Huaneng Qingyuan power station (华能清远高新区燃气电厂二期 (Unit 2-1 and Unit 2-2), 华能清远高新区燃气电厂一期 (Unit 1-1 and Unit 1-2)) is a power station in Qingcheng District, Qingyuan, Guangdong, China with multiple units of varying statuses, none of which are currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huaneng Qingyuan power station Qingcheng District, Qingyuan, Guangdong, China 23.637690816597384, 113.04282063602038 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1-1, 1-2, 2-1, 2-2, 3-1: 23.637690816597384, 113.04282063602038

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1-1 Construction[2][3] fossil gas: natural gas[4] 120[4][5] combined cycle[5] yes[4][5] 2024 (planned)[6]
1-2 Construction[2][3] fossil gas: natural gas[4] 120[4] combined cycle[5] yes[4][5] 2024 (planned)[6]
2-1 Announced[7] fossil gas: natural gas[7][5] 460[7] combined cycle[7] yes[7]
2-2 Announced[7] fossil gas: natural gas[7][5][1] 460[7] combined cycle[7] yes[7]
3-1 Announced[1] fossil gas: natural gas[1] 460[1] gas turbine[1] not found

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1-1 Huaneng (Qingyuan) Gas Turbine Thermal Power Co Ltd [100%][6][1] Huaneng (Qingyuan) Gas Turbine Thermal Power Co Ltd [100.0%]
1-2 Huaneng (Qingyuan) Gas Turbine Thermal Power Co Ltd [100%][6][1] Huaneng (Qingyuan) Gas Turbine Thermal Power Co Ltd [100.0%]
2-1 Huaneng (Qingyuan) Gas Turbine Thermal Power Co Ltd [100%][6][1] Huaneng (Qingyuan) Gas Turbine Thermal Power Co Ltd [100.0%]
2-2 Huaneng (Qingyuan) Gas Turbine Thermal Power Co Ltd [100%][6][1] Huaneng (Qingyuan) Gas Turbine Thermal Power Co Ltd [100.0%]
3-1 Huaneng (Qingyuan) Gas Turbine Thermal Power Co Ltd [100%][6][1] Huaneng (Qingyuan) Gas Turbine Thermal Power Co Ltd [100.0%]

Background

The first phase (Unit 1-1 and Unit 1-2) of Huaneng Qingyuan power station (华能清远高新区燃气电厂) obtained approval from the Guangdong Provincial Development and Reform Commission in December 2020 and received capacity change approval in June 2021. Construction officially commenced on April 26, 2022, with an expected operational date by the end of 2023.[8]

The second phase(Unit 2-1 and Unit 2-2) of Huaneng Qingyuan power station (华能清远高新区燃气电厂) will construct 2×460MW gas-steam combined cycle units.[9]

Articles and Resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 "华能清远燃机热电一期(2×120MW)工程相关的3项招标-北极星电力新闻网". m.bjx.com.cn. 2022-11-24. Archived from the original on 2024-05-07. Retrieved 2024-05-02.
  2. 2.0 2.1 http://www.gdqy.gov.cn/xxgk/zzjg/zfjg/gdqygxqgwh/zwgk/gxqdt/content/post_1940829.html. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20220708181045/https://news.bjx.com.cn/html/20220429/1221851.shtml. Archived from the original on 2022-07-08. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20220708182225/http://drc.gd.gov.cn/xmgg/content/post_3720387.html. Archived from the original on 2022-07-08. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 http://www.gdqy.gov.cn/jjqy/tzzs/swzx/content/post_1550201.html. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 "宣讲会详情". m.bysjy.com.cn. Archived from the original on 2024-05-07. Retrieved 2024-05-02.
  7. 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 https://www.ccedia.com/news/3080.html. {{cite web}}: Missing or empty |title= (help)
  8. "总投资15亿元 年发电超13亿度 华能清远高新区燃机热电一期工程开工建设". 2022-04-29. Retrieved 2023-10-31.{{cite web}}: CS1 maint: url-status (link)
  9. "总投资15亿元!华能清远高新区燃机热电一期工程开工". 2022-05-05. Retrieved 2023-10-31.{{cite web}}: CS1 maint: url-status (link)