Huaneng Dezhou power station (华能德州电厂) is an operating power station of at least 2700-megawatts (MW) in Decheng District, Dezhou, Shandong, China with multiple units, some of which are not currently operating. It is also known as 华鲁发电厂 (Unit 1).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huaneng Dezhou power station Decheng District, Dezhou, Shandong, China 37.449349, 116.2415516 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase IV Unit 7, Phase IV Unit 8, Phase V Unit 10, Phase V Unit 9, Unit 1, Unit 2, Unit 3, Unit 4, Unit 5, Unit 6: 37.449349, 116.2415516

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Phase IV Unit 7 Construction[2][3] coal: unknown[4][5] 660[5] ultra-supercritical[5] yes[6] 2026 (planned)[5] False
Phase IV Unit 8 Construction[2][3] coal: unknown[4][5] 660[5] ultra-supercritical[5] yes[6] 2026 (planned)[2] False
Phase V Unit 10 Announced[7] coal: unknown[4][7] 1000[7] ultra-supercritical[7] yes[7] – False
Phase V Unit 9 Announced[7] coal: unknown[4][7] 1000[7] ultra-supercritical[7] yes[7] – False
Unit 1 Operating coal: anthracite[4] 330 subcritical yes 1991 False
Unit 2 Operating coal: anthracite[4] 320 subcritical yes 1991 False
Unit 3 Operating coal: anthracite[4] 330 subcritical yes 1994 False
Unit 4 Operating coal: anthracite[4] 320 subcritical yes 1995 False
Unit 5 Operating coal: anthracite[4] 700 subcritical yes 2002 False
Unit 6 Operating coal: anthracite[4] 700 subcritical yes 2002 False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase IV Unit 7 Huaneng Dezhou Power Plant [100%] Huaneng Power International Inc [100.0%]
Phase IV Unit 8 Huaneng Dezhou Power Plant [100%] Huaneng Power International Inc [100.0%]
Phase V Unit 10 Huaneng Dezhou Power Plant [100%] Huaneng Power International Inc [100.0%]
Phase V Unit 9 Huaneng Dezhou Power Plant [100%] Huaneng Power International Inc [100.0%]
Unit 1 Huaneng Dezhou Power Plant [100%] Huaneng Power International Inc [100.0%]
Unit 2 Huaneng Dezhou Power Plant [100%] Huaneng Power International Inc [100.0%]
Unit 3 Huaneng Dezhou Power Plant [100%] Huaneng Power International Inc [100.0%]
Unit 4 Huaneng Dezhou Power Plant [100%] Huaneng Power International Inc [100.0%]
Unit 5 Huaneng Dezhou Power Plant [100%] Huaneng Power International Inc [100.0%]
Unit 6 Huaneng Dezhou Power Plant [100%] Huaneng Power International Inc [100.0%]

Project-level coal details

  • Coal source(s): domestic
  • Permit(s): 鲁发改项审﹝2023﹞308号[6][5]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

Huaneng Dezhou power station is a six-unit coal-fired power station totaling 2,650 MW in Dezhou Prefecture. It was commissioned from 1991 to 2002, and is owned by China Huaneng.[8]

In September 2023, the 2×660MW project received approval[9]. Throughout 2024, the project progressed with major equipment procurement and construction milestones. Construction began with foundation works in September 2024[10].

In March 2025, the first concrete pour for the main building occurred[11].

By mid-2026, Unit 7 had achieved power-on[12] and cooling tower completion[13].

Phase IV Unit 8 construction progressed alongside Unit 7, with generator stator installation in March 2026[14].

Feasibility study for the 2×1000MW Phase V project (Units 9 & 10) was initiated in December 2025[15]

Articles and Resources

References

  1. ↑ "华能德州电厂高灵活性清洁高效2×660兆瓦热电联产项目工程勘察设计招标公告". 采招网(www.bidcenter.com.cn). 2023-11-14. Archived from the original on 2024-01-25.
  2. ↑ 2.0 2.1 2.2 https://news.bjx.com.cn/html/20250314/1432022.shtml. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 http://www.sd.xinhuanet.com/20241230/3a4743e1b4f54da2a7b244a46834c6a5/c.html. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 "华能德州电厂高灵活性清洁高效2×660MW热电联产项目三大主机招标-北极星火力发电网". news.bjx.com.cn. 2023-12-04. Archived from the original on 2024-01-25. Retrieved 2023-12-19.
  6. ↑ 6.0 6.1 6.2 "推进德州电厂四期建设!鲁信实业与华能山东、华阳集团签约-北极星火力发电网". news.bjx.com.cn. 2023-09-12. Archived from the original on 2024-01-25. Retrieved 2023-12-21.
  7. ↑ 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 https://news.bjx.com.cn/html/20251208/1473477.shtml. {{cite web}}: Missing or empty |title= (help)
  8. ↑ "Huaneng Dezhou Coal Power Plant China," GEO, accessed July 2017
  9. ↑ "华能德州电厂高灵活性清洁高效2×660兆瓦热电联产项目用地保障工作推进会". 北极星电力网. 2023-09-22. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  10. ↑ "华能德州电厂高灵活性清洁高效2×660兆瓦热电联产项目推进会". WeChat. 2024-09-05. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  11. ↑ "华能德州电厂举行高灵活性清洁高效2台660MW热电联产项目主厂房浇筑第一方混凝土仪式". 北极星电力网. 2025-03-14. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ "华能德州电厂四期工程7号、8号机组厂用电倒送一次成功". WeChat. 2026-06-17. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "华能德州电厂四期2×660兆瓦清洁高效热电联产工程双曲线冷却塔筒壁顺利封顶". WeChat. 2026-04-13. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "华能德州电厂四期2×660MW清洁高效热电联产工程8号机组发电机定子顺利吊装成功". WeChat. 2026-03-08. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "华能山东分公司德州电厂五期煤电项目前期工程咨询服务项目招标公告". WeChat. 2025-12-05. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)