Itautinga Cement Plant
From Global Energy Monitor
This article is part of the Global Cement and Concrete Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Itautinga Cement Plant (Unidade do Cimento Nassau - Itabira) is an integrated cement plant that has been mothballed in Manaus, Amazonas, Brazil.
Location
The map below shows the exact location of the cement plant in Manaus, Amazonas, Brazil[1]:
Coordinates (WGS 84): -3.090327, -59.915041 (exact)[2]
Cement Plant Details
Table 1: General Plant Details
Plant type | Plant status | Start date |
---|---|---|
integrated[3] | Mothballed[4][1] | unknown |
Table 2: Ownership Details
Parent company | Parent company GEM ID | Owner name | Owner company GEM ID |
---|---|---|---|
Itabira Agro Industrial SA [100.0%] | E100002006856 [100.0%] | Itabira Agro Industrial SA [100.0%][1] | E100002006856 [100.0%] |
Table 3: Capacities
Cement capacity (million metric tonnes per annum) | Clinker capacity (million metric tonnes per annum) | Unspecified capacity (million metric tonnes per annum) |
---|---|---|
unknown | >0 | – |
Table 4: Cement Production
Primary cement color | Primary cement type | Production type |
---|---|---|
unknown | unknown | dry[3] |
Articles and Resources
Additional data
To access additional data, including an interactive map of Cement plants, a downloadable dataset, and summary data, please visit the Global Cement and Concrete Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20250425200123/https://cimentonassau.com.br/. Archived from the original on 25 April 2025.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20250416031312/https://www.google.com/maps/place/3%C2%B005'25.2%22S+59%C2%B054'54.2%22W/@-3.094427,-59.9176165,1769m/data=!3m1!1e3!4m5!3m4!4b1!8m2!3d-3.090327!4d-59.915041?entry=tts&g_ep=EgoyMDI0MDcxMC4wKgBIAVAD. Archived from the original on 16 April 2025.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 "Spatial Finance Initiative". 2021.
- ↑ https://web.archive.org/web/20250506003233/https://tribunaonline.com.br/economia/grupo-joao-santos-fecha-2023-com-faturamento-de-r-1-bilhao-164599?home=esp%25C3%25ADrito+santo. Archived from the original on 06 May 2025.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)