Huaneng Dalian-2 power station (华能大连第二热电厂) is an operating power station of at least 800-megawatts (MW) in Haimao Street, Ganjingzi, Dalian, Liaoning, China. It is also known as 华能大连热电 (Unit 3, Unit 4), 大连开发区第二热电 (Unit 3, Unit 4).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huaneng Dalian-2 power station Haimao Street, Ganjingzi, Dalian, Liaoning, China 38.993019, 121.656412 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3, Unit 4: 38.993019, 121.656412

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 operating coal - unknown 50 subcritical 2020
Unit 2 operating coal - unknown 50 subcritical 2020
Unit 3 operating coal - unknown 350 supercritical 2022
Unit 4 operating coal - unknown 350 supercritical 2022

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Huaneng (Dalian) Thermal Power Co Ltd [100.0%]
Unit 2 Huaneng (Dalian) Thermal Power Co Ltd [100.0%]
Unit 3 Huaneng (Dalian) Thermal Power Co Ltd [100.0%]
Unit 4 Huaneng (Dalian) Thermal Power Co Ltd [100.0%]

Project-level captive use details

  • Captive industry use (heat or power): chemicals
  • Captive industry: Both

Project-level coal details

  • Permit(s): October 23, 2014

Background

China Huaneng sought permitting for 2 x 350 MW supercritical units in Ganjingzi District (Units 3-4) with two 50 MW back-pressure units (Units 1-2). The two 50 MW units were permitted for construction in 2015.[1]

As of July 2015, the two 50 MW back-pressured units were under construction. They were planned for commissioning in 2019.[2] They began operating in June 2020.[3]

2017: Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity

In January 2017 China's National Energy Administration suspended over 100 planned and under-construction coal power projects in 13 provinces, including unit 4 of Huaneng Dalian-2. It was unclear when or if the projects would be revived.[4][5] (For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.)

2021: Units 3-4 underway

Construction began on units 3 and 4 in 2021.[6]

Unit 3 was commissioned on June 1, 2022 and Unit 4 went into commercial operation on December 7, 2022.[7][8]

Articles and Resources

References

  1. 华能大连第二热电厂背压机组新建工程项目获核准 BJX News, 北极星电力网新闻中心,来源:华能集团. 11-17-2014
  2. "华能大连热电厂项目开工," China CEM, July 22, 2015
  3. "华能大连第二热电厂背压机组新建工程两台机组投产," 中国火力发电网, 2020-07-06
  4. "能源局下发13省市新建火电机组停建清单(附文件)," Polaris, Jan 16, 2017
  5. "国家能源局发文推迟辽宁、四川两省2个煤电项目," 中国电力化工网, 2017-01-17
  6. "华能大连第二热电厂新建工程4号机组发电机定子顺利吊装完成," 北极星电力网新闻中心, 2021/10/2
  7. 华能大连热电厂3号机组投入商运, BJX, 2022-06-01
  8. "我们的历史 - 2022年大事记". 中国华能集团有限公司网站. January 2023.{{cite web}}: CS1 maint: url-status (link)