Inner Mongolia Energy Baotou power station (蒙能集团包头喜桂图发电有限公司 2×660MW煤电项目, 内蒙古能源集团包头地区2×66万千瓦煤电项目) is a power station under construction in Jimaoyaozi Village, Xiguit District, Baotou, Inner Mongolia, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Inner Mongolia Energy Baotou power station Jimaoyaozi Village, Xiguit District, Baotou, Inner Mongolia, China 40.649377, 110.080202 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 40.649377, 110.080202

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 Construction coal: unknown 660 ultra-supercritical 2026 (planned)
Unit 2 Construction coal: unknown 660 ultra-supercritical 2026 (planned)

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Inner Mongolia Energy Group Baotou Xiguitu Power Generation Co Ltd Inner Mongolia Energy Group Baotou Xiguitu Power Generation Co Ltd
Unit 2 Inner Mongolia Energy Group Baotou Xiguitu Power Generation Co Ltd Inner Mongolia Energy Group Baotou Xiguitu Power Generation Co Ltd

Project-level coal details

  • Permit(s): 内能源电力字【2024】445号[1]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The public notice of the social stability risk assessment of Inner Mongolia Energy’s Baotou power station was put out by the Shiguai District local government on 29 May 2024[2]. The environmental impact assessment (EIA) notice was published by the Inner Mongolia Autonomous Region Ecological Environment Bureau in July 2024[3]. According to the EIA report[1], the permit to build was received at the end of June 2024.

News noted that construction started with the pouring of concrete into the foundation of boiler house in June 2025[4] and was scheduled for completion in the second half of 2026[5].

Articles and Resources

References

  1. 1.0 1.1 "内蒙古能源集团包头地区2×66万千瓦煤电项目环境影响报告书" (PDF). 内蒙古自治区生态环境厅网站. 2024-10-29. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. "关于内蒙古能源集团包头地区2×66万千瓦煤电项目社会稳定风险评估情况公示". 石拐区人民政府网站. 2024-05-29. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  3. "内蒙古自治区生态环境厅关于内蒙古能源集团包头地区2*66万千瓦项目环境影响评价文件受理情况的公示". 内蒙古自治区生态环境厅网站. 2024-10-29. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  4. "蒙能4×100万千瓦+4×66万千瓦煤电项目:"项"上发力 "火"热建设". 火电之声 WeChat Official Accounts Platform. 2025-7-4. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  5. "内蒙古能源集团4×66万千瓦煤电项目启动锅炉设备招标". 北极星火力发电网. 2025-08-28. Retrieved 2025-8-28. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)