Huadian Zhangqiu Gas Thermal power station
| Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
| Related categories: |
Huadian Zhangqiu Gas Thermal power station (华电章丘燃机热电厂, 章丘2×F级燃气-蒸汽联合循环热电联产项目) is an operating power station of at least 800-megawatts (MW) in Zhangqiu District, Jinan, Shandong, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Huadian Zhangqiu Gas Thermal power station | Zhangqiu District, Jinan, Shandong, China | 36.727987, 117.399261 (exact)[1] |
Unit-level coordinates (WGS 84):
- 1, 2: 36.727987, 117.399261
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Equipment | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| 1 | Operating[2] | fossil gas: natural gas[3] | 400[3][4] | combined cycle[3][4] | yes[3][4] | 2024[2] | Dongfang Electric Corporation: F-class[5] | no |
| 2 | Operating[6][7] | fossil gas: natural gas[3] | 400[4] | combined cycle[3][4] | yes[4] | 2024[6][7] | Dongfang Electric Corporation: F-class[5] | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 1 | Huadian Jinan Zhangqiu Thermal Power Co Ltd [100%][1] | Huadian Power International Co Ltd [70.0%]; Jinan Energy Group Co Ltd [30.0%] |
| 2 | Huadian Jinan Zhangqiu Thermal Power Co Ltd [100%][1] | Huadian Power International Co Ltd [70.0%]; Jinan Energy Group Co Ltd [30.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Huadian Zhangqiu Gas Thermal power station (华电章丘燃机热电厂) received approval from the Jinan Municipal Development and Reform Commission on August 30, 2017. [8]Construction officially began on June 18, 2022. Unit 1 and Unit 2 are planned to commence operation in December 2023 and March 2024, respectively.[9]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 "山东华电章丘2×400MW级燃机热电项目创优全过程咨询服务招标-北极星电力新闻网". m.bjx.com.cn. 2023-03-10. Archived from the original on 2024-05-23. Retrieved 2024-05-22.
- ↑ 2.0 2.1 "华电章丘2×400MW级燃机项目5号机组投产发电-北极星电力新闻网". m.bjx.com.cn. 2024-10-28. Archived from the original on 2025-03-07. Retrieved 2024-11-10.
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20210604210240/https://news.bjx.com.cn/html/20170831/846972.shtml. Archived from the original on 2021-06-04.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 https://www.sohu.com/a/558852900_121123758.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 "东方电气第100台燃机发运!-北极星电力新闻网". m.bjx.com.cn. 2024-01-22. Archived from the original on 2024-05-23. Retrieved 2024-05-22.
- ↑ 6.0 6.1 https://v.iqilu.com/ggpd/sdswjxw/2024/1205/5633083.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 http://sd.news.cn/20241204/15c21dcbc538414fb880e263df699203/c.html.
{{cite web}}: Missing or empty|title=(help) - ↑ "华电集团山东章丘2×F级燃气-蒸汽联合循环热电联产项目获核准". 2017-08-31. Retrieved 2023-11-16.
{{cite web}}: CS1 maint: url-status (link) - ↑ "山东首批、济南首个开工的重型燃气机组示范工程!山东华电章丘2×400MW级燃机项目启动". 2022-06-19. Retrieved 2023-11-16.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.
