Inner Mongolia Abag Banner Wind/Hydrogen complex

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Inner Mongolia Abag Banner Wind/Hydrogen complex (锡林郭勒盟阿巴嘎旗500兆瓦风能光伏发电制氢项目) is a wind farm in pre-construction in Abag Banner, Xilingol League, Inner Mongolia, China.

Project Details

Table 1: Phase-level project details for Inner Mongolia Abag Banner Wind/Hydrogen complex

Status Nameplate capacity Type Owner
Pre-construction[1] 400 MW[1] Onshore[1] Beijing Jingneng Clean Energy and Power CO LTD (北京京能清洁能源电力股份有限公司)[2]

Location

Table 2: Phase-level location details for Inner Mongolia Abag Banner Wind/Hydrogen complex

Location Coordinates (WGS 84)
Abag Banner, Xilingol League, Inner Mongolia, China[2] 44.322, 114.684 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20240416033409/https://www.sohu.com/a/578059448_257552. Archived from the original on 16 April 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240207032213/https://news.bjx.com.cn/html/20211228/1196396.shtml. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)