Jianli Bailuo cogen power station (监利白螺工业园热电) is an operating power station of at least 280-megawatts (MW) in Bailuo Town, Jianli, Jingzhou, Hubei, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Jianli Bailuo cogen power station Bailuo Town, Jianli, Jingzhou, Hubei, China 29.630998, 113.258829 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase III Unit 2, Phase III Unit 3, Phase III Unit 4, Unit 2, Unit 3: 29.630998, 113.258829

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Phase III Unit 2 Operating coal: bituminous[1][2] 80[1] subcritical[1] yes[1] 2025 False
Phase III Unit 3 Operating coal: bituminous[1][2] 100[1] subcritical[1] yes[1] 2025 False
Phase III Unit 4 Operating coal: bituminous[1][2] 100[1] subcritical[1] yes[1] 2025 False
Unit 2 Cancelled coal: bituminous[2] 80 unknown yes 2024 False
Unit 3 Cancelled coal: bituminous[2] 80 unknown yes 2024 (planned) False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase III Unit 2 Jianli Fenghui Public Resources Investment Management Co Ltd [100%][1] Jianli City Development Investment Group Co Ltd [98.2%]; unknown [1.8%]
Phase III Unit 3 Jianli Fenghui Public Resources Investment Management Co Ltd [100%][1] Jianli City Development Investment Group Co Ltd [98.2%]; unknown [1.8%]
Phase III Unit 4 Jianli Fenghui Public Resources Investment Management Co Ltd [100%][1] Jianli City Development Investment Group Co Ltd [98.2%]; unknown [1.8%]
Unit 2 Jianli Fenghui Public Resources Investment Management Co Ltd [100%][1] Jianli City Development Investment Group Co Ltd [98.2%]; unknown [1.8%]
Unit 3 Jianli Fenghui Public Resources Investment Management Co Ltd [100%][1] Jianli City Development Investment Group Co Ltd [98.2%]; unknown [1.8%]

Project-level coal details

  • Coal source(s): domestic/imported
  • Permit(s): 监发改审批〔2024〕362号[3]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

An industrial park is planning a coal-fired power station expansion to supply heat and electricity to paper mills and other industrial enterprises. A draft Environmental Impact Assessment (EIA) for 2 x 80 MW was released for comment in December 2021. A preliminary 18 MW phase was underway for completion by the end of 2021. It began construction illegally and was fined by environmental authorities.[4]

An earlier version proposed one 80 MW phase and an additional 50 MW phase.[5]

The Phase III expansion project received approval in November 2024[6]. Environmental impact approval occurred in December 2024[7].

Satellite imagery showed four units operating by December 2025 and May 2026, with one unit starting construction in 2024 and beginning operations around late 2025[8].

Articles and Resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 https://xunbiaobao.baidu.com/biddingDetail?id=b727a4c1af2ad51e7dd322425a8835bb48870016&source=seo. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  3. http://zwgk.jianli.gov.cn/jlsfzhggj/12422/112220243/t127220243124/559238.shtml. {{cite web}}: Missing or empty |title= (help)
  4. 监利丰辉公共资源投资管理有限公司白螺工业园区热电联产2*80MW燃煤背压机扩建项目环境影响报告书公示, Jingzhou Municipal Ecological Environment Bureau, 2021-12-01
  5. 监利丰辉公共资源投资管理有限公司 《监利市白螺工业园热电联产项目(扩建)环境影响报告书》(报批公示稿), Jianli, 2021-06-10
  6. "监利市发展和改革局关于监利市白螺工业园区热电联产三期扩建项目核准的批复". 监利市人民政府. 2024-11-29. Retrieved 2025-06-01.{{cite web}}: CS1 maint: url-status (link)
  7. "荆州市生态环境局关于监利市景和兴新产业投资有限公司白螺工业园区热电联产三期扩建项目环境影响报告书的批复" (PDF). 荆州市生态环境局. 2024-12-26. Retrieved 2025-06-01.{{cite web}}: CS1 maint: url-status (link)
  8. "Planet satellite imagery". Planet Labs. 2025-12. {{cite web}}: Check date values in: |date= (help); Missing or empty |url= (help)CS1 maint: url-status (link)