Iron Ozone 32 steel plant
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Iron Ozone 32 steel plant (Электросталеплавильный цех «Железный Озон 32» (Russian)), also known as Zhelezny Ozon 32; Pervouralsky Novotrubny Plant; Pervouralsk New Pipe Plant; PNTZ, is an electric arc furnace (EAF) steel plant operating in Pervouralsk, Sverdlovsk, Russia.
Location
The map below shows the exact location of the plant in Pervouralsk, Sverdlovsk, Russia:
- Location: Ulitsa Torgovaya, 1, Pervouralsk, Sverdlovskaya Region, Russia, 623104
- Coordinates (WGS 84): 56.902050, 59.992198 (exact)
Background
The electric steel-smelting shop Iron Ozone 32 is located at the site of the Pervouralsky Novotrubny Plant (also known as Pervouralsk New Pipe Plant; PNTZ). The construction of the Iron Ozone 32 began in 2007, and in 2010 the workshop was launched and the first steel smelting took place.[1]
Iron Ozone 32 supplies billet to ChelPipe Electric Steel (CHTPZ) (in Chelyabinsk) and Pervouralsk New Pipe Plant (PNTZ) (in Pervouralsk; shared facility), two other ChelPipe Group companies, for further processing to large diameter pipes.[2]
In 2022, digitization and automatization of the EAF production process and upgrade of the equipment were carried out at Iron Ozone 32.[3]
Plant Details
Table 1: General Plant Details
Plant status | Construction date | Start date | Workforce size |
---|---|---|---|
Operating[4] | 2007[5] | 2010[6][5] | 318[7] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Trubnaya Metallurgicheskaya Kompaniya PAO [100.0%] | 4295887159 [100%] | E100000130737 [100%] | Chelyabinskiy Truboprokatnyi Zavod AO[8] | 4295887141 | E100001012070 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|
semi-finished[4] | billet[9] | energy; building and infrastructure; tools and machinery; transport[10][11] | 2021[12][13] | EAF[4][14] | 1 EAF (125-tonne, began in 2010)[15][4][14] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 950 TTPA[16][17][5][15][14] | 950 TTPA[16][17][5][15][14] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "ЭСПЦ «ЖЕЛЕЗНЫЙ ОЗОН 32» - 10 ЛЕТ". Trubnik Online. Nov 19, 2020. Retrieved Apr 6, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Iron Ozone 32 - Production and Technology («ЖЕЛЕЗНЫЙ ОЗОН 32»)". Chelpipe.ru. Retrieved Jan 25, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "На ПНТЗ внедрили новые технологии в процесс выплавки стали (Russian)". urbc.ru. August 17, 2022. Retrieved October 19, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20230531002017/https://pntz.tmk-group.ru/pntz_capacity. Archived from the original on 31 May 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 https://web.archive.org/web/20200926212711/https://www.kommersant.ru/doc/4397643. Archived from the original on 26 September 2020.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210102052639/https://sdelanounas.ru/blogs/17286/. Archived from the original on 02 January 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220120210711/https://chelpipe.ru/.
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230531004014/https://pntz.tmk-group.ru/pntz_shareholders. Archived from the original on 31 May 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220114035827/http://www.chelpipe.ru/. Archived from the original on 14 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230531005059/https://pntz.tmk-group.ru/pntz_main_prod. Archived from the original on 31 May 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230628115924/https://solidarnost.org/articles/pervouralskiy-novotrubnyy-zavod-kak-rabotaet-odno-iz-krupneyshih-trubnyh-proizvodstv-rossii-videoreportazh.html. Archived from the original on 28 June 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://pntz.tmk-group.ru/storage/files/s-1471/977/sertifikat-sootvetstviya-sem-trebovaniyam-iso-14001-2015pdf.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230530233037/https://pntz.tmk-group.ru/pntz_sertificates. Archived from the original on 30 May 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 (PDF) https://web.archive.org/web/20180417040936/http://www.ebrd.com:80/english/pages/project/eia/37254r.pdf. Archived from the original (PDF) on 17 April 2018.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 15.2 https://web.archive.org/web/20211203221140/https://metallobazy.ru/news/939. Archived from the original on 03 December 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 16.0 16.1 (PDF) https://web.archive.org/web/20220121022216/https://chelpipe.ru/upload/iblock/8b9/Godovoy-otchet-Gruppy-CHTPZ-2020.pdf. Archived from the original (PDF) on 21 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 https://web.archive.org/web/20210721115648/https://www.vedomosti.ru//press_releases/2021/07/21/pervouralskii-novotrubnii-zavod-tmk-vipustil-10-ti-millionnuyu-tonnu-stali. Archived from the original on 21 July 2021.
{{cite web}}
: Missing or empty|title=
(help)