Jawa-Bali 2 power station
From Global Energy Monitor
| Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
| Related categories: |
Jawa-Bali 2 power station is an announced power station in Nusa Tenggara, Indonesia.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Jawa-Bali 2 power station | Nusa Tenggara, Indonesia | -8.34, 115.09 (approximate) |
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| 1 | Announced[1] | fossil gas: natural gas[1] | 450[1] | combined cycle[1] | 2027 (planned)[1] | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 1 | PT PLN (Persero) [100%][1] | PT PLN (Persero) [100.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 (PDF) https://web.archive.org/web/20260311161557/https://gatrik.esdm.go.id/assets/uploads/download_index/files/b967d-ruptl-pln-2025-2034-pub-.pdf. Archived from the original (PDF) on 2026-03-11.
{{cite web}}: Missing or empty|title=(help)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.
