Huadian Xiheishan power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Huadian Xiheishan power station (华电新疆西黑山发电厂) is an operating power station of at least 1320-megawatts (MW) in Xiheishan Industrial Park, Qitai, Changji, Xinjiang, China. It is also known as 华电新疆西黑山(英格玛)电厂, 新疆华电昌吉英格玛煤电一体化坑口电厂.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Huadian Xiheishan power station | Xiheishan Industrial Park, Qitai, Changji, Xinjiang, China | 44.555, 90.236 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 44.555, 90.236
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | Operating[1] | coal: bituminous | 660 | ultra-supercritical | 2024 |
Unit 2 | Operating[2] | coal: bituminous | 660 | ultra-supercritical | 2024 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Xinjiang Huadian Xiheishan Power Generation Co Ltd [100%] | An Hui Wenergy Co Ltd [70.0%]; China Huadian Corp Ltd [30.0%] |
Unit 2 | Xinjiang Huadian Xiheishan Power Generation Co Ltd [100%] | An Hui Wenergy Co Ltd [70.0%]; China Huadian Corp Ltd [30.0%] |
Project-level captive use details
- Captive industry use (heat or power): power
- Captive industry: Coal Mining & Coal Products
Background on Project
In 2014, China Huadian was planning to build a two-unit coal-fired power plant with a total planned capacity of 1,320 MW in Xinjiang Uyghur Autonomous Region.[3]
The plant was permitted for construction in May 2015.[4]
As of January 2019, construction had not advanced beyond land clearing. Plans for the plant appeared to be shelved or deferred, perhaps to comply with central government restrictions (more below).
Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity
In 2016 China's National Energy Administration issued "scale control" (coal-fired capacity limits) on particular "sending out" locations that feed ultra-high voltage (UHV) long-distance power lines, including Inner Mongolia (Xilingong), Inner Mongolia (Ordos), Shaanxi, Ningxia, Shanxi, and Xinjiang.[5]
The affected area included this power station. As of January 2022, with no progress on the project since at least 2017, it was presumed shelved or cancelled.
For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.
Project revived
In September 2022, it became apparent that the project was underway, with Energy China Northwest Power Construction winning a related bid.[6]
In November 2022, construction reportedly started on the power station.[7]
Articles and Resources
References
- ↑ https://news.bjx.com.cn/html/20241118/1411204.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://news.bjx.com.cn/html/20241231/1420306.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 西黑山公司新建项目获得国家能源局路条, 华电新疆发电有限公司, 2014-8-28
- ↑ 东“疆电外送”配套7个电源项目已全部完成主厂房第一方混凝土浇筑, Xinjiang Technical Park, June 28, 2015
- ↑ 能源局下发13省市新建火电机组停建清单(附文件), Polaris, Jan 16, 2017
- ↑ 中国能建西北电建中标新疆华电昌吉英格玛煤电一体化坑口电厂一期工程Ⅱ标段, power.in-en, 2022-09-30
- ↑ 新疆昌吉英格玛2×660兆瓦煤电项目开工, BJX News, 2022-11-29