Huizhou LNG Terminal
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Huizhou LNG Terminal, also known as 粤电惠州LNG接收站, is an LNG import terminal in China with units that are proposed and operating.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Phase 1 | Huidong, Huizhou, Guangdong, China[1] | 22.611927, 114.742272 (exact) |
| Phase 2 | Huidong, Huizhou, Guangdong, China[1] | 22.611927, 114.742272 (exact) |
The map below shows the exact location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Phase 1 | import[2] | operating[3] | 4 mtpa[1] | 7.75 mtpa | False | – |
| Phase 2 | import[4] | proposed[5] | 3.75 mtpa[6] | 7.75 mtpa | False | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Phase 1 | import[2] | US$1,056,000,000 (6,600,000,000 RMB)[7] | US$1,570,579,200 |
| Phase 2 | import[4] | US$514,579,200 (3,216,120,000 RMB)[8] | US$1,570,579,200 |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Phase 1 | import[2] | operating[3] | – | – | 2021[6] | 2024[3] | – |
| Phase 2 | import[4] | proposed[5] | 2024[5] | – | – | – | – |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Phase 1 | import[2] | operating[3] | Guangdong Huizhou LNG Co Ltd [100%][9] | Guangdong Hengjian Investment Holding Co Ltd [76.0%]; China Huaneng Group Co Ltd [24.0%] | – |
| Phase 2 | import[4] | proposed[5] | Guangdong Huizhou LNG Co Ltd [100%][9] | Guangdong Hengjian Investment Holding Co Ltd [76.0%]; China Huaneng Group Co Ltd [24.0%] | – |
Background
Phase 1(惠州LNG接收站项目一期)
Huizhou LNG Terminal (惠州LNG接收站) is a LNG terminal under construction in Huizhou, Guangdong, China.
Yudean was hiring workers to build the facility as of September 2019.[10]
On Sep 2018, Guangdong Province, Huizhou City,signed a memorandum of cooperation for the Huizhou LNG terminal with ExxonMobil.[11]
The LNG terminal was planning to build three 200,000-cubic-meter storage tanks, with receiving capacity of 4 mtpa. [12] Phase 1 has a baseload capacity of 4 mtpa and a maximum capacity of 6.1 mtpa. [13]
On January 2020, the Energy Conservation Report of Huizhou LNG Terminal was approved by Guangdong Provincial Energy Bureau.[14]
In July 2021, Huizhou LNG terminal project was permitted by the National Development and Reform Commission (NDRC).[15]
The construction of Huizhou LNG Terminal began in August 2021.[16] The operating date was set at the end of 2023 or early 2024.[17][18]
As of January 2023, the construction is ongoing. [19]
The construction is at the very end stage as of January 2024.[20]
The first LNG cargo arrived at Huizhou LNG terminal, marking the operation of the terminal[21].
Phase 2 (惠州LNG接收站项目二期)
On September 24, 2024, the Guangdong Provincial Development and Reform Commission approved the Phase 2 project.[22]
In 2026, the project was included in both the “20 Key Provincial Projects on the Renping Peninsula” and “Huizhou’s 176 Key Provincial Projects.” [23][24]
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 (PDF) http://gdee.gd.gov.cn/attachment/0/388/388059/2913014.PDF.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 http://seg-pfcc.sinopec.com/seg-pfcc/news/pro_dynamic/20240116/news_20240116_684359677353.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 http://www.huizhou.cn/news/newsc_counties/newsc_hz/202409/t20240930_1571582.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 https://wap.315i.com/wapInfo/jsdDetail?infoId=15369935.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 https://drc.gd.gov.cn/xmgs/content/post_4492624.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 https://finance.sina.cn/futuremarket/qszx/2021-07-25/detail-ikqcfnca8969876.d.html.
{{cite web}}: Missing or empty|title=(help) - ↑ https://gzw.gd.gov.cn/gkmlpt/content/4/4053/mmpost_4053690.html.
{{cite web}}: Missing or empty|title=(help) - ↑ https://drc.gd.gov.cn/gkmlpt/content/4/4499/post_4499041.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.0 9.1 https://www.qcc.com/firm/d3127901bcf0e3be7ac3e82120083e64.html.
{{cite web}}: Missing or empty|title=(help) - ↑ Creating Huizhou LNG Terminal Recruitment Guide, Ying Jiesheng, Sep. 24, 2019
- ↑ Reuters Staff (2018-09-06). "广东等与埃克森美孚签署化工综合体项目初步投资协议". U.S. Retrieved 2021-03-29.
{{cite news}}:|last=has generic name (help) - ↑ "惠州LNG接收站项目环境影响评价公众参与说明" (PDF). 2020-02-01.
{{cite web}}: CS1 maint: url-status (link) - ↑ "惠州LNG接收站项目环境影响评价公众参与说明" (PDF). 2020-02. Retrieved 2026-03-22.
{{cite web}}: Check date values in:|date=(help)CS1 maint: url-status (link) - ↑ "广东省发展和改革委员会 - 通知公告". drc.gd.gov.cn. 2020-01-09. Retrieved 2021-03-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "【关于惠州液化天然气接收站项目核准的批复(发改能源〔2021〕1003号)】-国家发展和改革委员会". www.ndrc.gov.cn. 2021-07-07. Retrieved 2023-02-01.
{{cite web}}: CS1 maint: url-status (link) - ↑ "惠州LNG接收站项目正式开工-新华网". www.gd.xinhuanet.com. Retrieved 2021-08-19.
- ↑ "惠州LNG接收站项目开工 - 中化新网". www.ccin.com.cn (in 中文(中国大陆)). 2021-07-27.
{{cite web}}: CS1 maint: url-status (link) - ↑ "惠州LNG接收站项目开工--上海石油天然气交易中心--Sina Mobile". finance.sina.cn. 2021-07-25.
{{cite web}}: CS1 maint: url-status (link) - ↑ 惠州海事局 (2023-01-06). "关于惠州LNG接收项目配套码头工程作业的通告 - 中华人民共和国海事局". www.msa.gov.cn (in 中文(中国大陆)).
{{cite web}}: CS1 maint: url-status (link) - ↑ "惠州LNG接收站项目储罐工程顺利实现机械完工 | 第四建设有限公司". seg-pfcc.sinopec.com. 2024-01-16.
{{cite web}}: no-break space character in|title=at position 23 (help)CS1 maint: url-status (link) - ↑ "【省重点项目】首船靠泊接卸!惠州LNG接收站投入试生产". gzw.gd.gov.cn (in 中文). 2024-09-04. Retrieved 2025-07-02.
{{cite web}}: CS1 maint: url-status (link) - ↑ "关于惠州LNG接收站项目二期工程核准的批复". 2024-09-24. Retrieved 2026-03-22.
{{cite web}}: CS1 maint: url-status (link) - ↑ "稔平半岛20宗项目纳入省重点项目 计划总投资1497亿". 2026-02-28. Retrieved 2026-03-22.
{{cite web}}: CS1 maint: url-status (link) - ↑ "今年惠州安排176个省重点项目". 2026-01-28. Retrieved 2026-03-22.
{{cite web}}: CS1 maint: url-status (link)
