Huadian Urumqi power station (华电新疆乌鲁木齐热电) is an operating power station of at least 660-megawatts (MW) in Badaowan, Shuimogou, Ürümqi, Xinjiang, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huadian Urumqi power station Badaowan, Shuimogou, Ürümqi, Xinjiang, China 43.901111, 87.6975 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 43.901111, 87.6975

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
Unit 1 Operating coal: unknown 330 subcritical yes 2009
Unit 2 Operating coal: unknown 330 subcritical yes 2009

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Urumqi Thermal Power Plant, Huadian Xinjiang Power Generation Co Ltd [100%] China Huadian Corp Ltd [100.0%]
Unit 2 Urumqi Thermal Power Plant, Huadian Xinjiang Power Generation Co Ltd [100%] China Huadian Corp Ltd [100.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The Huadian Urumqi power plant was commissioned in 2009 and connected to the grid on November 3, 2009.[1] It has 660 MW and is located in Shuimogou, China.[2]

The thermal power plant was a key development project of the China's "Eleventh Five-Year" power development plan.[3] With a total investment of approximately 5.55 billion RMB from Huadian, the plant will provide heating to an area 3 million square meters.[4]

In 2017, the Huadian Urumqi Thermal Power Plant completed a new emissions-control project and reportedly reduced 90% of its pollutant emissions.[5]

Articles and Resources

References

  1. "华电新疆乌鲁木齐热电厂一号发电机组一次并网成功-新闻-能源资讯-中国能源网". www.china5e.com. November 10, 2011. Retrieved 2021-06-08.{{cite web}}: CS1 maint: url-status (link)
  2. http://www.xjhd.com.cn/news/gaikuang_zhuangji.asp
  3. "华电新疆发电有限公司乌鲁木齐热电厂2乘33万千瓦热电联产工程进展迅速-华电新疆发电有限公司乌鲁木齐热电厂2乘33万千瓦热电联产工程进展迅速-国际电力网". Power. September 8, 2008. Retrieved 2021-06-08.{{cite web}}: CS1 maint: url-status (link)
  4. "华电集团加快对疆投资步履-国务院国有资产监督管理委员会". SASAC (in 中文(中国大陆)). June 9, 2010. Retrieved 2021-06-08.{{cite web}}: CS1 maint: url-status (link)
  5. "华电乌鲁木齐热电厂完成"超净排放"改造". Sina News. October 24, 2017. Retrieved 2021-06-08.{{cite web}}: CS1 maint: url-status (link)