Hubei Yicheng power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Hubei Yicheng power station (湖北能源襄阳宜城发电厂) is an operating power station of at least 2000-megawatts (MW) in Yicheng, Xiangyang, Hubei, China with multiple units, some of which are not currently operating. It is also known as 湖北能源宜城路口发电项目.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Hubei Yicheng power station | Yicheng, Xiangyang, Hubei, China | 31.781843, 112.129461 (exact) |
Unit-level coordinates (WGS 84):
- Phase II Unit 3, Phase II Unit 4, Unit 1, Unit 2: 31.781843, 112.129461
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Phase II Unit 3 | Announced[1] | coal: unknown[2][1] | 1000[1] | ultra-supercritical[1] | – | False |
| Phase II Unit 4 | Announced[1] | coal: unknown[2][1] | 1000[1] | ultra-supercritical[1] | – | False |
| Unit 1 | Operating | coal: unknown[2] | 1000 | ultra-supercritical | 2023 | False |
| Unit 2 | Operating[3] | coal: unknown[2] | 1000 | ultra-supercritical | 2023 | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase II Unit 3 | Hubei Energy Group Xiangyang Yicheng Power Generation Co Ltd [100%] | Hubei Energy Group Co Ltd [100.0%] |
| Phase II Unit 4 | Hubei Energy Group Xiangyang Yicheng Power Generation Co Ltd [100%] | Hubei Energy Group Co Ltd [100.0%] |
| Unit 1 | Hubei Energy Group Xiangyang Yicheng Power Generation Co Ltd [100%] | Hubei Energy Group Co Ltd [100.0%] |
| Unit 2 | Hubei Energy Group Xiangyang Yicheng Power Generation Co Ltd [100%] | Hubei Energy Group Co Ltd [100.0%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background on Project
Hubei Yicheng power station is a proposed 2 x 1,000 MW coal plant in the city of Yicheng, proposed by Hubei Energy Group in June 2020.[4]
It was permitted for construction in December 2020.[5]
Construction began in October 2021.[6]
Unit 1 entered operation on 14 July 2023.[7][8]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://news.bjx.com.cn/html/20251103/1467979.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ ""十四五"湖北最大电源项目又一百万千瓦机组建成投产-北极星火力发电网". news.bjx.com.cn. 2023-12-05. Archived from the original on 2024-01-25. Retrieved 2023-12-06.
- ↑ "签约!2台百万火电机组落户湖北省," 北极星电力网新闻中心, 2020/6/15
- ↑ "湖北能源襄阳(宜城)2×1000MW超超临界燃煤机组工程项目获得核准 - 北极星火力发电网". news.bjx.com.cn. 2020-12-15. Retrieved 2020-12-18.
{{cite web}}: CS1 maint: url-status (link) - ↑ "【建设公司】湖北能源襄阳宜城电厂2号机组举行开工仪式," 建设公司, 2021-09-29
- ↑ ""十四五"湖北最大电源项目首台机组通过168小时满负荷试运!". 北极星火电网. 2023-07-17. Retrieved 2023-8-16.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "襄阳宜城2×1000兆瓦火电项目首台机组通过168小时满负荷试运!". 电力项目圈. 2023-07-15. Retrieved 2023-8-16.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.