Jiangyin LNG Terminal (Zhongtian Energy)
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Jiangyin LNG Terminal (Zhongtian Energy), also known as 中天能源江阴LNG接收站, is a shelved (confirmed) LNG import terminal in China.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Jiangyin LNG Terminal (Zhongtian Energy) | Wuxi, Jiangsu, China[1] | 31.9265543, 120.1294682 (exact) |
The map below shows the exact location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Jiangyin LNG Terminal (Zhongtian Energy) | import[1] | shelved (confirmed)[2] | 2 mtpa[1] | 2.0 mtpa | False | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Jiangyin LNG Terminal (Zhongtian Energy) | import[1] | US$240,000,000 (1,500,000,000 RMB)[3] | US$240,000,000 |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Jiangyin LNG Terminal (Zhongtian Energy) | import[1] | shelved (confirmed)[2] | – | – | – | –[4][4] | 2023 (shelved)[2] |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Jiangyin LNG Terminal (Zhongtian Energy) | import[1] | shelved (confirmed)[2] | Jiangsu Honghai Energy Co Ltd [100%][5] | Qingdao Zhongtian Energy Group Co Ltd [50.0%]; Yingtan Tianbo Hongsheng Investment Center LP [20.0%]; Zhang Yag [13.0%]; Huaxin Century Investment Group Co Ltd [10.0%]; Wuxi Harbor Energy Co Ltd [7.0%] | – |
Background
Jiangyin LNG Terminal is a proposed 2 mtpa LNG import terminal in Jiangsu, China. It was proposed by Zhongtian Energy and was planned for operation in 2018.[6]
In August 2018 it was reported that construction of the first storage tank was complete.[7]
The parent company Zhongxing Tianheng Energy Technology (Beijing) Co., Ltd. Changed its name to Zhongxing Tianheng Energy Technology (Beijing) Co., Ltd. in October 2019.[8]
The company complained that the local government breached the contract, causing a delay in construction.[9] The local government didn't appear to have responded. The project was planned to operate in 2021.[9][10]
In 2021, the project was shelved by the local court for three years, with constructions to restart in 2024.[11]
The Parent company Zhongxing Tianheng Energy Technology (Beijing) Co., Ltd., was delisted in July 2022. The owner of this project was put for auction. The project was reportedly 99% completed. [12]
In January 2023, the owner of the LNG project, Jiangsu Honghai Energy Co., Ltd., was ordered by the court to enter the bankruptcy and reorganisation. No final result comes out as of February 2024.[13][14]
As of June 2025, there is no news about its status. It's considered shelved.
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://finance.sina.cn/2023-01-12/detail-imxzwrws2126349.d.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 https://finance.sina.com.cn/jjxw/2023-01-12/doc-imxzwrws2126349.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.sohu.com/a/564058144_121124362.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://gas.in-en.com/html/gas-3396280.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.gongsi.com.cn/detail/27711858-4605-39b7-bde1-59b6b3dade321.
{{cite web}}: Missing or empty|title=(help) - ↑ Zhongtian Energy: additional approval, LNG integration will accelerate the industrial chain, BBS.QQ.com, 23 June 2017
- ↑ 中天能源江阴LNG项目完成阶段安全检查, Sohu, Aug. 13, 2018
- ↑ "*ST中天(600856)公司资料_新浪财经_新浪网". vip.stock.finance.sina.com.cn. Retrieved 2021-04-08.
- ↑ 9.0 9.1 "地方政府不作为?中天能源召开媒体见面会,通报江阴接收站进展! - 江西省天然气集团有限公司". www.jxngh.com. 2020-08-12. Retrieved 2021-03-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "民企实践LNG接收站储运产业的机遇和挑战,泓海陈清兵一席谈". www.ishipoffshore.com. 2021-04-05. Retrieved 2021-04-08.
{{cite web}}: CS1 maint: url-status (link) - ↑ "超50亿,江阴接收站混战!中天查封,嘉盛开工!内河真香?". www.hxny.com. Retrieved 2022-06-27.
- ↑ "独家|中天能源核心资产面临单独破产重整 3.3万名中小股东将难见"回头钱"?--每日经济新闻". finance.sina.com.cn. 2023-01-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ sina_mobile (2023-01-12). "独家|中天能源核心资产面临单独破产重整 3.3万名中小股东将难见"回头钱"?". finance.sina.cn.
{{cite web}}: CS1 maint: url-status (link) - ↑ "优选托管机构保值核心资产,企业停摆十年再度启航_新华网江苏频道--来源:江阴市人民法院". js.news.cn. 2023-08-24.
{{cite web}}: CS1 maint: url-status (link)