Jawa-3 Combined Cycle power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Jawa-3 Combined Cycle power station is an announced power station in not found, East Java, Indonesia.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Jawa-3 Combined Cycle power station not found, East Java, Indonesia -7.109509, 112.621681 (approximate)[1]
Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1 Announced[2][3][4] fossil gas: natural gas[5] 800[6][4] combined cycle[4] not found 2027 (planned)[7][4]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 PT PLN Nusantara Power [100%][8] PT PLN (Persero) [100.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

As of May 2020, the construction cost of the project was believed to total US$1.2 billion.[9]

Articles and Resources

References

  1. "PT PLN (Persero), RUPTL - Rencana Usaha Penyediaan Tenaga Listrik PT. PLN (Persero) 2019-2028" (PDF). Archived (PDF) from the original on 2019-07-14. Retrieved March 11, 2021.
  2. https://web.archive.org/web/20221203063720/http://www.reconsult.co.id/ourexperience/detail/pltgu-jawa-3-and-pltgu-sumbagut-1-3-4-800-mw. Archived from the original on 2022-12-03. {{cite web}}: Missing or empty |title= (help)
  3. https://www.kwarsahexagon.co.id/our-projects/soil-investigation-pltgu-jawa-3. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 "PT PLN (Persero), RUPTL - Rencana Usaha Penyediaan Tenaga Listrik PT. PLN (Persero) 2021-2030" (PDF). Archived (PDF) from the original on 2021-10-21. Retrieved November 15, 2021.
  5. https://web.archive.org/web/20220419181613/https://www.inframationgroup.com/apac-news-analysis-indonesia-strives-strengthen-gas-prospects. Archived from the original on 2022-04-19. {{cite web}}: Missing or empty |title= (help)
  6. "Anak Usaha PLN Akan Bangun Pembangkit Listrik 800 MW di Gresik". detikfinance. Archived from the original on 2024-06-11. Retrieved 2024-06-04.
  7. https://www.power-technology.com/data-insights/power-plant-profile-jawa-3-combined-cycle-power-plant-indonesia/. {{cite web}}: Missing or empty |title= (help)
  8. (PDF) https://web.archive.org/web/20170207092750/http://datacenter.bappedakaltim.com/data/musrenbangreg/10%202016-03-08-Perspektif-Pengembangan-Sistem-Ketenagalistrikan.pdf. Archived from the original (PDF) on 2017-02-07. {{cite web}}: Missing or empty |title= (help)
  9. Java 3 Gas-Fired Power Plant (800MW), IJGlobal, May 13, 2020

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.