Isalnita (Omv) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Isalnita Solar

Isalnita (Omv) solar farm is a solar photovoltaic (PV) farm in pre-construction in Işalniţa, Dolj County, Oltenia, Romania.

Project Details

Table 1: Phase-level project details for Isalnita (Omv) solar farm

Status Commissioning year Nameplate capacity Technology Owner
Pre-construction[1] 2024 (planned)[2] 111 MW[3] PV[1] Complexul Energetic Oltenia (CE Oltenia); OMV Petrom[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Isalnita (Omv) solar farm

Location Coordinates (WGS 84)
Işalniţa, Dolj County, Oltenia, Romania[4][3] 44.4491, 23.8688 (approximate)[3][4]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://www.pv-magazine.com/2021/09/17/romanian-energy-company-has-725-mw-of-pv-under-development/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://balkangreenenergynews.com/ce-oltenia-omv-petrom-to-build-four-pv-plants-through-jvs/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://www.pv-magazine.com/2021/09/01/romanian-energy-company-wants-to-build-111-mw-solar-park/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://en.wikipedia.org/wiki/Dolj_County. {{cite web}}: Missing or empty |title= (help)