This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
|
Sub-articles:
|
|
Hunan Natural Gas Pipeline Network 湖南天然气输气管网 is a gas pipeline network in Hunan Province, China, with pipelines that are proposed, in construction, and operating.
Location
湖南省天然气管网分布图-湖南省交通厅-发布日期:2019-03-21
The pipeline network runs throughout Hunan Province, China.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":27.4,"lon":111.92,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.8287341,"lon":112.9510288},{"lat":27.8401889,"lon":112.6553923},{"lat":27.7974727,"lon":112.2798634},{"lat":27.7025675,"lon":111.9918292},{"lat":27.6917245,"lon":111.6647445},{"lat":27.6536865,"lon":111.6456404},{"lat":27.41001,"lon":111.481717},{"lat":27.2380123,"lon":111.4679411}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.943539,"lon":111.463676},{"lat":29.450623,"lon":111.620627},{"lat":29.574483,"lon":111.42996},{"lat":29.629382,"lon":111.764226},{"lat":29.63645,"lon":111.8608},{"lat":29.395004,"lon":112.17405}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.2275472,"lon":112.9372648},{"lat":28.4708924,"lon":112.7875881},{"lat":28.4905407,"lon":112.5750012},{"lat":28.5549043,"lon":112.353296},{"lat":28.6447196,"lon":112.2333433},{"lat":28.7046157,"lon":112.1164831},{"lat":28.9996495,"lon":111.7487013},{"lat":29.031982,"lon":111.7015498}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.2272411,"lon":112.937571},{"lat":28.2427744,"lon":113.1086935},{"lat":28.2357027,"lon":113.2259351},{"lat":28.1563316,"lon":113.3806041},{"lat":28.1138597,"lon":113.4723047},{"lat":28.1109639,"lon":113.5977898},{"lat":28.1635835,"lon":113.6425789}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.2273679,"lon":112.9373878},{"lat":28.4698675,"lon":112.7870107},{"lat":28.4896435,"lon":112.5760666},{"lat":28.5541621,"lon":112.3547804}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.9477195,"lon":109.5998318},{"lat":27.9265568,"lon":109.4453799},{"lat":27.9007602,"lon":109.3333257},{"lat":27.8413372,"lon":109.2621258},{"lat":27.7328057,"lon":109.1897487}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":25.752491,"lon":112.7334454},{"lat":25.768957,"lon":112.828596},{"lat":25.7747423,"lon":112.8766452},{"lat":25.7819982,"lon":112.9262272},{"lat":25.7826029,"lon":112.9679486},{"lat":25.773533,"lon":113.0175306},{"lat":25.8370221,"lon":113.0356703},{"lat":25.8599991,"lon":113.0798104},{"lat":25.8659288,"lon":113.1244007},{"lat":25.8846712,"lon":113.1537367},{"lat":25.9355032,"lon":113.2026933},{"lat":25.9755034,"lon":113.2394378}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":26.8917494,"lon":112.5733456},{"lat":26.8359179,"lon":112.8093951},{"lat":26.7950123,"lon":113.0893181},{"lat":26.7877936,"lon":113.1695253},{"lat":26.8130639,"lon":113.3418521},{"lat":26.8212166,"lon":113.4356084},{"lat":26.7947203,"lon":113.488601},{"lat":26.7580331,"lon":113.4987919},{"lat":26.7519185,"lon":113.5538228},{"lat":26.6133223,"lon":113.5721664},{"lat":26.5195661,"lon":113.6536936},{"lat":26.4919454,"lon":113.7774362}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":29.5311975,"lon":112.5402672},{"lat":29.4739394,"lon":112.5434517},{"lat":29.3594657,"lon":112.3967721},{"lat":29.3751573,"lon":112.2799533},{"lat":29.4114535,"lon":112.1718757}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.5659359,"lon":109.9943755},{"lat":27.6600237,"lon":109.9218646},{"lat":27.780701,"lon":109.8623095},{"lat":27.8587861,"lon":109.8189665},{"lat":27.8940429,"lon":109.6813112},{"lat":27.947898,"lon":109.6002052},{"lat":28.1273428,"lon":109.6011517},{"lat":28.1988601,"lon":109.6333345},{"lat":28.2489222,"lon":109.672669},{"lat":28.2954084,"lon":109.7280949},{"lat":28.306136,"lon":109.619031},{"lat":28.3526223,"lon":109.5528775},{"lat":28.438443,"lon":109.5028154},{"lat":28.5421431,"lon":109.4724205},{"lat":28.5711749,"lon":109.4844816}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.5713107,"lon":109.4844821},{"lat":28.6415058,"lon":109.5709392},{"lat":28.6836801,"lon":109.6358228},{"lat":28.7031452,"lon":109.6542065},{"lat":28.7831683,"lon":109.7180087},{"lat":28.8642728,"lon":109.7893806},{"lat":28.9388889,"lon":109.826148},{"lat":28.9962028,"lon":109.8434503}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.6917357,"lon":111.6647448},{"lat":27.7264069,"lon":111.3266454}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":29.474204,"lon":109.4297241},{"lat":28.5711381,"lon":109.4844694}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.8586647,"lon":109.8189907},{"lat":27.8778551,"lon":109.9315742},{"lat":27.8893693,"lon":110.0855235},{"lat":27.8991777,"lon":110.1567411},{"lat":27.890687,"lon":110.2342259},{"lat":27.873264,"lon":110.2827073},{"lat":27.8528109,"lon":110.3622471},{"lat":27.8611437,"lon":110.4364842},{"lat":27.8755366,"lon":110.4993585},{"lat":27.9058375,"lon":110.5614753},{"lat":27.9074118,"lon":110.594428}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.7208239,"lon":113.1458501},{"lat":28.7186549,"lon":113.1442929},{"lat":28.7154014,"lon":113.1443207},{"lat":28.7127875,"lon":113.1440148},{"lat":28.7105073,"lon":113.1417624},{"lat":28.7102292,"lon":113.1362565},{"lat":28.7122036,"lon":113.1325859},{"lat":28.7123148,"lon":113.1273581},{"lat":28.7101458,"lon":113.1240768},{"lat":28.7095758,"lon":113.1196453},{"lat":28.7089381,"lon":113.1186151},{"lat":28.7057004,"lon":113.1166038},{"lat":28.7055041,"lon":113.1139057},{"lat":28.7021683,"lon":113.1063019},{"lat":28.6966249,"lon":113.1033095},{"lat":28.689757,"lon":113.0966378},{"lat":28.6883344,"lon":113.0955586},{"lat":28.6810319,"lon":113.0924274},{"lat":28.6770491,"lon":113.0840636},{"lat":28.6745267,"lon":113.0758326},{"lat":28.6714733,"lon":113.0743722},{"lat":28.6684198,"lon":113.0710533},{"lat":28.6688181,"lon":113.0637516},{"lat":28.6651009,"lon":113.059636},{"lat":28.6640388,"lon":113.0529981},{"lat":28.6627112,"lon":113.0496791},{"lat":28.6613836,"lon":113.0464929},{"lat":28.6632422,"lon":113.0451653},{"lat":28.6657647,"lon":113.0450326},{"lat":28.6653664,"lon":113.0373326},{"lat":28.6661629,"lon":113.0284378},{"lat":28.6690836,"lon":113.0248533},{"lat":28.674925,"lon":113.0208705},{"lat":28.6759871,"lon":113.0187464},{"lat":28.675456,"lon":113.0135688},{"lat":28.6762526,"lon":113.0102498},{"lat":28.6778457,"lon":113.008524},{"lat":28.678244,"lon":112.994186},{"lat":28.6762526,"lon":112.9886102},{"lat":28.6759871,"lon":112.986486},{"lat":28.6750578,"lon":112.9854239},{"lat":28.675456,"lon":112.9822377},{"lat":28.6744663,"lon":112.9778787},{"lat":28.6755812,"lon":112.9703925},{"lat":28.6765369,"lon":112.9616321},{"lat":28.674307,"lon":112.9519161},{"lat":28.6735106,"lon":112.9422},{"lat":28.6733513,"lon":112.9394923},{"lat":28.6751034,"lon":112.9367845},{"lat":28.6747848,"lon":112.9332804},{"lat":28.6757405,"lon":112.932484},{"lat":28.6784483,"lon":112.9321654},{"lat":28.6824303,"lon":112.9328025},{"lat":28.6846602,"lon":112.9348732},{"lat":28.6864123,"lon":112.9372624},{"lat":28.6894386,"lon":112.9404479},{"lat":28.6929427,"lon":112.9407665},{"lat":28.6956505,"lon":112.9412443},{"lat":28.7021809,"lon":112.9455449},{"lat":28.713012,"lon":112.9409258},{"lat":28.7166754,"lon":112.938218},{"lat":28.7249579,"lon":112.9383773},{"lat":28.727825,"lon":112.939333},{"lat":28.7381781,"lon":112.9383773},{"lat":28.7394524,"lon":112.939333},{"lat":28.7424787,"lon":112.9386959},{"lat":28.7456643,"lon":112.9414036},{"lat":28.7501241,"lon":112.9429964},{"lat":28.7541061,"lon":112.9428371},{"lat":28.7612737,"lon":112.9428371},{"lat":28.7647778,"lon":112.9431557},{"lat":28.7738568,"lon":112.9423593},{"lat":28.7772017,"lon":112.9422},{"lat":28.7829357,"lon":112.943315},{"lat":28.7865992,"lon":112.9407665},{"lat":28.7915368,"lon":112.9410851},{"lat":28.7944039,"lon":112.9429964},{"lat":28.7987056,"lon":112.9412201},{"lat":28.8031628,"lon":112.9404449},{"lat":28.810333,"lon":112.9402511},{"lat":28.8120771,"lon":112.9383132},{"lat":28.817697,"lon":112.9418014},{"lat":28.8211853,"lon":112.9406387},{"lat":28.8310686,"lon":112.9315305},{"lat":28.8337816,"lon":112.9299802},{"lat":28.8378512,"lon":112.9293989},{"lat":28.838045,"lon":112.9257168}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.7207942,"lon":113.146},{"lat":28.7841035,"lon":113.287},{"lat":28.7690757,"lon":113.428},{"lat":28.7087829,"lon":113.549},{"lat":28.7022512,"lon":113.582}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.2379509,"lon":111.4679828},{"lat":26.4202536,"lon":111.6141453}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.2378745,"lon":111.4680014},{"lat":27.2264401,"lon":111.2972021},{"lat":27.1571643,"lon":111.1444157},{"lat":27.1144398,"lon":111.0366586},{"lat":27.0250772,"lon":110.9741838},{"lat":26.9048726,"lon":110.9227806},{"lat":26.7467086,"lon":110.6689274},{"lat":26.6764068,"lon":110.662642},{"lat":26.5289071,"lon":110.7651894},{"lat":26.4670977,"lon":110.8382369},{"lat":26.435989,"lon":110.8568615}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.8290745,"lon":112.9509179},{"lat":27.5174534,"lon":112.8440374},{"lat":27.2363043,"lon":112.7456352},{"lat":26.8918966,"lon":112.5734314}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.8287052,"lon":112.9513315},{"lat":27.8314749,"lon":113.1661794},{"lat":27.7535282,"lon":113.3311731},{"lat":27.6470516,"lon":113.4969287}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.5543173,"lon":112.3544877},{"lat":28.5387812,"lon":112.2157726},{"lat":28.5185024,"lon":112.1567797},{"lat":28.5197531,"lon":112.0188106},{"lat":28.4734454,"lon":111.971595},{"lat":28.4471136,"lon":111.7745605},{"lat":28.4222895,"lon":111.6561065},{"lat":28.370709,"lon":111.5013651},{"lat":28.3735938,"lon":111.2131714}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":26.4201437,"lon":111.6141422},{"lat":26.2198997,"lon":111.6032034},{"lat":26.1048469,"lon":111.6098411},{"lat":25.9612201,"lon":111.6579696},{"lat":25.8750741,"lon":111.6171509},{"lat":25.7740527,"lon":111.6034025},{"lat":25.6666462,"lon":111.584476},{"lat":25.5579129,"lon":111.5812463},{"lat":25.5260406,"lon":111.599761}]},{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":29.031982,"lon":111.7015498},{"lat":28.943539,"lon":111.463676},{"lat":29.450623,"lon":111.620627},{"lat":29.574483,"lon":111.42996},{"lat":29.629382,"lon":111.764226},{"lat":29.63645,"lon":111.8608},{"lat":29.395004,"lon":112.17405}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":5,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Network background
The Hunan Natural Gas Pipeline Network consists of operating, in-construction and proposed pipelines. The most recent network developments are expanded upon in the "Hunan Province Natural Gas Transport Pipeline Network 3-Year Construction Action Plan (2020-2022)" 湖南省天然气输气管网建设三年行动计 (2020—2022年). By 2022, the network will reach approximately 3,900 kilometers, and provide natural gas to 14 of Hunan's largest cities.
The network investment totals approximately 6.027 billion RMB. Investors in the network include Hunan Province Natural Gas Network Company, with about 2.4 billion RMB and 332 million RMB from Xiangtou Natural Gas Investment Company.[1][2]
The Great Western Hunan Gas Pipeline received an investment of 583.5 million RMB from Hunan Province Natural Gas Network Company. This sub-network sources natural gas from the Sinopec's Southeastern Sichuan Basin (川东南地区气田)[3]
Network details
Changsha–Changde Gas Pipeline 长沙-常德输气管线
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":28.5549043,"lon":112.353296,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.2275472,"lon":112.9372648},{"lat":28.4708924,"lon":112.7875881},{"lat":28.4905407,"lon":112.5750012},{"lat":28.5549043,"lon":112.353296},{"lat":28.6447196,"lon":112.2333433},{"lat":28.7046157,"lon":112.1164831},{"lat":28.9996495,"lon":111.7487013},{"lat":29.031982,"lon":111.7015498}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
The gas source for this line is the Qiangxiang Branch line of the Chungmu Line and passes through Tongguan, Wangcheng, Yiyang, Deshan and terminates in Changde in Hunan Province, China.[4]
- Operator: PetroChina Company Limited (中国石油天然气股份有限公司)[4][5]
- Owner: China National Petroleum Corporation (中国石油天然气集团有限公司)[5]
- Parent company:
- Capacity: .0.64 bcm/year [4]
- Length: 188 km[4]
- Diameter: 406.4 mm[4]
- Status: Operating[6]
- Start year: 2006[6]
- Cost: 482 million RMB[6]
Xiangtan–Hengyang Gas Pipeline 湘潭-衡阳输气管线
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":27.5174534,"lon":112.8440374,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.8290745,"lon":112.9509179},{"lat":27.5174534,"lon":112.8440374},{"lat":27.2363043,"lon":112.7456352},{"lat":26.8918966,"lon":112.5734314}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
This gas pipeline passes through Xiangtan county, Hengshan county, Hengyang county, and Nanyue and Dangu districts of Hengyang city in Hunan Province, China.[4]
- Operator: Zhongyou Jinhong Natural Gas Conveyor Co., Ltd. ( 中油金鸿天然气输送有限公司)[7][4]
- Owner: Jinhong Holding Group Co., Ltd.(金鸿控股集团股份有限公司)[7]
- Parent company:
- Capacity: .0.5 bcm/year[4]
- Length: 138 km[4]
- Diameter: 457 mm[4]
- Status: Operating[4]
- Start year: 2007[4]
- Cost:
Xiangtan–Liling Gas Pipeline 湘潭-醴陵输气管线
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":27.8314749,"lon":113.1661794,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.8287052,"lon":112.9513315},{"lat":27.8314749,"lon":113.1661794},{"lat":27.7535282,"lon":113.3311731},{"lat":27.6470516,"lon":113.4969287}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: China City Natural Gas Co., Limited. (中油中泰燃气投资集团有限公司)[4][8]
- Owner: Kunlun Energy Co., Ltd. 昆仑能源有限公司 (49%); Zhongda Industrial Group Inc. 中大工业集团有限公司 (26%); Alta Financial Holdings, Ltd. 恒泰金融集团有限公司 (25%)[4][8]
- Parent company:
- Capacity: .0.8 bcm/year [4]
- Length: 67 km[4]
- Diameter: 355.6 mm[4]
- Status: Operating[4]
- Start year: 2006[4]
- Cost:
Xiangtan–Loudi–Shaoyang Gas Pipeline 湘潭-娄底-邵阳输气支干线
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":27.7025675,"lon":111.991829,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.8287341,"lon":112.9510288},{"lat":27.8401889,"lon":112.6553923},{"lat":27.7974727,"lon":112.2798634},{"lat":27.7025675,"lon":111.9918292},{"lat":27.6917245,"lon":111.6647445},{"lat":27.6536865,"lon":111.6456404},{"lat":27.41001,"lon":111.481717},{"lat":27.2380123,"lon":111.4679411}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan PetroChina Kunlun Xiangloushao Natural Gas Transmission and Distribution Co., Ltd.(湖南中石油昆仑湘娄邵天然气输配有限公司)[4][9]
- Owner: Hunan Natural Gas Co., Ltd. (湖南省天然气有限公司40%), Hunan Huinatural Guotai Energy Co., Ltd. (湖南惠天然国泰能源有限公司30%), Century Golden Resources Investment Group Co., Ltd. (世纪金源投资集团有限公司 20%),Hunan Aote Energy Co., Ltd. (湖南澳特能源有限公司10%)[9]
- Parent company:
- Capacity: 2 bcm/year[4]
- Length: 213 km[4]
- Diameter: 508 mm[4]
- Status: Operating[4]
- Start year: 2012[4]
- Cost:
Changde Five Counties and One City Gas Pipeline 常德五县一市输气支线
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":29.574483,"lon":111.42996,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":29.031982,"lon":111.7015498},{"lat":28.943539,"lon":111.463676},{"lat":29.450623,"lon":111.620627},{"lat":29.574483,"lon":111.42996},{"lat":29.629382,"lon":111.764226},{"lat":29.63645,"lon":111.8608},{"lat":29.395004,"lon":112.17405}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Xianggan Three Gorges Gas Investment Co., Ltd.(湖南湘赣三峡燃气投资有限公司)[10][11]
- Owner: Fengjie County Sanxiafeng Natural Gas Co., Ltd. (奉节县三峡风天然气有限责任公司)[10]
- Parent company:
- Capacity: 0.442 billion cubic meters per year[11]
- Length: 245.9 km[11]
- Diameter:
- Status: Operating[11]
- Start year: 2015[11]
- Cost: .480 billion RMB[11]
Yongzhou–Shaoyang Gas Pipeline 永州-邵阳输气管线
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":25.8750741,"lon":111.6171509,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":26.4201437,"lon":111.6141422},{"lat":26.2198997,"lon":111.6032034},{"lat":26.1048469,"lon":111.6098411},{"lat":25.9612201,"lon":111.6579696},{"lat":25.8750741,"lon":111.6171509},{"lat":25.7740527,"lon":111.6034025},{"lat":25.6666462,"lon":111.584476},{"lat":25.5579129,"lon":111.5812463},{"lat":25.5260406,"lon":111.599761}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12][13]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.372 billion cubic meters per year[13]
- Length: 120 km[13]
- Diameter: 406.4 mm[13]
- Status: Construction[13]
- Start year:
- Cost: 490 million RMB[13]
Shaoyang–Dongkou–Xinning Gas Pipeline 邵阳-洞口-新宁输气管道
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":27.0250772,"lon":110.9741838,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.2378745,"lon":111.4680014},{"lat":27.2264401,"lon":111.2972021},{"lat":27.1571643,"lon":111.1444157},{"lat":27.1144398,"lon":111.0366586},{"lat":27.0250772,"lon":110.9741838},{"lat":26.9048726,"lon":110.9227806},{"lat":26.7467086,"lon":110.6689274},{"lat":26.6764068,"lon":110.662642},{"lat":26.5289071,"lon":110.7651894},{"lat":26.4670977,"lon":110.8382369},{"lat":26.435989,"lon":110.8568615}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.445 billion cubic meters per year[14]
- Length: 207.2 km[14]
- Diameter: 350mm[14]
- Status: Construction[15]
- Start year:
- Cost: 769 million RMB[14]
Hengyang–Yanling Pipeline (phase 1)衡阳-炎陵天然气支线管道(一期)
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":26.7947203,"lon":113.488601,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":26.8917494,"lon":112.5733456},{"lat":26.8359179,"lon":112.8093951},{"lat":26.7950123,"lon":113.0893181},{"lat":26.7877936,"lon":113.1695253},{"lat":26.8130639,"lon":113.3418521},{"lat":26.8212166,"lon":113.4356084},{"lat":26.7947203,"lon":113.488601},{"lat":26.7580331,"lon":113.4987919},{"lat":26.7519185,"lon":113.5538228},{"lat":26.6133223,"lon":113.5721664},{"lat":26.5195661,"lon":113.6536936},{"lat":26.4919454,"lon":113.7774362}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.41 bcm/year[16]
- Length: 161 km[16]
- Diameter: 273.1 mm/219.1mm[16]
- Status: Operating[17]
- Start year: 2022[17]
- Cost: 643 million RMB[16]
Hengyang–Yanling Pipeline(phase 2)衡阳-炎陵天然气支线管道(二期)
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":false,"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity:
- Length: 65 km[18]
- Diameter:
- Status: Proposed
- Start year:
- Cost:
Changsha–Liuyang Gas Pipeline 长沙-浏阳输气管道
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":28.1563316,"lon":113.380604,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.2272411,"lon":112.937571},{"lat":28.2427744,"lon":113.1086935},{"lat":28.2357027,"lon":113.2259351},{"lat":28.1563316,"lon":113.3806041},{"lat":28.1138597,"lon":113.4723047},{"lat":28.1109639,"lon":113.5977898},{"lat":28.1635835,"lon":113.6425789}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12][19]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.26 billion cubic meters per year[19][20]
- Length: 62.4 km[19][20]
- Diameter: 350 mm[4]
- Status: Operating[19]
- Start year: 2017[19]
- Cost: .299 billion RMB[19]
Lianyuan–Xinhua Gas Pipeline 涟源-新化输气管道
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":27.7,"lon":111.5,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.6917357,"lon":111.6647448},{"lat":27.7264069,"lon":111.3266454}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12][21]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.38 billion cubic meters per year[21]
- Length: 62.8 kilometers[21]
- Diameter: 300 mm[21]
- Status: Operating[22]
- Start year: 2017[22]
- Cost: 253 million RMB[21]
The pipeline was initially scheduled to operate in 2016, though no direct information about this could be found. As of 2017, it was confirmed to be operating.[23]
Miluo–Xiangyin–Quyuan Gas Pipeline 汨罗-湘阴-屈原输气管道
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":28.6273527,"lon":112.9083129,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.7208239,"lon":113.1458501},{"lat":28.7186549,"lon":113.1442929},{"lat":28.7154014,"lon":113.1443207},{"lat":28.7127875,"lon":113.1440148},{"lat":28.7105073,"lon":113.1417624},{"lat":28.7102292,"lon":113.1362565},{"lat":28.7122036,"lon":113.1325859},{"lat":28.7123148,"lon":113.1273581},{"lat":28.7101458,"lon":113.1240768},{"lat":28.7095758,"lon":113.1196453},{"lat":28.7089381,"lon":113.1186151},{"lat":28.7057004,"lon":113.1166038},{"lat":28.7055041,"lon":113.1139057},{"lat":28.7021683,"lon":113.1063019},{"lat":28.6966249,"lon":113.1033095},{"lat":28.689757,"lon":113.0966378},{"lat":28.6883344,"lon":113.0955586},{"lat":28.6810319,"lon":113.0924274},{"lat":28.6770491,"lon":113.0840636},{"lat":28.6745267,"lon":113.0758326},{"lat":28.6714733,"lon":113.0743722},{"lat":28.6684198,"lon":113.0710533},{"lat":28.6688181,"lon":113.0637516},{"lat":28.6651009,"lon":113.059636},{"lat":28.6640388,"lon":113.0529981},{"lat":28.6627112,"lon":113.0496791},{"lat":28.6613836,"lon":113.0464929},{"lat":28.6632422,"lon":113.0451653},{"lat":28.6657647,"lon":113.0450326},{"lat":28.6653664,"lon":113.0373326},{"lat":28.6661629,"lon":113.0284378},{"lat":28.6690836,"lon":113.0248533},{"lat":28.674925,"lon":113.0208705},{"lat":28.6759871,"lon":113.0187464},{"lat":28.675456,"lon":113.0135688},{"lat":28.6762526,"lon":113.0102498},{"lat":28.6778457,"lon":113.008524},{"lat":28.678244,"lon":112.994186},{"lat":28.6762526,"lon":112.9886102},{"lat":28.6759871,"lon":112.986486},{"lat":28.6750578,"lon":112.9854239},{"lat":28.675456,"lon":112.9822377},{"lat":28.6744663,"lon":112.9778787},{"lat":28.6755812,"lon":112.9703925},{"lat":28.6765369,"lon":112.9616321},{"lat":28.674307,"lon":112.9519161},{"lat":28.6735106,"lon":112.9422},{"lat":28.6733513,"lon":112.9394923},{"lat":28.6751034,"lon":112.9367845},{"lat":28.6747848,"lon":112.9332804},{"lat":28.6757405,"lon":112.932484},{"lat":28.6784483,"lon":112.9321654},{"lat":28.6824303,"lon":112.9328025},{"lat":28.6846602,"lon":112.9348732},{"lat":28.6864123,"lon":112.9372624},{"lat":28.6894386,"lon":112.9404479},{"lat":28.6929427,"lon":112.9407665},{"lat":28.6956505,"lon":112.9412443},{"lat":28.7021809,"lon":112.9455449},{"lat":28.713012,"lon":112.9409258},{"lat":28.7166754,"lon":112.938218},{"lat":28.7249579,"lon":112.9383773},{"lat":28.727825,"lon":112.939333},{"lat":28.7381781,"lon":112.9383773},{"lat":28.7394524,"lon":112.939333},{"lat":28.7424787,"lon":112.9386959},{"lat":28.7456643,"lon":112.9414036},{"lat":28.7501241,"lon":112.9429964},{"lat":28.7541061,"lon":112.9428371},{"lat":28.7612737,"lon":112.9428371},{"lat":28.7647778,"lon":112.9431557},{"lat":28.7738568,"lon":112.9423593},{"lat":28.7772017,"lon":112.9422},{"lat":28.7829357,"lon":112.943315},{"lat":28.7865992,"lon":112.9407665},{"lat":28.7915368,"lon":112.9410851},{"lat":28.7944039,"lon":112.9429964},{"lat":28.7987056,"lon":112.9412201},{"lat":28.8031628,"lon":112.9404449},{"lat":28.810333,"lon":112.9402511},{"lat":28.8120771,"lon":112.9383132},{"lat":28.817697,"lon":112.9418014},{"lat":28.8211853,"lon":112.9406387},{"lat":28.8310686,"lon":112.9315305},{"lat":28.8337816,"lon":112.9299802},{"lat":28.8378512,"lon":112.9293989},{"lat":28.838045,"lon":112.9257168}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":9,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12][24]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Owner:
- Parent company:
- Capacity: 0.19 billion cubic meters per year[24]
- Length: 48 km[24]
- Diameter: 273.1mm/168.3mm[25]
- Status: Operating[26]
- Start year: 2019[26]
- Cost: 171 million RMB[27]
Miluo–Pingjiang Gas Pipeline 汨罗-平江输气管道
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":28.7087829,"lon":113.5490575,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.7207942,"lon":113.146},{"lat":28.7841035,"lon":113.287},{"lat":28.7690757,"lon":113.428},{"lat":28.7087829,"lon":113.549},{"lat":28.7022512,"lon":113.582}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12][28]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.15 billion cubic meters per year[29]
- Length: 50.25 km[28]
- Diameter: 219.1 mm[28]
- Status: Operating[29]
- Start year: 2019[29]
- Cost: 166 million RMB[28]
Guiyang–Chenzhou–Zixing Gas Pipeline 桂阳-郴州-资兴输气管道
Map of Guiyang-Chenzhou-Zixiang Gas Pipeline
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":25.773533,"lon":113.0175306,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":25.752491,"lon":112.7334454},{"lat":25.768957,"lon":112.828596},{"lat":25.7747423,"lon":112.8766452},{"lat":25.7819982,"lon":112.9262272},{"lat":25.7826029,"lon":112.9679486},{"lat":25.773533,"lon":113.0175306},{"lat":25.8370221,"lon":113.0356703},{"lat":25.8599991,"lon":113.0798104},{"lat":25.8659288,"lon":113.1244007},{"lat":25.8846712,"lon":113.1537367},{"lat":25.9355032,"lon":113.2026933},{"lat":25.9755034,"lon":113.2394378}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12][30]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.9 billion cubic meters per year[31]
- Length: 83 km[31]
- Diameter: 406.4 mm[31]
- Status: Operating[30]
- Start year: 2020[30]
- Cost: 405 million RMB[32]
Huarong–Nan County–Anxiang Gas Pipeline 华容-南县-安乡输气管道
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":29.3594657,"lon":112.3967721,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":29.5311975,"lon":112.5402672},{"lat":29.4739394,"lon":112.5434517},{"lat":29.3594657,"lon":112.3967721},{"lat":29.3751573,"lon":112.2799533},{"lat":29.395004,"lon":112.17405}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12][33]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.60 billion cubic meters per year[33]
- Length: 62.77 km[33]
- Diameter: 400 mm[34]
- Status: Operating[34]
- Start year: 2017[34]
- Cost: 240 million RMB[35]
Changsha–Yiyang Gas Pipeline 长沙-益阳输气管线
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":28.4698675,"lon":112.7870107,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.2273679,"lon":112.9373878},{"lat":28.4698675,"lon":112.7870107},{"lat":28.4896435,"lon":112.5760666},{"lat":28.5541621,"lon":112.3547804}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12][36]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 1.16 billion cubic meters per year[37]
- Length: 78.7 kilometers[38]
- Diameter: 457 mm[37]
- Status: Operating[36]
- Start year: 2020[36]
- Cost:
Greater Western Hunan Gas Pipeline (Huayuan–Zhangjiajie) 大湘西输气管线 (花垣-张家界段)
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":28.7031452,"lon":109.654206,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.5713107,"lon":109.4844821},{"lat":28.6415058,"lon":109.5709392},{"lat":28.6836801,"lon":109.6358228},{"lat":28.7031452,"lon":109.6542065},{"lat":28.7831683,"lon":109.7180087},{"lat":28.8642728,"lon":109.7893806},{"lat":28.9388889,"lon":109.826148},{"lat":28.9962028,"lon":109.8434503}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Daxiangxi Natural Gas Pipeline Network Investment and Development Co., Ltd.(湖南省大湘西天然气管网投资开发有限公司)[39][40]
- Owner: Hunan Natural Gas Pipeline Network Co.,Ltd.(65%) (湖南省天然气管网有限公司), Chongqing Xianglong Natural Gas Co., Ltd.(35%) (重庆祥龙天然气有限公司)[39]
- Parent company:
- Capacity: 0.22 billion cubic meters per year[40]
- Length: 132.45 km[40]
- Diameter: 300 mm[41]
- Status: Operating[40]
- Start year: 2022[40]
- Cost: 669 million RMB[41]
Greater Western Hunan Gas Pipeline (Huayuan–Huaihua) 大湘西输气管线 (花垣-怀化段)
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":28.1273428,"lon":109.6011517,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.5659359,"lon":109.9943755},{"lat":27.6600237,"lon":109.9218646},{"lat":27.780701,"lon":109.8623095},{"lat":27.8587861,"lon":109.8189665},{"lat":27.8940429,"lon":109.6813112},{"lat":27.947898,"lon":109.6002052},{"lat":28.1273428,"lon":109.6011517},{"lat":28.1988601,"lon":109.6333345},{"lat":28.2489222,"lon":109.672669},{"lat":28.2954084,"lon":109.7280949},{"lat":28.306136,"lon":109.619031},{"lat":28.3526223,"lon":109.5528775},{"lat":28.438443,"lon":109.5028154},{"lat":28.5421431,"lon":109.4724205},{"lat":28.5711749,"lon":109.4844816}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Daxiangxi Natural Gas Pipeline Network Investment and Development Co., Ltd.(湖南省大湘西天然气管网投资开发有限公司)[39][42]
- Owner: Hunan Natural Gas Pipeline Network Co.,Ltd.(65%) (湖南省天然气管网有限公司), Chongqing Xianglong Natural Gas Co., Ltd.(35%) (重庆祥龙天然气有限公司)[39]
- Parent company:
- Capacity: 0.95 bcm/year[43]
- Length: 171 km[44]
- Diameter: 400 mm[44]
- Status: Construction[45]
- Start year:
- Cost: 902 million RMB[44]
Greater Western Hunan Gas Pipeline (Fenghuang Border to Guizhou) 大湘西输气管线 (凤凰-湘黔界)
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":27.9007602,"lon":109.3333257,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.9477195,"lon":109.5998318},{"lat":27.9265568,"lon":109.4453799},{"lat":27.9007602,"lon":109.3333257},{"lat":27.8413372,"lon":109.2621258},{"lat":27.7328057,"lon":109.1897487}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Daxiangxi Natural Gas Pipeline Network Investment and Development Co., Ltd.(湖南省大湘西天然气管网投资开发有限公司)[39][46]
- Owner: Hunan Natural Gas Pipeline Network Co.,Ltd.(65%) (湖南省天然气管网有限公司), Chongqing Xianglong Natural Gas Co., Ltd.(35%) (重庆祥龙天然气有限公司)[39]
- Parent company:
- Capacity: 0.95 bcm/year[47]
- Length: 37 km[46]
- Diameter: 323.9 mm[46]
- Status: Construction[46]
- Start year:
- Cost: 121 million RMB[46]
Greater Western Hunan Gas Pipeline (Longshan–Huayuan) 大湘西输气管线 (龙山-花垣)
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":29,"lon":109.4,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":29.474204,"lon":109.4297241},{"lat":28.5711381,"lon":109.4844694}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Daxiangxi Natural Gas Pipeline Network Investment and Development Co., Ltd.(湖南省大湘西天然气管网投资开发有限公司)[39][48]
- Owner: Hunan Natural Gas Pipeline Network Co.,Ltd.(65%) (湖南省天然气管网有限公司), Chongqing Xianglong Natural Gas Co., Ltd.(35%) (重庆祥龙天然气有限公司)[39]
- Parent company:
- Capacity: 0.95 billion cubic meters per year[48]
- Length: 111 km[41]
- Diameter: 406.4 mm[41]
- Status: Operating[48]
- Start year: 2020[48]
- Cost: 452 million RMB[41]
Greater Western Hunan Gas Pipeline (Mayang–Chengxi–Xupu-Anhua) (Mayang–Chenxi Segment) 大湘西输气管线 (麻阳-辰溪-溆浦-安化) (麻阳-辰溪段)
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":27.873264,"lon":110.2827073,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":27.8586647,"lon":109.8189907},{"lat":27.8778551,"lon":109.9315742},{"lat":27.8893693,"lon":110.0855235},{"lat":27.8991777,"lon":110.1567411},{"lat":27.890687,"lon":110.2342259},{"lat":27.873264,"lon":110.2827073},{"lat":27.8528109,"lon":110.3622471},{"lat":27.8611437,"lon":110.4364842},{"lat":27.8755366,"lon":110.4993585},{"lat":27.9058375,"lon":110.5614753},{"lat":27.9074118,"lon":110.594428}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Daxiangxi Natural Gas Pipeline Network Investment and Development Co., Ltd.(湖南省大湘西天然气管网投资开发有限公司)[39]
- Owner: Hunan Natural Gas Pipeline Network Co.,Ltd.(65%) (湖南省天然气管网有限公司), Chongqing Xianglong Natural Gas Co., Ltd.(35%) (重庆祥龙天然气有限公司)[39]
- Parent company:
- Capacity: 0.13 billion cubic meters per year[41]
- Length: 50 km[41]
- Diameter: 300 mm[41]
- Status: Construction[49]
- Start year:
- Cost: 193 Million RMB[41]
Altogether, the Greater Western Hunan Gas Pipelines have a total capacity of 0.95 billion cubic meters per year, though individual capacities for each segment are tracked below.
Yongzhou–Shuangpai–Dao County Gas Pipeline 永州-双牌-道县输气管线
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":25.8750741,"lon":111.6171509,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":26.4201437,"lon":111.6141422},{"lat":26.2198997,"lon":111.6032034},{"lat":26.1048469,"lon":111.6098411},{"lat":25.9612201,"lon":111.6579696},{"lat":25.8750741,"lon":111.6171509},{"lat":25.7740527,"lon":111.6034025},{"lat":25.6666462,"lon":111.584476},{"lat":25.5579129,"lon":111.5812463},{"lat":25.5260406,"lon":111.599761}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.371 billion cubic meters per year[50]
- Length: 98 kilometers[50]
- Diameter:
- Status: Proposed[50]
- Start year:
- Cost:
Yiyang–Taojiang Gas Pipeline 益阳-桃江输气管道
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":28.4734454,"lon":111.971595,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":28.5543173,"lon":112.3544877},{"lat":28.5387812,"lon":112.2157726},{"lat":28.5185024,"lon":112.1567797},{"lat":28.5197531,"lon":112.0188106},{"lat":28.4734454,"lon":111.971595},{"lat":28.4471136,"lon":111.7745605},{"lat":28.4222895,"lon":111.6561065},{"lat":28.370709,"lon":111.5013651},{"lat":28.3735938,"lon":111.2131714}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.05 bcm/year[51]
- Length: 34.5 kilometers[51]
- Diameter:
- Status: Operating[51]
- Start year: 2010[51]
- Cost:
Guiyang-Linwu Gas Pipeline 桂阳-临武输气管道
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":false,"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[14][12]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.4239 billion cubic meters per year[14]
- Length: 60 kilometers[14]
- Diameter: 400mm( Guiyang-Heye), 250mm(Heye-Linwu)[14]
- Status: Construction[52]
- Start year:
- Cost: 245.27 million RMB[52]
Hengdong-Dapu Gas Pipeline 衡东-大浦天然气支线管道
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":false,"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Daxiangxi Natural Gas Pipeline Network Investment and Development Co., Ltd.(湖南省大湘西天然气管网投资开发有限公司)[39][53]
- Owner: Hunan Natural Gas Pipeline Network Co.,Ltd.(65%) (湖南省天然气管网有限公司), Chongqing Xianglong Natural Gas Co., Ltd.(35%) (重庆祥龙天然气有限公司)[39]
- Parent company:
- Capacity: 0.162 billion cubic meters per year[53]
- Length: 20 kilometers[53]
- Diameter: 273mm[53]
- Status: Operating[53]
- Start year: 2022[53]
- Cost: 125 million RMB[53]
Huaihua-Zhijiang-Zhongfang-Hongjiang Gas Pipeline 怀化-芷江-中方-洪江输气管道
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":false,"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity:
- Length:
- Diameter:
- Status: Proposed
- Start year:
- Cost:
Shaodong-Shuangfeng Gas Pipeline 邵东-双峰输气管道支干线
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":false,"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[14][12]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.159 billion cubic meters per year[14]
- Length: 64.2 kilometers[14]
- Diameter: 200mm[14]
- Status: Operating[54]
- Start year: 2022[54]
- Cost: 263 million RMB[14]
Tuqiao-Yongxing, Anren-Yongxing Gas Pipeline 土桥-永兴,安仁-永兴天然气支线管道
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":false,"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12][55]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.2 billion cubic meters per year[55]
- Length: 134.7 kilometers[55]
- Diameter: 273.1mm[55]
- Status: Proposed[55]
- Start year:
- Cost: 395.9248 million RMB[55]
Yuelin Gas Pipeline(Yueyang-Linxiang) 岳临天然气支线管道(岳阳-临湘)
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":false,"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[12][56]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity: 0.35 billion cubic meters per year[56]
- Length: 36.3kilometers[56]
- Diameter: 273.1mm[57]
- Status: Operating[56]
- Start year: 2021[56]
- Cost: 186 million RMB[56]
Zhuzhou-Ningxiang Gas Pipeline 新粤浙株洲-宁乡输气管道支干线
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":false,"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Hunan Natural Gas Pipeline Network Co., Ltd. (湖南省天然气管网有限公司)[1][12]
- Owner: Hunan Xiangtou Holding Group Co., Ltd.(55%) (湖南湘投控股集团有限公司), National Petroleum and Natural Gas Pipeline Network Group Co., Ltd.(45%)(国家石油天然气管网集团有限公司)[12]
- Parent company:
- Capacity:
- Length: 168 kilometers[1]
- Diameter:
- Status: Proposed
- Start year:
- Cost: 672 million RMB[1]
Articles and resources
References
Related GEM.wiki articles
External resources
External articles