Jhimpir Power (Burj Capital) wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Jhampir Wind Power
Jhimpir Power (Burj Capital) wind farm is an operating wind farm in Thatta District, Sindh, Pakistan.
Project Details
Table 1: Phase-level project details for Jhimpir Power (Burj Capital) wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2018[1] | 50 MW[1] | Onshore[1] | Burj Capital[1] | Harbin Electric; General Electric[1] |
Location
Table 2: Phase-level location details for Jhimpir Power (Burj Capital) wind farm
Location | Coordinates (WGS 84) |
---|---|
Thatta District, Sindh, Pakistan[2][3] | 25.1384, 68.0452 (exact)[2] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 (PDF) https://nepra.org.pk/licensing/Licences/Licence%20Application/2014/July%202014/Application%20of%20Jhimpir.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://goo.gl/maps/PsToBFAQFEhBYpwZ8.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://jhimpirpower.com/index.php/project-location/.
{{cite web}}
: Missing or empty|title=
(help)