Huasheng Jiangquan cogen power station (临沂恒新能源集团恒新能源2×35万千瓦热电联产项目, 华盛江泉罗庄热电联产项目) is an operating power station of at least 700-megawatts (MW) in Xishantou Village, Luozhuang District, Linyi, Shandong, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huasheng Jiangquan cogen power station Xishantou Village, Luozhuang District, Linyi, Shandong, China 34.945412, 118.313026 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 34.945412, 118.313026

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Unit 1 Operating[2] coal: waste coal[3][1] 350[1] supercritical[1] yes 2025[2] False
Unit 2 Operating[4] coal: waste coal[3][1] 350[1] supercritical[1] yes 2025[4] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Shandong Huasheng Jiangquan Thermoelectricity Co Ltd [100%] Huasheng Jiangquan Group Co Ltd [95.0%]; natural person(s) [5.0%]
Unit 2 Shandong Huasheng Jiangquan Thermoelectricity Co Ltd [100%] Huasheng Jiangquan Group Co Ltd [95.0%]; natural person(s) [5.0%]

Project-level coal details

  • Coal source(s): domestic
  • Permit(s): 鲁发改能源〔2017〕51号[1]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on Project

Huasheng Jiangquan cogen power station is a proposed 2 x 350 MW coal plant in Xishantou Village, Luozhuang District, sponsored by Huasheng Jiangquan Group.[5]

Construction was reported in January 2017,[6] however satellite photos through May 2018 show no construction, and a meeting to discuss preliminary work on the project was held in May 2018,[7] suggesting construction is still planned but has yet to begin.

Construction was reported in March 2019.[8]

In July 2022, the project was restarted[9].

In 2023, construction resumed for Units 1 & 2. By December 2024, the construction was nearly completed, with light smoke observed from the chimney[10]. Unit 1 was ignited in December 2024 and started trial operation.

In January 2025, the first turbine unit was successfully started[11]. In July 2025, Unit 1 achieved grid connection[12]. In August 2025, Unit 1 completed its 168‑hour trial run and entered commercial operation[13].

In December 2024, Unit 2 boiler was ignited for trial operation[14]. In May 2025, Unit 2 completed its 168‑hour trial run and entered commercial operation[15].

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 http://fgw.shandong.gov.cn/art/2017/3/16/art_102383_7446063.html. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 "临沂恒新能源2×350MW热电联产项目全部投运". 北极星火力发电网. 2025-09-02. Archived from the original on 2026-05-14. Retrieved 2025-09-02.
  3. 3.0 3.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 "正式投运!恒新能源2×350MW热电联产项目2号机组168小时满负荷试运行圆满成功!". 火电之声. 2025-5-2. Archived from the original on 2026-05-14. Retrieved 2025-9-2. {{cite web}}: Check date values in: |access-date= and |date= (help)
  5. "华盛江泉集团2×350MW热电联产项目社会稳定风险评估会议召开," Huasheng Jiangquan Group, accessed Nov 2016
  6. "华盛江泉集团2×35万千瓦热电联产项目奠基," 凤凰网资讯, Jan 27, 2017
  7. "华盛江泉集团2×350MW热电联产项目初步设计审查会议召开," Huasheng Jiangquan Group, 2018-05-24
  8. "预算投资30亿!罗庄一热电联产项目开工建设," 致远天宸府, 2019年03月28日
  9. "副市长毕黎明来华盛江泉2×350MW热电联产项目现场办公,项目复工建设". 华盛江泉集团. 2022-07-07. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  10. "恒新能源热电联产项目第一台机组整体试运行". 山东新闻网. 2024-12-27. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  11. "临沂恒新能源2×350MW热电联产项目1号汽轮机组一次启动成功". WeChat. 2025-01-16. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  12. "山东临沂2×350兆瓦热电联产项目#1机组并网一次成功". WeChat. 2025-07-31. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  13. "恒新能源1号机组顺利通过168小时满负荷试运行". BJX. 2025-09-02. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  14. "临沂恒源热力集团恒新能源2×35万千瓦热电联产项目2号锅炉首次点火试运仪式举行". WeChat. 2025-02-21. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  15. "临沂恒源热力集团恒新能源2×35万千瓦热电联产项目2号机组顺利通过168小时满负荷试运行". WeChat. 2025-05-01. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)