bid for plant's turbine generators and ancillary equipment.[7]
In 2023, major equipment orders were placed. In 2024, preliminary design review was tendered.
In 2025, the project received approval in February. Major equipment procurement and construction bidding progressed. In September 2025, major equipment and construction contracts were awarded. In October 2025, the EIA was approved. In November 2025, land use was approved. Unit 1 concrete was poured in December 2025[8].
In 2026, equipment procurement and construction progressed. Unit 1 boiler steel erection began in May 2026[9]. Unit 2 boiler steel erection began in June 2026[10].
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 https://news.bjx.com.cn/html/20250217/1427397.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 https://news.bjx.com.cn/html/20251218/1475425.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 https://news.bjx.com.cn/html/20230711/1318699.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "内蒙古4×100万千瓦火力发电项目签约". 北极星电力网. 2023-02-07.
{{cite web}}: CS1 maint: url-status (link) - ↑ 阿拉善左旗发展和改革委员会 (2023-03-21). "华电腾格里4×1000MW煤电项目初可研评审". 北极星火力发电网.
{{cite web}}: CS1 maint: url-status (link) - ↑ "内蒙古华电腾格里4×1000MW超超临界燃煤机组工程锅炉、汽轮机发电机采购招标". 北极星电力网. 2023-05-16.
{{cite web}}: CS1 maint: url-status (link) - ↑ 4台1000兆瓦 ! 哈电电机中标内蒙古华电腾格里汽轮发电机, BJX, 2023-07-11
- ↑ "内蒙古华电腾格里4×100万千瓦煤电项目浇筑第一方混凝土,正式开工". 微信公众平台. 2025-12-17. Retrieved 2025-12-18.
{{cite web}}: CS1 maint: url-status (link) - ↑ "内蒙古华电腾格里4×100万千瓦煤电项目#1锅炉钢架吊装正式启动". 微信公众平台. 2026-05-25. Retrieved 2026-06-08.
{{cite web}}: CS1 maint: url-status (link) - ↑ "内蒙古华电腾格里4×100万千瓦煤电项目#2机组锅炉钢架首根立柱顺利完成吊装". 微信公众平台. 2026-06-16. Retrieved 2026-07-02.
{{cite web}}: CS1 maint: url-status (link)