Huyanghe Jinyan power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Huyanghe Jinyan power station (胡杨河市锦焱热电) is an operating power station of at least 160-megawatts (MW) in Huyanghe, Ili, Xinjiang, China with multiple units, some of which are not currently operating. It is also known as 胡杨河市锦焱热力公司400兆瓦背压供热项目.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Huyanghe Jinyan power station | Huyanghe, Ili, Xinjiang, China | 44.790264, 84.868076 (approximate)[1] |
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
|---|---|---|---|---|---|---|
| Unit 1 | Operating[2][3] | coal: unknown[1] | 160[4] | unknown | yes[2] | 2025[3] |
| Unit 2 | Construction[2] | coal: unknown[1] | 160[1] | unknown | yes[1] | – |
| Unit 3 | Construction[2] | coal: unknown[4] | 40[4] | unknown | yes[4] | – |
| Unit 4 | Construction[2] | coal: unknown[4] | 40[4] | unknown | yes[4] | – |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Huyanghe Jinyan Thermal Power Co Ltd [100%][1] | Xinjiang Production & Construction Corps Seventh Agricultural Division State-Own Ed Assets [68.8%]; Xinjiang Production and Construction Corps Electric Power Group Co Ltd [26.8%]; unknown [4.5%] |
| Unit 2 | Huyanghe Jinyan Thermal Power Co Ltd [100%][1] | Xinjiang Production & Construction Corps Seventh Agricultural Division State-Own Ed Assets [68.8%]; Xinjiang Production and Construction Corps Electric Power Group Co Ltd [26.8%]; unknown [4.5%] |
| Unit 3 | Huyanghe Jinyan Thermal Power Co Ltd [100%][1] | Xinjiang Production & Construction Corps Seventh Agricultural Division State-Own Ed Assets [68.8%]; Xinjiang Production and Construction Corps Electric Power Group Co Ltd [26.8%]; unknown [4.5%] |
| Unit 4 | Huyanghe Jinyan Thermal Power Co Ltd [100%][1] | Xinjiang Production & Construction Corps Seventh Agricultural Division State-Own Ed Assets [68.8%]; Xinjiang Production and Construction Corps Electric Power Group Co Ltd [26.8%]; unknown [4.5%] |
Project-level coal details
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The planned 400 MW cogen power station would allegedly consist of 2 X 40 MW units and 2 x 160 MW units. [5] The project was permitted in September 2022.[6]
In December 2022, the project reportedly selected Energy China Hunan Research Institute as the winning bidder to conduct a feasibility study and survey for the proposed project.[7]
Construction began in March 2023.[8]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 "兵团生态环境局--通知、公示、公告--2023年9月22日胡杨河市锦焱热力有限公司320MW背压供热项目环境影响评价文件拟进行审查公示". sthjj.xjbt.gov.cn. 2023-09-22. Archived from the original on 2024-01-25. Retrieved 2023-11-24.
- ↑ 2.0 2.1 2.2 2.3 2.4 "胡杨河市锦焱热力有限公司400MW背压供热项目开工". www.xj.xinhuanet.com. 2023-03-30. Archived from the original on 2024-01-25. Retrieved 2023-11-24.
- ↑ 3.0 3.1 https://mp.weixin.qq.com/s/E0MqSIuLjgtjT7SwFfhvXw.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 "上海电气市场开拓和项目交付捷报频传-北极星火力发电网". news.bjx.com.cn. 2023-04-21. Archived from the original on 2024-01-25. Retrieved 2023-11-24.
- ↑ "中国能建湖南院中标胡杨河市锦焱热力有限公司400兆瓦背压供热项目可研及勘察设计". 中国能建. 2022-12-07. Retrieved 2023-02-06.
- ↑ 上海电气市场开拓和项目交付捷报频传, news.bjx.com, April 21, 2023
- ↑ 中国能建湖南院中标胡杨河市锦焱热力有限公司400兆瓦背压供热项目可研及勘察设计 China Energy Engineering Corporation, 2022-12-07
- ↑ 胡杨河市锦焱热力有限公司400MW背压供热项目开工, xj.xinhuanet.com, March 30, 2023
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.