Xiheishan power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Xiheishan power station (华电新疆西黑山发电厂, 新疆皖能英格玛电厂二期扩建2×66万千瓦新型煤电机组项目) is an operating power station of at least 1320-megawatts (MW) in Xiheishan Industrial Park, Qitai, Changji, Xinjiang, China with multiple units, some of which are not currently operating. It is also known as 新疆华电昌吉英格玛煤电一体化坑口电厂, 华电新疆西黑山(英格玛)电厂.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Xiheishan power station Xiheishan Industrial Park, Qitai, Changji, Xinjiang, China 44.555, 90.236 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase II Unit 3, Phase II Unit 4, Unit 1, Unit 2: 44.555, 90.236

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Phase II Unit 3 Announced[1] coal: bituminous[2][1] 660[1] ultra-supercritical[1] – False
Phase II Unit 4 Announced[1] coal: bituminous[2][1] 660[1] ultra-supercritical[1] – False
Unit 1 Operating[3] coal: bituminous[2] 660 ultra-supercritical 2024[3] False
Unit 2 Operating[4] coal: bituminous[2] 660 ultra-supercritical 2024[4] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase II Unit 3 Xinjiang Waneng Yinggema Power Generation Co Ltd [100%] Xinjiang Waneng Yinggema Power Generation Co Ltd [100.0%]
Phase II Unit 4 Xinjiang Waneng Yinggema Power Generation Co Ltd [100%] Xinjiang Waneng Yinggema Power Generation Co Ltd [100.0%]
Unit 1 Xinjiang Waneng Yinggema Power Generation Co Ltd [100%] Xinjiang Waneng Yinggema Power Generation Co Ltd [100.0%]
Unit 2 Xinjiang Waneng Yinggema Power Generation Co Ltd [100%] Xinjiang Waneng Yinggema Power Generation Co Ltd [100.0%]

Project-level captive use details

  • Captive industry use (heat or power): power
  • Captive industry: Coal Mining & Coal Products


Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on Project

In 2014, China Huadian was planning to build a two-unit coal-fired power plant with a total planned capacity of 1,320 MW in Xinjiang Uyghur Autonomous Region.[5]

The plant was permitted for construction in May 2015.[6]

As of January 2019, construction had not advanced beyond land clearing. Plans for the plant appeared to be shelved or deferred, perhaps to comply with central government restrictions (more below).

Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity

In 2016 China's National Energy Administration issued "scale control" (coal-fired capacity limits) on particular "sending out" locations that feed ultra-high voltage (UHV) long-distance power lines, including Inner Mongolia (Xilingong), Inner Mongolia (Ordos), Shaanxi, Ningxia, Shanxi, and Xinjiang.[7]

The affected area included this power station. As of January 2022, with no progress on the project since at least 2017, it was presumed shelved or cancelled.

For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.

Project revived

In September 2022, it became apparent that the project was underway, with Energy China Northwest Power Construction winning a related bid.[8]

In November 2022, construction reportedly started on the power station.[9]

In August 2023, the Unit 1 turbine foundation pour was completed[10]. In September 2023, the chimney structure was completed[11]. In October 2023, the turbine base was installed and the turbine hall roof pour was completed[12][13]. In November 2023, the Unit 1 indirect cooling tower was completed, with both towers reaching their tops[14][15]. In December 2023, the Unit 1 boiler back furnace was sealed[16].

In March 2024, the Unit 1 high-pressure cylinder and generator stator were installed[17][18]. In May 2024, the boiler was sealed and the chimney steel liner was completed[19][20], followed by the generator rotor installation[21]. In June 2024, the boiler hydraulic test was completed and the main transformer plant power system was energized[22][23]. In September 2024, the Unit 1 boiler ignition and blow-pipe test was successfully completed[24]. In October 2024, Unit 1 achieved first grid connection[25]. In November 2024, Unit 1 successfully completed the 168-hour trial run and was commissioned[26].

In May 2024, the Unit 2 generator stator and high-pressure cylinder were installed[27][28]. In July 2024, the generator rotor installation was completed[29]. In December 2024, Unit 2 successfully completed the 168-hour trial run and was commissioned[30].

Expansion: Phase II Units 3 & 4

In April 2026, the feasibility study service procurement notice was issued for the Phase II 2×660MW expansion project[31], with the feasibility study contract awarded later that month[32].

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://news.bjx.com.cn/html/20260414/1491859.shtml. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 https://news.bjx.com.cn/html/20241118/1411204.shtml. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 "2×660MW!新疆皖能英格玛电厂两台机组全部投产发电-北极星火力发电网". news.bjx.com.cn. 2024-12-31. Archived from the original on 2025-04-21. Retrieved 2025-01-08.
  5. ↑ 西黑山公司新建项目获得国家能源局路条, 华电新疆发电有限公司, 2014-8-28
  6. ↑ 东“疆电外送”配套7个电源项目已全部完成主厂房第一方混凝土浇筑, Xinjiang Technical Park, June 28, 2015
  7. ↑ 能源局下发13省市新建火电机组停建清单(附文件), Polaris, Jan 16, 2017
  8. ↑ 中国能建西北电建中标新疆华电昌吉英格玛煤电一体化坑口电厂一期工程Ⅱ标段, power.in-en, 2022-09-30
  9. ↑ 新疆昌吉英格玛2×660兆瓦煤电项目开工, BJX News, 2022-11-29
  10. ↑ "新疆昌吉英格玛电厂工程项目部1号机组汽机基座运转层浇筑完成". WeChat. 2023-08-05. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  11. ↑ "新疆华电昌吉英格玛煤电一体化坑口电厂一期工程烟囱外筒筒体结构顺利到顶". WeChat. 2023-09-06. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ "新疆昌吉英格玛电厂工程项目部1号机组汽机台板吊装就位". WeChat. 2023-10-15. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "新疆昌吉英格玛2×660MW总承包项目汽机房屋面最后一罐混凝土顺利浇筑完成". 北极星电力网. 2023-11-09. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "新疆华电昌吉英格玛煤电一体化坑口电厂一期工程1号间冷塔顺利到顶". WeChat. 2023-11-07. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "新疆华电昌吉英格玛煤电一体化坑口电厂一期(2×660兆瓦)工程1、2号间冷塔实现双到顶". 北极星电力网. 2023-11-27. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "新疆昌吉英格玛电厂工程项目部1号锅炉后炉膛顺利封门". 北极星电力网. 2023-12-13. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  17. ↑ "新疆昌吉英格玛电厂工程项目1号机组汽机本体高压缸吊装就位". 北极星电力网. 2024-03-07. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "新疆昌吉英格玛电厂工程项目1号机组汽机本体发电机定子顺利吊装就位". 北极星电力网. 2024-03-11. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  19. ↑ "新疆昌吉英格玛电厂工程项目1号锅炉顺利封门". WeChat. 2024-03-25. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  20. ↑ "新疆昌吉英格玛电厂工程项目烟囱钢内筒顺利到顶". 北极星电力网. 2024-05-27. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  21. ↑ "新疆昌吉英格玛电厂工程项目1号机组发电机转子顺利穿装". WeChat. 2024-05-25. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  22. ↑ "新疆昌吉英格玛电厂工程项目1号锅炉水压试验一次成功". WeChat. 2024-06-19. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  23. ↑ "新疆昌吉英格玛煤电一体化坑口电厂一期2×660兆瓦煤电工程项目1号机组主变压器厂用受电一次成功". WeChat. 2024-06-30. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  24. ↑ "新疆昌吉英格玛煤电一体化坑口电厂一期2×660兆瓦煤电工程1号机组点火冲管成功". 北极星电力网. 2024-09-29. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  25. ↑ "新疆华电昌吉英格玛煤电一体化坑口电厂一期2x660MW工程1号机组首次并网发电". 北极星电力网. 2024-10-25. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  26. ↑ "新疆皖能英格玛电厂1号机组顺利通过168小时满负荷试运行". WeChat. 2024-11-17. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  27. ↑ "新疆昌吉英格玛2×660MW超超临界空冷燃煤机组2#汽轮发电机定子顺利吊装就位". WeChat. 2024-05-01. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  28. ↑ "新疆昌吉英格玛项目2号机组汽机本体高压缸顺利吊装". WeChat. 2024-05-26. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  29. ↑ "新疆昌吉英格玛项目2号机组发电机穿转子工作顺利完成". WeChat. 2024-07-27. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  30. ↑ "新疆皖能英格玛电厂一期2x660MW超超临界燃煤间接空冷发电机组2号机组顺利完成168小时满负荷试运行". 北极星电力网. 2024-12-31. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  31. ↑ "新疆皖能英格玛电厂二期扩建2×66万千瓦新型煤电机组项目可行性研究服务项目采购公告". WeChat. 2026-04-01. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  32. ↑ "新疆皖能英格玛电厂二期扩建2×66万千瓦新型煤电机组项目可行性研究服务项目成交结果公告". WeChat. 2026-04-13. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.