Huaneng Dongguan Gas Thermal power station (华能东莞燃机二期工程, 华能东莞燃机二期(2-1 and 2-2), 华能东莞燃机热电, 东莞华能谢岗天然气发电项目) is an operating power station of at least 1941-megawatts (MW) in Caole Village, Xie Gang Town, Dongguan, Guangdong, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Huaneng Dongguan Gas Thermal power station | Caole Village, Xie Gang Town, Dongguan, Guangdong, China | 22.983207, 114.102517 (exact)[1] |
Unit-level coordinates (WGS 84):
- 1-1, 1-2, 2-1, 2-2: 22.983207, 114.102517
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Equipment | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| 1-1 | Operating[2] | fossil gas: natural gas[3] | 473[3] | combined cycle[2] | yes[3] | 2020[4] | Dongfang Electric Corporation: M701F4[5] | no |
| 1-2 | Operating[2] | fossil gas: natural gas[3] | 472.5[3] | combined cycle[2] | yes[3] | 2020[6] | Dongfang Electric Corporation: M701F4[5] | no |
| 2-1 | Operating[7] | fossil gas: natural gas[8] | 498[9] | combined cycle[8] | not found | 2025[7] | Dongfang Electric Corporation: M701F4[5] | no |
| 2-2 | Operating[10] | fossil gas: natural gas[8] | 498[9] | combined cycle[8] | not found | 2025[10] | Dongfang Electric Corporation: M701F4[5] | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 1-1 | Huaneng Dongguan Gas Turbine Thermal Power Co Ltd [100%][11][12][3][13] | Huaneng Power International Inc [80.0%]; Kunlun Energy Company Limited Co Ltd [20.0%] |
| 1-2 | Huaneng Dongguan Gas Turbine Thermal Power Co Ltd [100%][11][12][3][13] | Huaneng Power International Inc [80.0%]; Kunlun Energy Company Limited Co Ltd [20.0%] |
| 2-1 | Huaneng Dongguan Gas Turbine Thermal Power Co Ltd [100%][11][12][3][13] | Huaneng Power International Inc [80.0%]; Kunlun Energy Company Limited Co Ltd [20.0%] |
| 2-2 | Huaneng Dongguan Gas Turbine Thermal Power Co Ltd [100%][11][12][3][13] | Huaneng Power International Inc [80.0%]; Kunlun Energy Company Limited Co Ltd [20.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Phase I of this project received approval from the Guangdong Provincial Development and Reform Commission in August 2015. It officially entered construction on December 26, 2017[14], and went into operation on August 27, 2020.[15]
The Phase II of this project received approval from the Guangdong Provincial Development and Reform Commission in February 2022. [16]It officially entered construction in May 2023[17], and it is expected to start operation in the second half of 2024.[18]
Articles and Resources
References
- ↑ https://web.archive.org/web/20210605004839/https://www.sohu.com/a/204248149_379273. Archived from the original on 2021-06-05.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 http://www.nengyuanjie.net/article/40264.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 https://web.archive.org/web/20210604044901/https://www.china5e.com/news/news-1015993-1.html. Archived from the original on 2021-06-04.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20210604210632/https://news.bjx.com.cn/html/20200611/1080412.shtml. Archived from the original on 2021-06-04.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 "华能广东公司东莞热电公司2025至2028年全厂设备日常检修维护服务招标公告". 2025-01-21. Archived from the original on 2025-06-28. Retrieved 2025-06-23.
- ↑ https://news.dayoo.com/gzrbyc/202004/21/158752_53299437.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 https://www.chng.com.cn/detail_jtyw/-/article/ccgb60va5Gwc/v/1271761.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 8.2 8.3 ,http://dgdp.dg.gov.cn/zmhd/zjdc/content/post_3597902.html https://www.powerchina.cn/art/2023/5/17/art_7445_1667654.html ,http://dgdp.dg.gov.cn/zmhd/zjdc/content/post_3597902.html.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 9.0 9.1 https://www.powerchina.cn/art/2023/5/17/art_7445_1667654.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.0 10.1 https://news.qq.com/rain/a/20250928A04EGP00?suid=&media_id=.
{{cite web}}: Missing or empty|title=(help) - ↑ 11.0 11.1 11.2 11.3 "华能东莞燃机二期项目开工 建成后年发电量约40亿千瓦时__南方+_南方plus". static.nfapp.southcn.com. 2023-11-01. Archived from the original on 2024-04-16. Retrieved 2024-04-15.
- ↑ 12.0 12.1 12.2 12.3 https://www.qcc.com/firm_66TQ5ZX.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 13.0 13.1 13.2 13.3 https://web.archive.org/web/20220415233527/http://dgdp.dg.gov.cn/zmhd/zjdc/content/post_3597902.html. Archived from the original on 2022-04-15.
{{cite web}}: Missing or empty|title=(help) - ↑ "华能东莞燃机热电一期工程正式开工". 2017-12-29. Retrieved 2023-10-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "广东火电参建的东莞燃机热电一期工程全面投产". 2020-09-09. Retrieved 2023-10-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "广东省发展改革委关于华能东莞燃机二期工程项目核准的批复". 2022-02-16. Retrieved 2023-10-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华能东莞燃机二期项目正式开工". 2023-05-17. Retrieved 2023-10-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "高质量发展看东莞|华能东莞热电二期将于明年下半年投产发电". 2023-02-27. Retrieved 2023-10-30.
{{cite web}}: CS1 maint: url-status (link)