30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

Inner Mongolia Urad Rear Banner (Longi) Green Hydrogen wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Inner Mongolia Urad Rear Banner (Longi) Green Hydrogen wind farm (隆基乌拉特后旗风光制氢一体化项目) is a wind farm in pre-construction in Urad Rear Banner, Bayannur, Inner Mongolia, China.

Project Details

Table 1: Phase-level project details for Inner Mongolia Urad Rear Banner (Longi) Green Hydrogen wind farm

Status Nameplate capacity Type Owner
Pre-construction[1] 850 MW[2] Onshore[2] Urad Rear Banner Longfuqi New Energy Technology Co Ltd (乌拉特后旗隆富旗新能源科技有限公司)[2]

Location

Table 2: Phase-level location details for Inner Mongolia Urad Rear Banner (Longi) Green Hydrogen wind farm

Location Coordinates (WGS 84)
Urad Rear Banner, Bayannur, Inner Mongolia, China[2] 41.4280, 107.0780 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Related Projects

This project is related to the following project:


Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240911010622/https://news.bjx.com.cn/html/20240816/1395272.shtml. Archived from the original on 2024-09-11. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20241007154725/https://www.escn.com.cn/20240814/efde3375f60d40f7910e8b9f848faf32/c.html. Archived from the original on 2024-10-07. {{cite web}}: Missing or empty |title= (help)