JK Cement Bara Cement Plant

From Global Energy Monitor
This article is part of the
Global Cement and Concrete Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

JK Cement Bara Cement Plant is a grinding cement plant under construction in Bara, Uttar Pradesh, India.

Location

The map below shows the exact location of the cement plant in Bara, Uttar Pradesh, India[1]:

Loading map...


Coordinates (WGS 84): 25.200427, 81.568158 (exact)[1]

Background

JK Cement Ltd. was established in 1974.[2]

Jaykeycem (Central) Ltd, a wholly owned subsidiary of JK Cement Ltd, in 2022, proposed to construct a clinker grinding unit at Bara, Uttar Pradesh, with a cement grinding capacity of 2.5 million tonnes per annum (mtpa).[3][4]

In 2023, Jaykaycem (Central) Limited was merged into the parent company JK Cement Ltd.[5][6]

Cement Plant Details

Table 1: General Plant Details

Plant type Plant status Start date
grinding[1] Construction[7] 2025[7]

Table 2: Ownership Details

Additional information including parent company references and full ownership trees available at the Global Energy Ownership Tracker.
Parent company Parent company GEM ID Owner name Owner company GEM ID
J K Cement Ltd [100.0%] E100002002182 [100.0%] J K Cement Ltd [100.0%][1] E100002002182 [100.0%]

Table 3: Capacities

Cement capacity (million metric tonnes per annum) Clinker capacity (million metric tonnes per annum) Unspecified capacity (million metric tonnes per annum)
2.5[1]

Table 4: Cement Production

Primary cement color Primary cement type
grey[1] blended[1]

Articles and Resources

Additional data

To access additional data, including an interactive map of Cement plants, a downloadable dataset, and summary data, please visit the Global Cement and Concrete Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 (PDF) https://environmentclearance.nic.in/writereaddata/Online/TOR/19_Aug_2022_19192330710678465ToR_Presentation.pdf. {{cite web}}: Missing or empty |title= (help)
  2. "About Us | JK Cement". www.jkcement.com. Retrieved 2025-01-28.
  3. "The MoEFCC Reconstituted Expert Appraisal Committee (Industry- 1) In The Presentation For Environmental Clearance - ToR of Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of 2.5 Million TPA along with installation of D.G. Sets of capacity 1750 kVA (1250 / 500 / 250 / 125)" (PDF). environmentclearance.nic.in. 2022-08-19. Retrieved 2025-01-28.{{cite web}}: CS1 maint: url-status (link)
  4. "Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of 2.0 Million TPA along with installation of D.G. Sets of capacity 1750 kVA (1250 / 500 / 250 / 125)". environmentclearance.nic.in. Retrieved 2025-01-29.{{cite web}}: CS1 maint: url-status (link)
  5. staff, Global Cement (2023-03-08). "Jaykaycem (Central) to merge into JK Cement". www.globalcement.com. Retrieved 2025-01-29.
  6. "BSE - Corporate Announcement". m.bseindia.com. Retrieved 2025-01-29.
  7. 7.0 7.1 https://www.projectstoday.com/News/JK-Cement-lays-foundation-stone-of-its-grinding-unit-in-Prayagraj-UP. {{cite web}}: Missing or empty |title= (help)