Jiangsu Sheyanggang power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Jiangsu Sheyanggang power station (江苏国信射阳港发电厂) is an operating power station of at least 3320-megawatts (MW) in Sheyang Estuary, Sheyang, Yancheng, Jiangsu, China with multiple units, some of which are not currently operating. It is also known as Jiangsu Sheyanggang power station.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Jiangsu Sheyanggang power station Sheyang Estuary, Sheyang, Yancheng, Jiangsu, China 33.8185009, 120.4633498 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Phase IV Unit 7, Phase IV Unit 8: 33.8185009, 120.4633498

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year Emergency/Backup
Phase I Unit 1 Retired coal: unknown[1] 137.5 subcritical – 1992 2008 False
Phase I Unit 2 Retired coal: unknown[1] 137.5 subcritical – 1992 2008 False
Phase II Unit 3 Retired coal: unknown[1] 137.5 subcritical – 1992 2008 False
Phase II Unit 4 Retired coal: unknown[1] 137.5 subcritical – 1992 2008 False
Phase III Unit 5 Operating coal: unknown[1] 660 ultra-supercritical yes 2011 – False
Phase III Unit 6 Operating coal: unknown[1] 660 ultra-supercritical yes 2013 – False
Phase IV Unit 7 Operating[2][3] coal: unknown[1] 1000 ultra-supercritical – 2023[3] – False
Phase IV Unit 8 Operating[4] coal: unknown[1] 1000 ultra-supercritical – 2023 – False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Jiangsu Sheyanggang Power Generation Co Ltd [100%] Jiangsu Guoxin Corp Ltd [85.0%]; Yancheng State-owned Assets Investment Group Co Ltd [12.0%]; unknown [3.0%]
Phase I Unit 2 Jiangsu Sheyanggang Power Generation Co Ltd [100%] Jiangsu Guoxin Corp Ltd [85.0%]; Yancheng State-owned Assets Investment Group Co Ltd [12.0%]; unknown [3.0%]
Phase II Unit 3 Jiangsu Sheyanggang Power Generation Co Ltd [100%] Jiangsu Guoxin Corp Ltd [85.0%]; Yancheng State-owned Assets Investment Group Co Ltd [12.0%]; unknown [3.0%]
Phase II Unit 4 Jiangsu Sheyanggang Power Generation Co Ltd [100%] Jiangsu Guoxin Corp Ltd [85.0%]; Yancheng State-owned Assets Investment Group Co Ltd [12.0%]; unknown [3.0%]
Phase III Unit 5 Jiangsu Sheyanggang Power Generation Co Ltd [100%] Jiangsu Guoxin Corp Ltd [85.0%]; Yancheng State-owned Assets Investment Group Co Ltd [12.0%]; unknown [3.0%]
Phase III Unit 6 Jiangsu Sheyanggang Power Generation Co Ltd [100%] Jiangsu Guoxin Corp Ltd [85.0%]; Yancheng State-owned Assets Investment Group Co Ltd [12.0%]; unknown [3.0%]
Phase IV Unit 7 Jiangsu Sheyanggang Power Generation Co Ltd [100%] Jiangsu Guoxin Corp Ltd [85.0%]; Yancheng State-owned Assets Investment Group Co Ltd [12.0%]; unknown [3.0%]
Phase IV Unit 8 Jiangsu Sheyanggang Power Generation Co Ltd [100%] Jiangsu Guoxin Corp Ltd [85.0%]; Yancheng State-owned Assets Investment Group Co Ltd [12.0%]; unknown [3.0%]

Project-level coal details

  • Coal source(s): domestic/imported

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The first four subcritical coal-fired units of Jiangsu Sheyanggang power station, totaling 540 MW, were brought online in 1992 and retired in 2008. The plant is owned by Jiangsu Guoxin Investment Group.[5]

Units 5-6 totaling 1,320 MW were brought online in 2011-2013.[6][7]

Proposed expansion

In 2015 it was reported that an additional 1,320 MW (2 x 660 MW) has been proposed at the same location.[8][9]

There were no further developments until May 2020, when plans for the units were revived.[10] The units were permitted for construction in December 2020, as 2 x 1,000 MW.[11] Construction began in June 2021.[12]

Plant Details for Retired Units 1-4

  • Sponsor: Jiangsu Guoxin Investment Group
  • Parent company:
  • Location: Sheyang harbor, Sheyang County, Yancheng Prefecture, Jiangsu Province, China
  • Coordinates: 33.8185009, 120.4633498 (exact)
  • Status: Retired (2008)
  • Gross capacity: 540 MW (Units 1-4: 135 MW)
  • Type: Subcritical
  • Start year: 1992
  • Coal type:
  • Coal source:
  • Source of financing:

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  2. ↑ "江苏射阳港电厂1000MW机组投产-北极星火力发电网". news.bjx.com.cn. 2023-09-27. Archived from the original on 2024-01-25. Retrieved 2023-11-09.
  3. ↑ 3.0 3.1 "射阳港电厂2×100万千瓦燃煤发电机组扩建项目1号机组顺利通过168小时试运行,正式投入商业运营". Weixin Official Accounts Platform. 2023-09-27. Archived from the original on 2024-01-25. Retrieved 2023-11-09.
  4. ↑ "江苏国信射阳港电厂2×100万千瓦燃煤发电项目实现年内双投-北极星火力发电网". news.bjx.com.cn. 2023-12-25. Archived from the original on 2024-02-07. Retrieved 2024-01-03.
  5. ↑ "江苏射阳港发电有限责任公司", 江苏省投资协会, 2013-01-11
  6. ↑ "射阳港工程6号机组顺利通过168试运移交生产", 中国能建江苏电建三公司,2013-08-14
  7. ↑ "江苏射阳港发电有限责任公司",中国射阳港, 2013-11-4
  8. ↑ "射阳港将建百万级发电机组," Yancheng Economic and Information Technology Commission, 2015-06-05
  9. ↑ "江苏射阳港发电有限责任公司2015招聘," Nanjing University of Aeronautics and Astronautics, 2015-03-27
  10. ↑ "时隔4年 江苏省2×100万千瓦煤电项目将重新启动," 北极星电力网, 2020/5/19
  11. ↑ "江苏省射阳港电厂2×100万千瓦扩建项目获得核准 - 北极星火力发电网". news.bjx.com.cn. 2020-12-16. Retrieved 2020-12-18.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ "射阳港电厂2×100万千瓦扩建项目开工". BJX. 2021-07-01.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.