JK Cement Jaisalmer Cement Plant is an integrated cement plant under construction in Jaisalmer, Rajasthan, India.

Location

The map below shows the exact location of the cement plant in Jaisalmer, Rajasthan, India[1]:

Loading map...


Coordinates (WGS 84): 27.273664, 70.806447 (exact)[2]

Background

JK Cement Ltd. was established in 1974.[3]

In 2024, JK Cement proposed to construct an integrated cement plant at Jaisalmer, Rajasthan, India in a phased manner. The plant is expected to have a clinker capacity of 8 million tonnes per annum (mtpa) and cement manufacturing capacity of 6 mtpa.[4] Phase-I involves setting up of a kiln of capacity 4 mtpa, cement mill of 3 mtpa and a 25 MW waste hear recovery-based power plant. During Phase-II, another kiln of capacity 4 mtpa and a cement mill of capacity 3 mtpa will be installed and the capacity of the power plant raised to 50 MW.[5]

The proposed project is part of an interlinked project with a Limestone Mine - Khinya-II(A) Block, Jaisalmer, Rajasthan. Environmental Clearance for the captive mine has already been granted by MoEF&CC in 2022 with total excavation of 6.04 mtpa.[5] JK Cement Jaisalmer Cement Plant is a greenfield cement plant, started construction in 2025 and is scheduled to complete by early 2027[6].

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Cement Plant Details

Table 1: General Plant Details

Plant type Plant status Start date
integrated[1] construction[7] 2027[7]

Table 2: Ownership Details

Additional information including parent company references and full ownership trees available at the Global Energy Ownership Tracker.
Parent company Parent company GEM ID Owner name Owner company GEM ID
J K Cement Ltd [100.0%] E100002002182 [100.0%] J K Cement Ltd [100.0%][1] E100002002182 [100.0%]

Table 3: Capacities (million metric tonnes per annum)

Cement capacity Clinker capacity
6.00[1] 8.00[1]

Table 4: Cement Production (million metric tonnes per annum)

Primary cement color Primary cement type Clinker substitution rate 2024 -2025 Cement production
grey[1] unknown unknown

Table 5: Clinker Production

Clinker production method Number of operating kilns (accuracy) Number of developing kilns (accuracy) Kiln technology - preheater Kiln technology - precalciner Kiln technology - waste heat recovery
dry[1] 1 (at least) unknown unknown unknown

Table 6: Green Cement Technology

CCS/CCUS Alternative fuel Clay calcination
no unknown[8] no

Articles and Resources

Additional data

To access additional data, including an interactive map of Cement plants, a downloadable dataset, and summary data, please visit the Global Cement and Concrete Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 (PDF) https://www.jkcement.com/wp-content/uploads/2024/10/Jaisalmer-Cement-plant-EC-Compliance-April24-Sept.24.pdf. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://www.jkcement.com/wp-content/uploads/2024/06/EC-Letter_Jaisalmer-Plant_30.09.2024.pdf. {{cite web}}: Missing or empty |title= (help)
  3. "About Us | JK Cement". www.jkcement.com. Retrieved 2025-01-28.
  4. "Six monthly compliance report" (PDF). JK Cement. 2024-11-29. Retrieved 2025-01-29.{{cite web}}: CS1 maint: url-status (link)
  5. 5.0 5.1 "EC Letter" (PDF). JK Cement. 2024-09-30. Retrieved 2025-01-29.{{cite web}}: CS1 maint: url-status (link)
  6. "JK Cement breaks ground on US$340m greenfield cement plant in Rajasthan". www.globalcement.com. Retrieved 2026-05-28.
  7. 7.0 7.1 https://www.globalcement.com/news/19840-jk-cement-breaks-ground-on-us-340m-greenfield-cement-plant-in-rajasthan#:~:text=India%3A%20JK%20Cement%20has%20commenced;for%20completion%20by%20early%202027. {{cite web}}: Missing or empty |title= (help)
  8. (PDF) https://www.jkcement.com/wp-content/uploads/2024/07/Sustainabilty-Report-2023-24-1.pdf. {{cite web}}: Missing or empty |title= (help)