Hyrasia One solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Hyrasia One solar farm is an announced solar photovoltaic (PV) farm in Karakiya District, Mangystau Region, Kazakhstan.

Project Details

Table 1: Phase-level project details for Hyrasia One solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner
Enbek Announced[1] 2030 (planned)[2] 1800 MW[3] PV[3] SVEVIND Energy GmbH [100%][4]
Kanagat Announced[1] 2030 (planned)[2] 4900 MW[3] PV[3] SVEVIND Energy GmbH [100%][4]
Rahym Announced[1] 2030 (planned)[2] 1600 MW[3] PV[3] SVEVIND Energy GmbH [100%][4]
Talap Announced[1] 2030 (planned)[2] 1300 MW[3] PV[3] SVEVIND Energy GmbH [100%][4]
Teren oi Announced[1] 2030 (planned)[2] 3500 MW[3] PV[3] SVEVIND Energy GmbH [100%][4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Hyrasia One solar farm

Phase Name Location Coordinates (WGS 84)
Enbek Karakiya District, Mangystau Region, Kazakhstan[3] 43.2460, 52.4636 (approximate)[3]
Kanagat Karakiya District, Mangystau Region, Kazakhstan[3] 42.3000, 54.9479 (approximate)[3]
Rahym Karakiya District, Mangystau Region, Kazakhstan[3] 43.3846, 55.2554 (approximate)[3]
Talap Karakiya District, Mangystau Region, Kazakhstan[3] 43.7365, 52.5770 (approximate)[3]
Teren oi Karakiya District, Mangystau Region, Kazakhstan[3] 42.4246, 53.0713 (approximate)[3]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 https://hyrasia.one/archive/23813209 https://hyrasia.one/the-project, https://hyrasia.one/archive/23813209. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 "Pre-FEED successfully started with first geological drillings". Archived from the original on 2024-06-12. Retrieved 2024-06-11. {{cite web}}: Text "Hyrasia One" ignored (help)
  3. ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 "The Project". Archived from the original on 2024-06-11. Retrieved 2024-06-11. {{cite web}}: Text "Hyrasia One" ignored (help)
  4. ↑ 4.0 4.1 4.2 4.3 4.4 "About Us". Archived from the original on 2024-06-11. Retrieved 2024-06-11. {{cite web}}: Text "Hyrasia One" ignored (help)