Huojitu Well of Daliuta Coal Mine

From Global Energy Monitor

Huojitu Well of Daliuta Coal Mine (中国神华能源股份有限公司大柳塔煤矿活鸡兔井) is part of the Shenhua Daliuta coal mine located in Zhongji Town, Shenmu City, Shaanxi Province, China, with a production capacity of 15 million tons per year.

Location

The undated satellite photo below shows the coal mine located in Zhongji Town, Shenmu City, Shaanxi Province, China.

Loading map...

Coal Mine Background

Huojitu Well of Daliuta Coal Mine is operated by China Shenhua Energy Co., Ltd. Daliuta Coal Mine is a large modern coal mine owned by Shendong Coal Group. It is the earliest underground mine built by Shendong Coal Group. It consists of Daliuta well and Huojitu Well. The production capacity of Daliuta well is 18 million tons/year and the production capacity of Huojitu is 15 million/year.[1] Huojitu Coal Mine started in October 1994 and was put into production on November 17, 2000.[2]

Project Details

  • Sponsor: China Shenhua Energy Co., Ltd.
  • Parent Company: National Energy Investment Group(69.45%), HKSCC NOMINEES LIMITED(17.05%), Others(13.5%)
  • Location: Zhongji Town, Shenmu City, Shaanxi Province, China.
  • GPS Coordinates: 39.259312,110.224368(exact)
  • Status: Operating
  • Production Capacity: 15Mt/a[1]
  • Total Resource: 950Mt[3]
  • Minable Reserves: 624Mt[1]
  • Coal Type: bituminous(long flame coal,non-caking coal)
  • Mine Size: 63.784k㎡[3]
  • Mine Type: Underground
  • Start Year:2000[3]
  • Total Investment: RMB 1882 Million


Articles and resources

References

  1. 1.0 1.1 1.2 "中国煤矿大起底:十大井工矿,神华坐拥6座!"中国煤炭网, March 20, 2017
  2. "中国神华集团神东公司大柳塔矿综合自动化系统应用案例"西安华光信息技术有限责任公司, Accessed November 2020
  3. 3.0 3.1 3.2 "神华神东煤炭集团大柳塔煤矿活鸡兔井"道客巴巴网, June 04, 2013

Related SourceWatch articles