Inner Mongolia Erdos Dalate Banner "Lead from the Front" solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Inner Mongolia Erdos Dalate Banner Sangge solar farm 达拉特旗格桑光伏电站

Inner Mongolia Erdos Dalate Banner "Lead from the Front" solar farm (达拉特光伏发电领跑奖励激励基地2号100MWp项目(一期), 达拉特光伏发电领跑奖励激励基地2019年4号项目(二期), 达拉特光伏发电领跑奖励激励基地2019年5号项目(二期), 达拉特光伏发电领跑奖励激励基地4号100MWp项目(一期), 达拉特光伏发电领跑奖励激励基地2019年2号项目(二期), 达拉特光伏发电领跑奖励激励基地2019年3号项目(二期), 达拉特光伏发电领跑奖励激励基地2019年1号项目(二期), 达拉特光伏发电领跑奖励激励基地3号100MWp项目(一期), 达拉特光伏发电领跑奖励激励基地1号100MWp项目(一期)) is an operating solar photovoltaic (PV) farm in Zhaojun Town, Dalate Banner, Erduosi (Ordos), Inner Mongolia, China.

Project Details

Table 1: Phase-level project details for Inner Mongolia Erdos Dalate Banner "Lead from the Front" solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1--A1 Operating[1] 2018[1] 100 MWp/dc[2] PV[2] State Power Investment Corporation Limited (国家电力投资集团有限公司)[3] State Power Investment Corporation Limited (国家电力投资集团有限公司)[2]
1--A2 Operating[1] 2018[1] 100 MWp/dc[2] PV[2] CECEP Solar Energy Technology CO LTD (中节能太阳能科技有限公司)[4] CECEP Dalate Banner Solar Energy Technology CO LTD (中节能达拉特旗太阳能科技有限公司)[5]
1--A3 Operating[1] 2018[1] 100 MWp/dc[2] PV[2] China Guangdong Nuclear Power Group CO LTD[66.4%]; Shenzhen CGN Fengtai Investment CO LTD[33.6%] (中国广核集团有限公司[66.4%]; 深圳中广核风太投资有限公司[33.6%])[6] China Guangdong Nuclear Solar Energy Development CO LTD (中广核太阳能开发有限公司)[2]
1--A4 Operating[1] 2018[1] 200 MWp/dc[2] PV[2] State Power Investment Corporation Limited (国家电力投资集团有限公司)[3] State Power Investment Corporation Limited (国家电力投资集团有限公司)[2]
2--A1 Operating[7] 2021[7] 100 MW[7] PV[7] CGN Solar Energy Development CO LTD (中广核太阳能开发有限公司)[8] CGN (Dalate Banner) New Energy CO LTD (中广核(达拉特旗)新能源有限公司)[9]
2--A2 Operating[10] 2021[1] 100 MW[11] PV[11] China Three Gorges Renewables (Group) CO LTD[95%]; Sungrow Power Supply CO LTD[5%] (中国三峡新能源(集团)股份有限公司[95%]; 阳光电源股份有限公司[5%])[12] Three Gorges New Energy Dalate Banner CO LTD (三峡新能源达拉特旗有限公司)[1]
2--A3 Operating[13] 2021[13][14] 100 MW[11] PV[11] Zhejiang Chint Electrics CO LTD[92%]; other[8%] (浙江正泰电器股份有限公司[92%]; 其他[8%])[15] Zhejiang Chint New Energy Development CO LTD (浙江正泰新能源开发有限公司)[13]
2--A4 Operating[16] 2021[16] 100 MW[16] PV[16] State Power Investment Group CO LTD (国家电力投资集团有限公司)[3] State Power Investment Group CO LTD (国家电力投资集团公司)[16]
2--A5 Operating[10] 2021[11] 100 MW[11] PV[11] China Huaneng Group (中国华能集团有限公司)[17] China Huaneng Group (中国华能集团有限公司)[10]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Inner Mongolia Erdos Dalate Banner "Lead from the Front" solar farm

Phase Name Location Coordinates (WGS 84)
1--A1 Zhaojun Town, Dalate Banner, Erduosi (Ordos), Inner Mongolia, China[2] 40.4465, 108.8497 (approximate)[2]
1--A2 Zhaojun Town, Dalate Banner, Erduosi (Ordos), Inner Mongolia, China[2] 40.4465, 108.8497 (approximate)[2]
1--A3 Zhaojun Town, Dalate Banner, Erduosi (Ordos), Inner Mongolia, China[2] 40.4465, 108.8497 (approximate)[2]
1--A4 Zhaojun Town, Dalate Banner, Erduosi (Ordos), Inner Mongolia, China[2] 40.4465, 108.8497 (approximate)[2]
2--A1 Zhaojun Town, Dalate Banner, Erduosi (Ordos), Inner Mongolia, China[2] 40.4465, 108.8497 (approximate)[2]
2--A2 Zhaojun Town, Dalate Banner, Erduosi (Ordos), Inner Mongolia, China[2] 40.4465, 108.8497 (approximate)[2]
2--A3 Zhaojun Town, Dalate Banner, Erduosi (Ordos), Inner Mongolia, China[2] 40.4465, 108.8497 (approximate)[2]
2--A4 Zhaojun Town, Dalate Banner, Erduosi (Ordos), Inner Mongolia, China[2] 40.4465, 108.8497 (approximate)[2]
2--A5 Zhaojun Town, Dalate Banner, Erduosi (Ordos), Inner Mongolia, China[2] 40.4465, 108.8497 (approximate)[2]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 http://guangfu.bjx.com.cn/news/20200323/1056606.shtml. {{cite web}}: Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 2.28 https://new.qq.com/omn/20190724/20190724A0FQVO00.html?pc. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://www.qcc.com/firm/31129248a63d219233a4b07ea4841d66.html. {{cite web}}: Missing or empty |title= (help)
  4. https://www.qcc.com/firm/02d84241345c8a9dffa16231ee552791.html. {{cite web}}: Missing or empty |title= (help)
  5. (PDF) https://xinpi.stcn.com/finalpage/2022-02/22/1212429846.PDF. {{cite web}}: Missing or empty |title= (help)
  6. https://www.qcc.com/firm/9272dab7e60c2fae364f7ed378e49f74.html. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 https://www.energytrend.cn/news/20191226-80108.html. {{cite web}}: Missing or empty |title= (help)
  8. https://www.qcc.com/firm/868c13deb4767ab4ab76f9eae84c0ecc.html. {{cite web}}: Missing or empty |title= (help)
  9. https://www.sohu.com/a/349160987_418320. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 https://www.ne21.com/news/show-162424.html. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 11.4 11.5 11.6 http://guangfu.bjx.com.cn/news/20191009/1011722.shtml. {{cite web}}: Missing or empty |title= (help)
  12. https://www.qcc.com/firm/0237b603730fad98db696d334fcd7c9b.html. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 https://energy.chint.com/index.php/news/news_det/id/10403.html. {{cite web}}: Missing or empty |title= (help)
  14. https://guangfu.bjx.com.cn/news/20210602/1155939.shtml. {{cite web}}: Missing or empty |title= (help)
  15. https://www.qcc.com/firm/c147a8169043c23032577d1b9645ae25.html. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 16.2 16.3 16.4 https://guangfu.bjx.com.cn/news/20210629/1160989.shtml. {{cite web}}: Missing or empty |title= (help)
  17. https://www.qcc.com/firm/2bddc55e2516a56f93afb74e840ba474.html. {{cite web}}: Missing or empty |title= (help)