Huayin Zhuzhou power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Huayin Zhuzhou power station (大唐华银株洲发电厂) is an operating power station of at least 2680-megawatts (MW) in Gantian Town, Lukou District, Zhuzhou, Hunan, China with multiple units, some of which are not currently operating. It is also known as Zhuzhou-2 power station, 大唐华银电力株洲发电公司搬迁发展项目 (Relocation Unit 5 & 6), 大唐华银株洲2×100万千瓦扩能升级改造项目.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Huayin Zhuzhou power station | Gantian Town, Lukou District, Zhuzhou, Hunan, China | 27.463142, 113.120876 (exact)[1] |
Unit-level coordinates (WGS 84):
- Relocation Unit 1, Relocation Unit 2: 27.463142, 113.120876
- Unit 1, Unit 2, Unit 3, Unit 4: 27.8580888, 113.1199491
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Relocation Unit 1 | Operating[2][3] | coal: anthracite[4][1] | 1000[1] | ultra-supercritical[3] | 2025[2] | – | False |
| Relocation Unit 2 | Operating[5][3] | coal: anthracite[4][1] | 1000[1] | ultra-supercritical[3] | 2026[5] | – | False |
| Unit 1 | Retired | coal: anthracite[4] | 125 | subcritical | 1993 | 2008 | False |
| Unit 2 | Retired | coal: anthracite[4] | 125 | subcritical | 1994 | 2008 | False |
| Unit 3 | Operating | coal: anthracite[4] | 340 | subcritical | 2004 | – | False |
| Unit 4 | Operating | coal: anthracite[4] | 340 | subcritical | 2004 | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Relocation Unit 1 | Datang Huayin Zhuzhou Electricity Generate Co Ltd [100%] | Datang Huayin Electric Power Co Ltd [100.0%] |
| Relocation Unit 2 | Datang Huayin Zhuzhou Electricity Generate Co Ltd [100%] | Datang Huayin Electric Power Co Ltd [100.0%] |
| Unit 1 | Datang Huayin Zhuzhou Electricity Generate Co Ltd [100%] | Datang Huayin Electric Power Co Ltd [100.0%] |
| Unit 2 | Datang Huayin Zhuzhou Electricity Generate Co Ltd [100%] | Datang Huayin Electric Power Co Ltd [100.0%] |
| Unit 3 | Datang Huayin Zhuzhou Electricity Generate Co Ltd [100%] | Datang Huayin Electric Power Co Ltd [100.0%] |
| Unit 4 | Datang Huayin Zhuzhou Electricity Generate Co Ltd [100%] | Datang Huayin Electric Power Co Ltd [100.0%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Huayin Zhuzhou power station includes two-unit coal-fired power plant with a total capacity of 680 MW. The power station's first two units were commissioned in 1993-1994 and retired in 2008. In 2004, two operating units were completed. The power station was owned by China Datang.[6]
Expansion: Relocation units
In May 2019, plans for a 2 x 1,000 MW expansion at the power station were reported.[7]
The capacity was permitted in February 2022.[8][9] Construction was expected to start in July 2022,[10] but reportedly began on September 28, 2022.[11]
In August 2023, a project investment announcement was made[12]. In September 2023, a construction ceremony was held[13]. In October 2023, the construction permit was approved by the group[14]. In December 2023, the first concrete pour for the main plant took place[15].
In February 2024, the first boiler steel frame for Relocation Unit 1 was erected[16]. In March 2024, excavation for the first cooling tower began[17]. In April 2024, the chimney foundation concrete was poured[18]. In May 2024, the main plant foundation reached the zero‑meter level[19]. In September 2024, the first boiler header was lifted[20]. In October 2024, the boiler heating surface was lifted[21]. In December 2024, the turbine deck concrete was poured[22].
In January 2025, the chimney structure was topped[23]. In March 2025, the turbine was bucked[24]. In May 2025, the first cooling tower structure was completed[25]. In June 2025, the unit achieved auxiliary power acceptance[26]. In July 2025, the generator rotor was inserted[27]. In November 2025, the main plant structure was topped out[28]. In December 2025, Relocation Unit 1 achieved grid connection[29] and completed its 168‑hour trial run, entering commercial operation[30].
In June 2026, a tender for the smart plant management platform was issued[31].
Unit 2's boiler header was lifted in October 2024[32], the cooling tower ring beam was poured[33], and the desulfurization system construction started[34]. In November 2024, the boiler heating surface was lifted[35]. In December 2024, the main plant structure was under construction at the 43‑meter level[36].
In January 2025, the main plant continued construction. In March 2025, the high‑voltage transformer was positioned[37]. In April 2025, the deaerator was positioned[38]. In June 2025, the generator stator was positioned, and auxiliary power acceptance was achieved[39]. In October 2025, the boiler hydrostatic test was completed[40]. In November 2025, the turbine bucking was completed[41].
In January 2026, the boiler steam blow for Relocation Unit 2 was completed[42]. In February 2026, Unit 2 completed its 168‑hour trial run[43].
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://news.bjx.com.cn/html/20220208/1202873.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://news.bjx.com.cn/html/20251226/1476681.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 "大唐华银株洲2×100万千瓦扩能升级改造项目全面施工-北极星火力发电网". news.bjx.com.cn. 2023-12-04. Archived from the original on 2024-01-25. Retrieved 2023-12-06.
- ↑ 4.0 4.1 4.2 4.3 4.4 4.5 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 https://news.bjx.com.cn/html/20260210/1483644.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ Coal-Fired Plants in China: Hunan & Jiangxi, Industcards, accessed Sept. 2015.
- ↑ "大唐华银株电搬迁发展2×1000MW煤电项目 初步选定渌口区淦田镇," 株洲市人大, 2019/5/30
- ↑ 大唐华银株洲退城进郊2×100万千瓦煤电项目一期签约, BJX, 2021-08-25
- ↑ 大唐华银株洲2×100万千瓦扩能升级改造项目获核准, BJX, 2022-02-08
- ↑ 株洲电厂搬迁项目计划7月开工, hunan.voc, 2022-01-24
- ↑ 大唐华银株洲电厂2×100万千瓦扩能升级改造项目开工, BJX, 2022-09-29
- ↑ "华银电力:拟投建大唐华银株洲2×100万千瓦扩能升级改造项目". Sohu. 2023-08-31. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2X100万千瓦扩能升级改造项目桩基工程开工仪式举行". WeChat. 2023-09-16. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×1000MW煤电项目开工申请获得集团批复". BJX. 2023-11-07. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目首砼浇筑成功". BJX. 2023-12-04. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "株洲发电公司举行百万煤电项目1号锅炉钢架开吊仪式". BJX. 2024-02-29. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目1号冷却塔土方顺利开挖". WeChat. 2024-03-23. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目烟囱基础大体积混凝土浇筑完成". WeChat. 2024-04-24. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×1000兆瓦扩能升级改造项目1号主厂房基础出零米". WeChat. 2024-05-30. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "株洲百万煤电项目1号锅炉大板梁顺利起吊". WeChat. 2024-09-28. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×1000兆瓦扩能升级改造项目1号锅炉受热面开吊". WeChat. 2024-10-16. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目1号汽机基座混凝土顺利完成浇筑". BJX. 2024-12-17. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲电厂项目烟囱顺利封顶". BJX. 2025-01-17. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×1000兆瓦扩能升级改造项目1号机组除氧器吊装就位". WeChat. 2025-03-07. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×1000兆瓦扩能升级改造项目1号冷却塔顺利结顶". WeChat. 2025-05-19. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目厂用电受电一次成功". BJX. 2025-06-23. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×1000兆瓦扩能升级改造项目1号机组发电机转子穿装就位". WeChat. 2025-07-28. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲电厂项目主体结构全面封顶". 人民网. 2025-11-01. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目1号机组首次并网一次成功". WeChat. 2025-12-02. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目1号机组顺利通过168小时试运行". WeChat. 2025-12-25. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×1000MW扩能升级改造项目智慧电厂管控平台招标公告". BJX. 2026-06-03. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲电厂2×100万千瓦扩能升级改造项目2号机组锅炉钢架首根双机塔吊大板梁顺利吊装". WeChat. 2024-10-12. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×1000兆瓦扩能升级改造项目2号冷却塔环梁顺利浇筑". WeChat. 2024-10-31. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×1000兆瓦扩能升级改造项目脱硫系统正式开工". WeChat. 2024-10-31. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目2号机组锅炉受热面顺利开吊". WeChat. 2024-11-15. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目1、2号主厂房43米层梁板正在浇筑中". BJX. 2024-12-23. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目2号机组高压启动/备用变压器顺利就位". WeChat. 2025-03-01. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目2号机组除氧器顺利吊装就位". WeChat. 2025-04-07. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目2号机组汽机房发电机定子吊装就位". WeChat. 2025-06-06. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐株洲2×1000MW项目2号机组锅炉水压试验一次成功". WeChat. 2025-10-30. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目2号机组汽轮机扣盖完成". WeChat. 2025-11-25. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目2号机组锅炉点火吹管一次成功". BJX. 2026-01-12. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐华银株洲2×100万千瓦扩能升级改造项目2号机组一次性顺利通过168小时满负荷试". BJX. 2026-02-10. Retrieved 2026-07-21.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.