30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

Inner Mongolia Urad Front Banner (Nao'er Huisheng) Distroibuted wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Inner Mongolia Urad Front Banner (Nao'er Huisheng) Distroibuted wind farm (乌拉特前旗淖尔汇盛能源有限公司乌拉特前旗20MW分散式风电场) is a wind farm in pre-construction in Ming'an, Urad Front Banner, Bayannur, Inner Mongolia, China.

Project Details

Table 1: Phase-level project details for Inner Mongolia Urad Front Banner (Nao'er Huisheng) Distroibuted wind farm

Status Nameplate capacity Type Owner
Pre-construction[1] 20 MW[2] Onshore[2] Urad Front Banner Nao'er Huisheng Energy Co Ltd (乌拉特前旗淖尔汇盛能源有限公司)[2]

Location

Table 2: Phase-level location details for Inner Mongolia Urad Front Banner (Nao'er Huisheng) Distroibuted wind farm

Location Coordinates (WGS 84)
Ming'an, Urad Front Banner, Bayannur, Inner Mongolia, China[2] 40.9430, 109.6350 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. (PDF) http://zrzy.bynr.gov.cn/zwgk/gsgk/jdpjjgss/202302/P020230217633114821698.pdf http://lcj.bynr.gov.cn/xxgk/fdgk/sgs/202407/t20240709_640895.html, http://zrzy.bynr.gov.cn/zwgk/gsgk/jdpjjgss/202302/P020230217633114821698.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 (PDF) http://zrzy.bynr.gov.cn/zwgk/gsgk/jdpjjgss/202302/P020230217633114821698.pdf. {{cite web}}: Missing or empty |title= (help)